Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Low price professional custom stainless steel outer coil heating tank 80 tons

Low price professional custom stainless steel outer coil heating tank 80 tons
Low price professional custom stainless steel outer coil heating tank 80 tons
Low price professional custom stainless steel outer coil heating tank 80 tons

Larger photo of automa dispenser

Company:Liangshan used chemical equipment operators Yun-ho
Information Name: Low price professional custom stainless steel outer coil heating tank 80 tons
Update Time:2015-04-30
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
Wuxi Xuelang existing production of stainless steel scraper film evaporator 2-20 square sale, thin film evaporator is an evaporator type, characterized by heating the material along the wall was a film of liquid flow and heat transfer and evaporation, the advantages of high heat transfer efficiency, fast evaporation, evaporation material stay time is short, it is particularly suitable for heat-sensitive material evaporated. Filming reasons and in accordance with the direction of flow can be divided into rising film evaporator, falling film evaporator. Wiped film evaporator three types. Film evaporator unit is composed of a thin film evaporator evaporator, vapor-liquid separator, preheater three parts and a simple separator composed of a rising film evaporator tube heat exchanger. The evaporator has a large capacity, high efficiency, short heating time, etc., for the pharmaceutical, food and chemical industries concentrated dilute solution, the equipment and material contact parts are made of stainless steel, has good corrosion resistance, durable, in line with the pharmacy health requirements. Edit this paragraph technical parameters model, the parameter BM2.2 BM5.5 BM8 BM12 BM16 evaporation area 2.2 5.5 81216 evaporated working pressure Mpa 0.4 0.4 0.4 0.4 0.4 Evaporation 1,403,505,508,501,100 steam consumption 1,553,856,059,351,265 Weight Kg 300 520 750 1020 1250 Dimensions mm 2000 * 650 * 3500 2300 * 800 * 3500 2700 * 950 * 4500 2900 * 950 * 5000 2900 * 950 * 5200 Edit this paragraph a thin-film evaporator for safe operation. 1. Before installing the factory has been the overall test, the user can put the whole lifting device to device basis. 2. The equipment should be overall leveling, leveling position can refer gear rack plane. And the device is fixed to the floor surface or steel. 3. For larger size equipment in order to increase the stability of the device can be in the appropriate parts of the upper end of the flange, increasing the horizontal auxiliary support auxiliary equipment fulcrum is limited only by the radial displacement, without limiting the axial displacement. The preparation according to process requirements well pipe, emptying the foreign body, clean replacement equipment, power. II. 1. The products manufactured before driving preparation before the pressure test conducted and commissioning, indicators in line drawings. 2. Start the motor, check the stirring direction of rotation meets the design requirements, top clockwise, it can not be reversed. 3. In the mechanical seal radial measurement axis and axial string momentum swing, meets the design requirements. And check the mechanical seal and the upper end cap is tightened and tighten the cap should be in the state. 4. Check the reduction case oil level, the oil level should be within the normal level. III. 1. Normal driving first open circulating cooling water pump, so that the water jet condenser is running. Open concentrate container, vacuum valves. 2. Open the feed valve, relying on the degree of vacuum from the high slot to feed liquid pumped into the device. 3. Turn on the power and start rotating film evaporator motor, observe the motor rotation direction is correct. 4. Slowly open the steam valve and let steam into the jacket, the jacket from the bypass valve to exclude non-condensable gases, and then turn on the trap. Adjust the vapor pressure of about 0.15Mpa. 5. From the bottom of the sight glass to observe the material circumstances, is prohibited inside the machine running is filled with liquid. 6. The system is stable after 5 minutes, the sample analysis concentrate concentration, adjusting the feed so that the size of the valve opening amount of concentrate needed to reach a predetermined concentration. 7. When the liquid concentrate container full, follow the steps to switch to another vessel. 8. If the user conditions permit, raise the height of the evaporator, the two can not concentrate container, or directly to the concentrate was extracted with automatic speed control pump. Four. 1. First off steam normal stop valve. 2. Close the inlet valve. 3. When the evaporator feed solution after the release of the net, close the valve. 4. added to the evaporator water about 60 degrees wash, rinse the equipment. 5. The power machine. 6. Stop circulating pump, stop the jet pump, open the vacuum breaking valve, the system is in normal pressure. Five. Emergency stop 1. The following circumstances should an emergency stop 1) a sudden power failure or sudden tripping. 2) Steam valve failure, the pressure exceeds a predetermined pressure. 3) Feed suddenly broken material. 4) Mechanical abnormal crash. 2. Emergency Stop order 1) Immediately turn off the steam valve and the inlet valve. 2) Turn off all power to the system and turn off the motor. 3) The remaining parking by normal procedure. VI. Safety and precautions 1) Do not start the motor in the absence of stirring feed liquid / liquid fill material situation. 2) Do not reverse direction. 3) Do not touch the rotating parts during operation. 4) pay attention to electrical safety, do not wet hands pushed the button. 5) When the internal device temperature exceeds 150 degrees or more, please give special instructions when ordering. Seven. Maintenance 1) gear lubricants 40 # engine oil, which indicates the amount of fuel should be within the height. Too much oil can cause agitation, fever, body oil too little eccentric shaft pump heat led to the destruction of the oil film temperature. Replace the beginning of the second lubricating oil used within a month, after the first oil change within 3-4 months. 2) Open the low head, unscrew the bolt at the bottom of the U-groove rotor, blade replacement blade inspection every four months. 3) every two months to open the bottom bearing, check the bottom bearing wear, if necessary, replace the bottom bearing. 4) The nature of the material should be regularly soaked with warm water or solvent, washing the inner cylinder. 5) per month plus sealing liquid to the mechanical seal chamber once the seal liquid 20 # mechanical oil 
Contact Detail
Company Name: Liangshan used chemical equipment operators Yun-ho
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Wang Xu wave()
Telephone Number: 0537-7600770-01
Company Address: Jining, Jining City, Shandong Province, China
Zip/Postal Code:
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450