Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Shandong factory direct wing of St. brand silicone waterproof coating

Shandong factory direct wing of St. brand silicone waterproof coating
Shandong factory direct wing of St. brand silicone waterproof coating
Shandong factory direct wing of St. brand silicone waterproof coating

Larger photo of automa dispenser

Company:Weifang Rong Jing waterproof Engineering Limited
Information Name: Shandong factory direct wing of St. brand silicone waterproof coating
Update Time:2015-04-29
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
Introduction Rong San G01 high elastic waterproof coating is the introduction of environmentally friendly technology and the production of proprietary Canada contains a special active chemicals to penetrate the crystalline-based inorganic waterproof material, waterproof superior performance, is a non-toxic and pollution-free green waterproof coating . Mainly used for rigid concrete works, stable waterproof performance after construction, to good effect. Product Features 1, the paint and concrete combination can be made to penetrate the concrete to form insoluble crystals in the concrete, filling pores Road, so that the concrete dense and waterproof. Paint treated concrete water after many years, the material of the active substance can reactivate, concrete components are not fully hydrated again will crystallize, crack closure late formation. 2, is inorganic, not aging, basically the same coefficient of expansion of concrete, waterproof life and the life of the basic structure is the same, and has enhanced the durability of concrete, anti-carbonation process of concrete to prevent steel corrosion. 3, the construction process is simple, no hot work construction, non-toxic, non-irritating odor. 4, can withstand strong water pressure of 1.5MPa-1.9MPa. 5, the construction is simple, to the role in the positive side, is also applied to the back surface of the water; energy construction in the wet base surface, the coating surface can also do other coatings. On the surface of the concrete structure does not require leveling layer, the construction nor do they need to do protective layer for 7 days after completion of basement exterior wall backfill can not cause damage to the waterproof coating. Adaptation: 1, underground engineering, rigid waterproof reservoir engineering, such as building basements, tunnels, swimming pools, dams and the like. It can be used for positive side, but also for the back surface. 2, waterproof concrete structures used in open-air environment, appropriate measures should be adopted. 3, the cracks will alternate deformation structure, settlement joints filled with flexible material, Deformation, paint does not apply. 4, when the ambient temperature is 4 ℃, not construction paint. Technical requirements: 1, for roofing primary surface should be smooth, uniform, no sharp edges and corners, punch at the processing level. 2, the slope of the grass-roots level, to meet the design specifications and requirements of GB50345-2004, and does not appear water phenomenon. 3, Yin-Yang angle portion connected to the grassroots and skylights, Deformation, drowning mouth, flue, etc., should all be made uniform, smooth or rounded corners have character, parapet and grass-roots level as light, set aside the groove or eyebrow bricks. 4, the dust on the roof of grass, oil, debris and other debris cleared away. 5, general grass after construction, natural ventilation in 4-5 days to dry conditions for brushing construction. Construction Technology: 1, which is carried out before the construction waterproof coating Stir, add water when you are not free to use. 2, the product is brushing method or roller construction method, brushing stroke length should be the same direction, all over the overcoat layer should alternately, brushing should be uniform. Waterproof paint should be applied over the delaminating. 3, each pass should be dry before brushing the front again (applied by hand sticky appropriate). 4, the laying of the carcass fabric, lap not less than 5cm. When laying the carcass reinforcing material in the coating, should spread the carcass side coated side cloth, scraping the carcass should discharge the bubble, the paint soaked carcass, covering completely, without the carcass exposed phenomenon .. Technical parameters: No. Index name 1 1-4 hours dry time, 25 ℃, relative humidity of 40% 2-dry time seven days, 25 ℃, relative humidity of 40% 3-density 1.5 ± 0.05 kg / liter 4 Construction temperature +5 ℃ ~ + 42 ℃ 5 scope of -50 ℃ ~ + 86 ℃ 6 waterproofing coating thickness of 1.0mm-2.0mm 7 elongation> 300% 8 construction technology dedicated large brush, small brush cleaning brush scissors 9 must be with water clean and soak the next construction, no water covered areas to make the appropriate treatment. 
Contact Detail
Company Name: Weifang Rong Jing waterproof Engineering Limited
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Fengjing Li(Director of Sales Marketing Center)
Telephone Number: 0536-5547999
Company Address: Shouguang City, Shandong Province Town Industrial Park, Taiwan, , Shandong Province, China
Zip/Postal Code: 262700
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450