SAP reactive waterproof adhesive
SAP reactive waterproof adhesive
I. Product Overview SAP response waterproof adhesive is made from a waterproof Ltd. Aldiss independently developed a revolutionary waterproof bonding material, the appearance of a single component black viscous liquid, the main component in natural asphalt and petroleum bitumen blend was added petroleum-based active-reactive substances, SAP reactive adhesive is mainly used for waterproof bonding waterproof concrete deck, steel deck, composite pavement, roads and special construction of the tunnel. Second, the performance characteristics 1, excellent water effects (1) CONSOLIDATION role. After SAP reactive adhesive waterproof construction, in which the activity of the reaction mass to clean extremely easy to penetrate the pores of the concrete, resulting in physical and chemical reactions, clogged pores, concrete repair small defects, played excellent water Waterproof (2) an elastic gelatinous material; effect. Construction, SAP reactive waterproof adhesive in petroleum-based active-reactive substances capable of copolymerization of physical and chemical reaction to produce a certain intensity of the elastic gel material, played excellent waterproof effect; (3) ELASTOPLASTIC gelatinous material waterproof. Pavement implementation process, the high temperature will accelerate the curing effect quickly produce elastic-plastic waterproof adhesive layer to avoid piercing the action of heat during the course of the asphalt pavement waterproof bonding layer, while ensuring waterproof adhesive material during use The waterproof effect. 2, excellent adhesion properties (1) CONSOLIDATION role. After SAP reactive adhesive waterproof construction, in which the active-reactive substances seep into the clean cement concrete pores, clogged pores, concrete repair small defects, forming a strong bond interface effect and nail, fresh concrete at room temperature and shear bond strength and asphalt concrete can reach 1.0MPa or more, to prevent delamination between the road, the passage of the disease generation. (2) wedging action. Pavement implementation process, the initial curing of waterproof adhesive layer at high temperatures (above 100 ℃) of asphalt concrete action will have a slightly melt distribution at large rolling action aggregate particles are embedded waterproof adhesive layer is formed uniformly distributed shear key, effectively enhance the adhesion of pavement with waterproof adhesive layer. (3) cohesion. SAP reactive response waterproof adhesive waterproof adhesive with a high cohesion, can resist shear failure of their own, fully cured, cohesion waterproof adhesive material is further improved, SAP reactive adhesive is fully cured to form a waterproof elastic-plastic waterproof adhesive base surface has a more lasting durability than asphalt concrete pavement, can improve the durability and safety of the building structure. 3, to facilitate construction. SAP reactive adhesive waterproof artificial coating, spraying or spraying construction machinery, construction convenient and fast. 4, environmental friendly. SAP reactive waterproof adhesive contains no volatile solvents, no pollution to the environment, without any harm to humans and animals. Third, the construction uses SAP reactive bonding waterproof adhesive can be used to waterproof concrete bridge deck, steel deck waterproofing waterproof adhesive, waterproof adhesive composite pavement, waterproof adhesive tunnel road, special construction adhesive knot. Fourth, the construction process of cleaning up the grassroots - key parts of the process - many times spray - waterproof layer conservation - paving asphalt concrete five, the amount of the surface layer is generally 0.5-1.0 kg / m, and according to engineering-grade adjustment. VI Notes 1, before the construction should be brown brush, brush full invasion, make it soft and smooth brushing. 2, the temperature is below 0 ℃ or above 35 ℃ not construction (construction of high temperature should be avoided). 3, storage temperature 5 ℃ -35 ℃ appropriate. 4, should be selected no construction within four hours of rain and snow. 5, the film is not dried or asphalt pavement with the former, stampede and cars exercised strictly prohibited. 6, construction tools immediately after use with water wash and clean for reuse. Seven, packaging, shelf 50kg plastic drum or 200kg metal pail shelf life 6 months
Contact Detail
Company Name: | Chemical Building Materials Co., Ltd. Guangzhou Hong Ch.. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Xiao Li() |
Telephone Number: | 020-81346639 020-66620328 |
Company Address: | Leung Tin Industrial Zone, , Guangdong, China |
Zip/Postal Code: |
Find More Related Products
- Deck aqueous bitumen-based ..
- DPS crystal infiltration co..
- FEG-3 road and bridge speci..
- AWP-2000F-type bridge deck ..
- Epoxysilane improved immers..
- YN polymer asphalt bridge d..
- Chengdu to Zhuzhou logistic..
- PD-1 type bridge with polym..
- AE-2-5 aqueous bitumen-base..
- SBR modified asphalt bridge..
- FYT-1 bridge special waterp..
- HM-1500 deck waterproof coa..
- PB BRIDGES polymer modified..
- APP polymer modified bitume..
- Perlite insulation board eq..
- BMP-3 road and bridge water..
- Railway bridge with high st..
- PMC Polymer waterproof coat..
- AMP-100 second-order reacti..
- Special equipment to handle..
- Where old and new concrete ..