Home
Products
Water cycle cooling machine, Nanjing cooling machine, Bo Sheng Refrigeration Equipment Show
Water cycle cooling machine, Nanjing cooling machine, Bo Sheng Refrigeration Equipment Show
Water cycle cooling machine, Nanjing cooling machine, Bo Sheng Refrigeration Equipment Show
Resolve on the chiller compressor displacement we know the group consisting of compression chillers refrigeration compressors, cold suspect, the throttle valve, an evaporator composed of four parts, the four components connected through a pipe into a closed system, the compressor As the heart of the chiller, it plays a pivotal role, then how to improve the displacement (volume of gas) compressor to increase the output coefficient it? The following is a summary for everyone Bo Sheng refrigeration points: Under normal circumstances use the following method 1, the intake and exhaust Laval behalf of sensitivity; tightness 2, gas cutting and stuffing box; 3, piston rings to maintain rigor; 4, keeping the output pipes, gas cutting, gas tank and cooler rigor; 5, the correct choice of the size of the void volume; 6, should the suction drier and cooler gas; 7, an appropriate increase in the speed of the air compressor ; if necessary, to clean cylinders and other parts Bo Sheng imported high-quality new chiller compressor inlet filter, expansion valve, high and low tables, temperature controller and other major parts, compressor overload: When the chiller load is too large when the water temperature is too high, the machine stops running, so as to avoid damage to the compressor. 1, the product according to the design characteristics of industrial applications built cryogenic freezing water circulating pump and stainless steel water tank, 2 extremely easy to use, all materials in contact with water are made of corrosion resistant materials, prevent rust, corrosion 3, the number of micro-LED controller with temperature display, set temperature and automatically adjust the cold water temperature and compressor delay protection 4. Famous brand contactors, relays and other electrical components, equipped indicator lights, switches, operation at a glance, built-in electronic level indication and alarm devices, low water level alarm, the operator through the control panel will be able to grasp the cold tank water level, timely replenishment, the unique modular design. 5. Each compressor system security independent, even if a system problem, and will not affect the normal operation of other systems. Precautions safe operation of the chiller: 7. In no load condition, the water flow should be stable. 8. All chilled water and cooling water piping design and installation should be conventional methods, chilled water pumps to be located on the inlet of the unit, in order to ensure positive pressure and flow within the unit. The pipe should be set up to ensure proper damping pipe elasticity, but also to prevent the evaporator pump is stopped when the water is drained. 9. The pipeline should be independent of the solid support chillers avoid stress exerted on the component chillers. Set up to facilitate the pipe hanger alignment. 10. In order to reduce noise and vibration isolator is best to install in the pipeline. 11. In order to cost-effective use chillers, water treatment experts recommended that the quality of water of the evaporator and condenser, poor water quality can cause fouling affect heat transfer, corrosion or precipitation, the breeding of organic matter, affect the performance of the unit, increase operating and maintenance costs.
Contact Detail
Company Name: | Nanjing Bo Shing Refrigeration Equipment Co., Ltd. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Mr. Mei(Sales Manager) |
Telephone Number: | 025-68571021 |
Company Address: | -10 Ri Jiangning District Ankang Road Town Industrial Zone, Ankang City, Jiangsu Province, China |
Zip/Postal Code: | 211164 |
Find More Related Products
- Chemical reactor temperatur..
- _ Job _ Song Datuk Careers
- Insulation board drying roo..
- Song Datuk how to do market..
- Yueda stainless steel chain..
- Low price Used chemical equ..
- Ningbo early treatment of l..
- Urumqi car wash grille
- Flash dryer drying expert X..
- Yueda chain network length ..
- Reducing joint 68 zinc allo..
- Jining 60 tons of used stai..
- Transfer 500 kg stainless s..
- Processing a 0.3 t single-e..
- Chengdu to Foping freight l..
- Spray drying equipment pric..
- Meishan B network with Yued..
- Ganzhou mesh belt conveyor,..
- Belt dryer _ _ high quality..
- Processing an annual output..
- Constant-dried Fig purchase..