Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

2015 new broken agent

2015 new broken agent
2015 new broken agent
2015 new broken agent

Larger photo of automa dispenser

Company:Xuzhou Quanshanqu helper Building Materials Distribution
Information Name: 2015 new broken agent
Update Time:2015-04-30
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
Broken agent security measures: ① operator mishandling. Including drug has fever still steaming bottling, filling not dense air barrier like; ② improper temperature control. High temperature, the mixing water, pharmaceutical, drill hole wall temperature abuse, the inhibitor dose is not enough, resulting in rapid chemical reaction, etc; ③ improper selection of drill hole diameter too big. Punching when the temperature is high and corrosive agents, into the cornea may have caused serious damage to the eye. To prevent injury accident, the operator must wear safety standards in line with the national anti-shock PVC dust goggles to operate. Control drug reaction broken agent time: Pharmaceutics reaction speed and temperature have a direct relationship, the higher the temperature, the faster the response time, otherwise slow. In practice, control drug reaction time is too fast, there are two ways, one is added to the water in mixing inhibitor. Another approach is to strictly control the mixing water, dry powder and rock (or concrete) temperatures. Summer high temperatures, before crushing response to be crushed blocked, agents stored at low temperature to avoid exposure. The mixing water temperature controlled at 15 ℃. Pharmacy (volume) reaction time punching too prone to injury accident, but also affect the construction effect, increasing the construction cost. To prevent accidents, in addition to taking the necessary security measures, but also with inhibitors of my company with the delay response time. Soak inhibitor drug (volumes) mixing water. Mixing water is added in an amount of 0.5% - 6%. The higher the temperature, the more the amount, otherwise less. Low winter temperatures, chemical reaction time will be extended to the construction inconvenience, the general solution is added precipitating agent, and mixing water temperature increase. Precipitating agent is added too much, will reduce the medicament expansive force. Mixing water temperature appropriately according to the actual increase, but the maximum should not exceed 50 ℃. The reaction time is about 15 - 30 minutes is better, can shorten the reaction time according to the actual situation, in order to facilitate construction. 2015 more new broken agent visit http://www.xzbsjc.com/ 
Contact Detail
Company Name: Xuzhou Quanshanqu helper Building Materials Distribution
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Rong Jingli(Office Manager)
Telephone Number: 0516-83797776
Company Address: Quanshanqu Wind South China Garden YingYeFang 2 # -013, , Jiangsu Province, China
Zip/Postal Code: 221000
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450