Waterproof coating paint the top ten brands tricolor tree Agent
Waterproof coating paint the top ten brands tricolor tree Agent
J refers composite waterproof coating polymer, S cement; that is, JS polymer cement waterproof coating to also known as JS composite waterproof coating ("JS" is "polymer cement" JS composite waterproof coating [1] phonetic prefix) It is a polyacrylate emulsion, ethylene - organic liquid material, and cement, quartz sand, weight calcium carbonate and other inorganic fillers and various additives, vinyl acetate copolymer emulsion polymer emulsion and various additives consisting of inorganic powder by a reasonable proportion of the composite made of a two-component, water-based building waterproof coating. Edit this paragraph Features 1, wet surface construction; coating toughness, high strength. 2, by adding color pigments can be made decorative layer. 3, non-toxic, tasteless, edible pool of water can be used. 4, suitable for decorative materials walls, inclined roof waterproofing, facade, ramps and the top surface of the construction, to a variety of outer material firm adhesion to the base surface and decorative tile, roofing tile, cement mortar. 5, high temperature (140 ℃), especially for road and bridge waterproofing. 6, adjusting the mixture ratio, tile adhesive material and sealing material can be made. Edit this paragraph Scope 1, industrial and civil roofing. 2, toilet and bathroom, kitchen waterproof, moisture-proof project. 3, walls, basements, swimming pools, water tanks and so on. 4, the waterproof coating points Ⅰ and type Ⅱ two usage is different. ①JS-Ⅰ type is mainly used for large deformation of parts such as the roof, basement. ②JS-Ⅱ type is mainly used for small parts such as deformation of walls, toilet and bathroom and so on. Edit this paragraph Specifications Executive Standard: JC / No. T894--2001 Item Specification I type II type 1 solids content,% ≥ 6.5 2 Dry time, h ≤ 4 3 Drying time, h ≤ 8 4 tensile strength, Mpa ≥ 1.2 1.8 5 elongation at break,% 200 806 low temperature flexibility, ф10mm bar -10 ℃, no crack --7 impermeability: 0.3Mpa, 30min impervious impervious 8 impermeability, Mpa ≥ - 0.6 edit this section Method Select Method Ⅰ base hit bottom → → → coating on the coating under Method Ⅱ base hit bottom surface → → → By coating the coating on the coating Method → ??Ⅲ base hit bottom → → → nonwoven undercoat cloth layer coating → → in the top layer [2] Edit this paragraph Application: basement, toilet and bath, swimming pool, drinking water projects and various irregular shaped parts of the waterproof, impermeable, moisture and the like. Material Features: direct construction of the base surface wet or dry in a variety of materials. Non-toxic, tasteless, non-polluting. Construction safety, simple, short construction period. Coating toughness, high strength, flexibility, weather resistance, excellent durability. Waterproof effect, and grass-roots firmly bonded. Performance: "JC / T894-2001" Scope: in the kitchen, bathroom, bathroom, acid and alkali corrosion parts of the waterproof, impervious. Ground floor, balcony, roof terrace and walls of water, seepage. Wood floor moisture works. Waterproofing basements, subways, tunnels, construction methods seepage Edit this paragraph 1, the base surface must be flat, firm, clean, no clear water, must first leveling unevenness of yin and yang angle arc angle should be made. 2, according to a predetermined ratio reclaimer, if necessary, add water, before adding the liquid compound with a stirrer was added with stirring. Stir until the compound does not contain aggregate (mixing time of 3 minutes or more, and preferably not stirred by hand). Subbing layer coating weight ratio: liquid material: powder: water = (Ⅰ) 10:10:10, (Ⅱ) 10:10:10, with about 0.5kg / m; the lower, middle and upper coating weight Total ratio: liquid material: powder: water = (Ⅰ) 10: 7: 0-1, (Ⅱ) 10: 10: 0-2, each about 1kg / m. The upper layer coating can be pigmented to form a colored waterproof layer. Water within the specified range, slope, top, or facade construction without adding or less, plane construction should add more. The amount per square meter 3 ~ 4kg, construction thickness 1.5-2mm. 3. Select the appropriate tool (roller, brush or scraper, etc.), in accordance with the relevant labor laws, according to the underlying primer layer → → middle → upper layer by layer to complete the order. 4, mortar protective layer or decorative layer construction, to be completed in 2 days after waterproof layer. Wiping mortar, in order to facilitate the construction, waterproof layer should be in the final again after brushing, immediately sprinkle with coarse sand clean. If liquid material: powder = 10: 20-30 into a putty-like, can be used as adhesive, sealing material. Caution Do not edit this paragraph or rain construction below 0 ℃, not construction in extremely wet and airless environment.
Contact Detail
Company Name: | Sun Hung Kai Chemical Group Co., Ltd. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Zhujing() |
Telephone Number: | 0757-29930697 |
Company Address: | Foshan, Foshan City, Guangdong, China |
Zip/Postal Code: |
Find More Related Products
- Ten brand wall paint 3D ori..
- Ten healthy breath of fresh..
- Paint the top ten brands tr..
- Three-color paint tree heal..
- Paint the top ten brands, t..
- Paint the top ten brands of..
- Interior alkali primer
- Mildew proof interior latex..
- Super-resistant paint coati..
- China's top ten brand paint..
- Nantong green paint brand A..
- Chongqing green paint brand..
- Green paint of choice for t..
- Acting brand of choice for ..
- Fergus waterborne furniture..
- Buying paint factory paint ..
- Environmentally safe fashio..
- Ten paint brand | interior ..
- Ten brand paint inside and ..
- American David lacquer pain..
- American David paint green ..