Guangzhou Branch of K11 Universal waterproof coating
Guangzhou Branch of K11 Universal waterproof coating
General Products Division K11 waterproof slurry is through scientific research of proprietary technology, combined with polymer emulsions with inorganic powder prepared from polymer-modified composite waterproof slurry, it is a two component slurry powder is made from high quality cement, selected quartz sand and unique polymer composition, while the base as a whole consistent integration of composite waterproof material with double waterproof effect formation. 2 Technical Specifications (Executive Standard: GB19250-2003): Standard test items test results for individual judgment Solid content% ≥ 65 68 qualified drying time (h) dry time ≤ 4 3.2 Eligible drying time ≤ 8 5.6 qualified Tensile strength (Mpa ) ≥1.8 2.0 Qualified elongation at break (no treatment)% ≥80 88 Qualified impermeability (0.3Mpa, 30min) impervious meet the eligibility wet base surface adhesion strength / Mpa, ≥ 1.0 1.50 3 Scope 1 qualified, interior outside the concrete structure, brick walls, balconies, light brick structure; 2, walls floors, kitchen, basement, walls, toilet, planters, ground, garage; 3, water pools, swimming pools, ponds, sewage treatment pond ; 4 Features Benefits 1, prepared by using a unique formula made of polymer emulsions with various inorganic composite materials made of waterproof slurry; 2, to cover the fine crack, high compressive strength, strong bond; 3, the coating to dry after a tough semi-rigid film; 4, resist high hydrostatic pressure, the surface of the water has a negative effect; 5, damp base surface, the base surface can be rough construction; 6, coating can prevent moisture, salt contamination, to prevent moisture contamination of finishes salt; 7, abrasion, impact resistance, strong adhesion, after the slurry can be directly attached to dryness tile or leveling plaster. 8, environmentally friendly products, non-toxic, can be directly used for drinking water pool and pond construction technology base 5 surface treatment: base surface must be solid, clean, smooth, moist no oil, no floating dust; the base surface has pores, cracks, etc. defects previously patched with cement mortar leveling; Yin and Yang Xiu half rounded corners with a spatula. Ingredients: According to the mixing ratio of the additive into the container, then slowly pour the powder additives, and stir until no lumps, uniform glue-like, then you can use the stand for 5 minutes; in the course of Make sure to keep intermittent stirring to prevent stratification precipitation. Mixing ratio: liquid material (additive): powder = 1: 2.3 to 2.77 (weight ratio) node processing: the node positions splash wet base surface treatment, for yin and yang corner, wall pipe, floor drain port, construction joints and other polymers used cement-based waterproof coating and fiberglass cloth to enhance the process, a thickness of about 1.0mm. Construction: Using a stiff brush, roller or spraying machine mixed slurry evenly brushing or spraying on damp substrates; if for proof, just brushing a layer; a waterproof, need brushing two to three. When the first layer to dry to just tack (usually takes 1 to 2 hours), then brushing the second layer, brushing every two perpendicular directions should be. Coating protection: After the construction is completed the slurry, the coating must not completely pre dryness necessary protection, including the prohibition of pedestrians, rain erosion, exposure, injury and other sharp objects; completely dried after coating does not need to do anything special The protective layer. Conservation coating: Coating 24 hours after completion of the construction proposal covered with a wet cloth or spray coating the coating conservation watering, usually 2 to 3 days; air humidity, poorly ventilated place to dry time will be longer, whereas shorter air circulation particularly poor environment for the progress of the project can be mechanical ventilation method to accelerate the speed of dryness. Construction temperature: suitable for use in the environment of 5 ℃ ~ 35 ℃. Reference to the amount waterproof membrane thickness is 1mm, the theoretical amount of about 1.5 ~ 2.0kg / m2 (refers to the total amount of powder and liquid) the actual amount depending on the specific base surface and loss situation. Flat base surface Dosage: 1. For moisture, brushing a layer thickness of about 0.6mm, according to a flat base surface depending on the situation, about 1 kg / m2; 2. Used for waterproofing, brushing story, thickness 1.2mm, according to flat base surface depending on the situation, about 2 kg / m2. After the quality inspection and engineering waterproof layer construction is completed, should carefully examine each part of the whole project, especially the weak link, identify problems and timely repair, the coating should not have cracks, Alice, bubbling, delamination and so on. Once water testing shall be completely dried coating can be carried out, under normal circumstances require more than 48h, in a particularly humid airless environment may take longer. After the toilet and bathroom waterproof finish, water 24h no leakage in compliance. After the roofing done, you should check the drainage system is smooth, leaks (which can be sustained in the rain or after watering 2h conduct, conditional water roof water available 24h check). 6 Notes * Construction temperature should be 5 ℃ to 35 ℃; * within one hour paste exhausted after the opening tune; * first base surface wetting with water after the construction, but the base surface can not have water; * in cement before calendering base construction, you must first re-galling base; * When using, do not incorporation of water or other materials in the product; * liquid component storage temperature not lower than 0 ℃; * pre-construction, carefully Read Construction Description; please use the appropriate protective measures, such as gloves * When construction. Packaging and Storage and Transport Packaging: 34 kilos: (25kg + 9kg powder additive) / cover 20 kilos: (14kg + 6kg powder additive) / set 10kg: (7kg powder + 3kg additive) / set appearance : [liquid material: white] [Powder: gray] store in a cool dry place, unopened product, shelf life of 12 months. Transportation: The product according to non-dangerous goods transport product quality to ensure that this product meets the application specifications, reliable and stable quality and assume responsibility for defective products, the note is being prepared in accordance with the practice of many other research data, user-friendly, the company does not assume the actual construction environment can not meet the construction requirements, thus triggering the loss and liability. Before construction proposal read the instructions carefully and in accordance with the requirements of the construction, use of the process in case of doubt, please consult Guangzhou Building Materials Technology Co., Ltd. Accor. Home improvement waterproof selected family!
Contact Detail
Company Name: | Guangzhou Accor building materials |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Wu Xiao Lang() |
Telephone Number: | 020-29825398 |
Company Address: | Canton, Guangzhou, Guangdong, China |
Zip/Postal Code: |
Find More Related Products
- Buying chemical raw materia..
- Panyu FRP corrosion zinc co..
- EPC coating binders
- Ann powder coating powder f..
- Zhuzhou Hing Tai fire retar..
- Tai Hing fire retardant coa..
- Hangzhou fabric paint diato..
- Hangzhou Italian hand-scrap..
- Hangzhou fabric paint diato..
- Hangzhou Malay paint art pa..
- Hangzhou art paint
- Hangzhou Which most profess..
- Steel corrosion: cooling to..
- Chancheng refurbished steel..
- Supply of perlite cover age..
- New enhanced beads
- Supply Perlite insulation b..
- Buying chemical raw black
- Anhui stock acquisition of ..
- Acquisition of inventory pa..
- Jinhua, Yiwu large supply o..