Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Bathroom where water needs to be done to deal with?

Bathroom where water needs to be done to deal with?
Bathroom where water needs to be done to deal with?
Bathroom where water needs to be done to deal with?

Larger photo of automa dispenser

Company:Tianjin Building Materials Co., Ltd. Heng like bathroom
Information Name: Bathroom where water needs to be done to deal with?
Update Time:2015-04-29
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
1, and the bathroom facilities nearby wall wash basin, the water does not splash when the wall near the sink to use, if not to maintain the waterproof layer, simple walls moist, mildew attack. Therefore, before laying tile strong side, we must make wall waterproofing. Usually done on the ground wall 30 cm high water disposal, but right or wrong lightweight load-bearing wall, at least 1.8 meters to achieve the best waterproof disposal entire wall. And near the shower wall waterproofing orientation have to do 1.8 meters high, with a bath adjacent wall waterproofing coating also should be higher than the height of the bath along. 2, wall and floor, plumbing and earth leakage seams more episodes in across the floor of the tube root, floor drain, sanitary ware and other parts yin and yang angle, because the pipe root, floor drain and other parts loose, not adhesive prison, brushing waterproof layer does not close or partially damaged, the shower room manufacturer parts not formed by the lap length. These corners are the easiest leakage presents local, pay attention to the construction, waterproof coating thin parts of the detail node must be altered in place. Pipes, floor drain crossing the floor, the hole waterproof layer surrounding the need for careful construction. Plumbing a good summary of cement mulch, starting from the ground up brush 10-20 cm polyurethane waterproof coating, and then the floor redone polyurethane waterproof layer, plus the original waterproof layer, consisting of composite waterproof layer to enhance waterproof. 3, buried pipe wall pipes buried in the wall, should be greater than the diameter of the groove, the groove plastering slick, then brush polyurethane waterproof coating within the recess, waterproof disposal. 4, outfall and a drain on the ground it is necessary to drain the mouth slope to the drain flow no water. We should try to prevent changes to the original decorative drainage and sewers and drain orientation. 
Contact Detail
Company Name: Tianjin Building Materials Co., Ltd. Heng like bathroom
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Xu Jingli()
Telephone Number: 022-41562897
Company Address: Jinnan, , Tianjin, China
Zip/Postal Code:
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450