Supply industry paint shop air purification duplex curtain cabinet injection room
Supply industry paint shop air purification duplex curtain cabinet injection room
1, in the work place of the workpiece placed in front of the painting (1) spray plane. Start electronic control box mains, start the fan (8), to be the normal operation of the fan, he began painting work. 2, it will produce a certain amount of mist when painting, which mist if not treated will affect the work emergency. After purification cabinets installed spray, mist is exhaust (8) from (1) inhalation spray surface, drainage under the fan, mist through (4) water curtain, water curtain is blocked, control mist from sucked under the water curtain hole, under suction fan, water tank (2) of water will be pumped will eventually mist mixed with water flowing into the tank - settlement. Thus not fan out the air, causing secondary pollution, achieve a net gas emissions. 3 Notes: (1) when the tank within the water curtain and when there are more paint sludge, should be clean and maintain clean water and equipment to ensure purification effect to work properly. (2), the clean-up, the device is stopped, the (7) the drain valve open, emptying sewage, open (6) Clean and access door to clean the paint sludge tank clean and remove (5) tailgate, with scraper or other clean-up, to ensure the purification effect. (3), regular cleaning of equipment to ensure normal operation of equipment. Not once per week to clean up, paint a large amount of time to actually be. 4. Please review the warranty and outside repair: (1) when the electrical equipment is not working, should be suspended. Notify our service department, or professional and technical personnel to be amended. Wah Lai painting equipment works: work workpiece on a rotatable platform before the interior work settings, front Painter painting interior face of the workpiece, the former interior due to the pumping action of the fan form air from outside to inside, will paint mist formed by the spray booth exhaust after-treatment workshop, the workshop and painting work to ensure the work environment is not contaminated mist. At the same time, mist through the spray chamber is discharged after treatment. Curtain spray booth for the front wet processing equipment, equipment for the water curtain plate, water curtain panels above the overflow tank, water curtain behind the curtain board for the multi-stage filter. When the painting into the mist spray booth with water curtain first encounter, was washed into the tank. When the rest of mist through the multi-stage filter curtain was blocked completely in the water. The water tank by the water pump to lift water curtain and curtain multi-stage filter overflow tank top, overflow to form a water curtain water curtain plate. Cheung Fat painting Structure: curtain spray chamber: the chamber body, sink, water curtain, water system, ventilation filtration system, etc., the normal completion of the workpiece while spraying paint can effectively prevent the waste discharge and pollution of the environment. Curtain spray booth apply: unilateral spray can also be sprayed on both sides after more than one portfolio. Model types: single-sided single-station, duplex, three-station, multi-station, for spray-sided curtain cabinet. Style: single curtain board, three water curtain. Material: cold rolled steel, galvanized sheet, section steel, stainless steel structure. Cheung hair spray washing machine series features: 1, the water wash paint dust Lian curtain to prevent the risk of fire caused by paint; 2, water pump loop filter, saving water; 3, high winds high efficiency axial-flow exhaust equipment, quickly exhaust emissions, eliminate dust coating paint harm to human body; 4, water curtain plate made of stainless steel, anti-acid, corrosion-resistant, durable; 5, easy maintenance simple. Cheung Fat conventional spray equipment models technical parameters Type Dimensions (L * W * H) (mm) water showering curtain width (mm) Voltage (V) Fan power lamp pump power turbine wind XF-900 1200 * 1500 * 1970 900 380 1.5kw 20W 0.75kw 11000m3 / h XF-1200 1500 * 1500 * 1970 1200 380 1.5kw 30W 0.75kw 11000m3 / h XF-1500 1800 * 1500 * 1970 1500 380 2.2kw 40W 0.75kw 18700m3 / h XF-2000 2300 * 1500 * 1970 2000 380 2.2kw 20W * 2 0.75kw 18700m3 / h XF-2400 2700 * 1500 * 1970 2400 380 1.5kw * 2 sets of 30W * 2 1.5kw 11000m3 / h × 2 XF-3000 3300 * 1500 * 1970 3000 380 2.2kw * 2 sets 2.2kw 18700m3 / h × 2 XF-4000 4600 * 1500 * 1970 4000 380 2.2kw * 3 sets 1.5kw * 2 sets 18700m3 / h × 3 1, water showering curtain plate with 1.0mm304 # stainless steel plate manufacturing, water tanks and machine side plate with 2.0mm steel manufacturing; spray rust inside and outside spray paint. 2, comes with electric control box assembly to protect a one, handling precautions 1, before turning the water into the tank until water flows out of the overflow opening up. 2, in the fuel injection, avoid upward direction or both sides of the gun is no curtain of water sprayed. 3, each day, the fish in the diesel tank to ensure recycled water clean, and clean the filter of each channel. 4, before turning to the next must check whether the water tank overflow rim, each filter is clogged, is back in place, so the pump will be evacuated or blockage, or even burn. 5, a month to maintain a comprehensive clean-up, cleaning fan blades, nozzles cabinet with the grid plate and the overflow tank, the tank bottom and various filters, studio each of the plates, etc., and a search of fans, pumps the action is There are exceptions, and put into a tank of water circulating pump, cleaning pipes, nozzles, and then replace the fresh water into the tank. Second, maintenance 1, depending on the fuel injection quantity and extent of contaminated water tank cycle may be, under normal circumstances, circulating water tank must be replaced every day once. 2, the day the two filters must be cleaned once a subsidiary tank, otherwise a clogged filter, pump will be damaged due to the evacuation. 3, is strictly prohibited to take away the filter tank through a subsidiary not, otherwise the oil once the suction pump, not only will damage the pump and pump seals, and easy to make the nozzle and pipe blockage. 4, the fan blades must be cleaned regularly, otherwise a blockage fan, not only affect the amount of ventilation, and easy to make the fan motor overload and burn. 5, must be checked every 1-2 months blower bearings and drive belts of 1 times. 6, must always pay attention to the temperature rise of the water pump and fan motors, vibration, the repair of electrical appliances must be held by a qualified electrician, prohibited live working. Third, the incident handling accident phenomena cause of the accident approach fever or burn a pump motor, circulating water dirty, oil flow into the pump stuck Water Pumps leaves; 2 sub tank filter clogging, pump evacuation; 3, the voltage is too low or too high, or the power phase. 1, the replacement cycle of water. 2, clean the filter. 3. Add the power regulator, plus the lack of protection. Pump seal ring damage deposit leakage 1, the oil flowing into the pump, damaged seals. 2, evacuated heat pumps, seals burned. 1. After changing the water, replace the seals. 2, clean the filter, replace the seals. Discharge air with oil increased by 1, nozzle clogging; 2, fan blades product oil severe; 1, after changing the circulating water, wash nozzle. 2, cleaning the fan blades. 1 fan motor burned out, no time to clean dirty blades, motor overload. 2, fans beer whisper damage. 3, the motor power phase. 1, cleaning blades, motor repair. 2, the replacement of beer whisper, repair motor. 3, check phase reasons. ; Plus phase protection. Fan sound is incremented by one bracket screw loose. 2, Blade accumulate too much oil. 3, beer whisper damage. 4, the fan shaft machine Musson off. 1, tighten the screws. 2, cleaning blades 3, to replace the beer whisper. 4. Tighten Jimi. Cheung Fat company's performance: service meticulous, Cheung Fat began the limited technology, service unlimited business philosophy as a responsibility no obligation beside goods. Companies introduced high-quality products, but also provide exhaustive advisory services, installation guidance services, related product support services, be sure to make all of your problems are completely resolved. Warranty and maintenance services we are as good as gold, integrity long! ■ products for one year warranty and lifetime maintenance ■ provide free technical design ■ responsible for personnel training, technical advice whether you at what time, what place, Wah Lai product warranty regardless of holidays;... Regardless of seasons, Teenage rain and snow, will provide you with 24-hour rapid response service.
Contact Detail
Company Name: | Dongguan City Cheung Fat ventilation purification equip.. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Miss Chang(Sales) |
Telephone Number: | 0769-22982151 |
Company Address: | 19 South City Zhou Bo Creek Central Square Swallow Street, Dongguan City, Guangdong, China |
Zip/Postal Code: | 523077 |
Find More Related Products
- Pulse dust collector
- Shandong cyclone | Shanxi c..
- Dongguan feng shui master |..
- French Prime Soma official ..
- Shandong factory outlets ca..
- Design Woodworking workshop..
- Stickman animation, video m..
- Taiwan's Feng Shui Master |..
- Korea authentic fried chick..
- Tornado bag dust collector
- Food screening screw convey..
- Wet desulfurization precipi..
- Chang'an Town ventilation p..
- Fluoride plastic high tempe..
- Weifang Voice Group Call Me..
- Ceramic workshop equipment ..
- Manufacturers have long she..
- Factory outlets Oval dust f..
- Conventional 320 × 900 dust..
- Jilin Power efficient dust ..
- Cyclone Dust boiler design