Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Supply CGM clay track, factory outlets, Jiangsu wholesale suppliers

Supply CGM clay track, factory outlets, Jiangsu wholesale suppliers
Supply CGM clay track, factory outlets, Jiangsu wholesale suppliers
Supply CGM clay track, factory outlets, Jiangsu wholesale suppliers

Larger photo of automa dispenser

Company:Beijing Warburg Vision Construction Co.
Information Name: Supply CGM clay track, factory outlets, Jiangsu wholesale suppliers
Update Time:2015-04-29
Validity:30
Specifications:50kg / bag
Quantity:100000.00
Price Description: RMB/
Inquire Now
CGM clay track CGM clay track is selected containing natural aggregate, having excellent fluidity, high compressive strength, longer working hours, economy, dense, no shrinkage, no rust, no metal aggregates, construction convenient, continued to improve, filling good adhesion properties and toughness of a dedicated track clay, application port, wharf crane rail groove. (For rail clips grout, floor bolts, etc.) of various machinery and equipment installation, steel structure support base, bolt hole grouting. Second, product performance fluidity (mm) 24h vertical expansion ratio (%) Compressive Strength (Mpa) once grout thickness (mm) reference standard amount of water ≥300 ≥0.020 R1≥20 R3≥40 R28≥60 ≤200 12 % ~ 13% 2200Kg / ml or more data measured under standard laboratory conditions; l Applications Product details refer to the Technical Support "cement-based grouting material technical specifications"; Third, the construction method, construction preparation: (1 ) Clean the foundation surface of the track, 24 hours prior to grouting, the surface should be fully wet track basis. 1 hour prior to grouting, the water should be dry. (2) The support provided by grouting construction drawing template, not leak slurry. (3) filling in as running plasma phenomena occur, promptly. 2, track clay grouting material, the process should meet the following requirements: (1) a second track clay grout, grout should be on one side, until the other side to overflow, may not be grouted simultaneously from four sides. (2) filling begin, you must be continuous without interruption, and filling time as short as possible. (3) Do not vibrated during the grouting process, available bamboo strip is pulled diversion if necessary. (4) Each filling thickness of not more than 150mm, when the grout layer less than 30mm shall take appropriate measures or to switch to other types of ancillary material. (5) Do not operate the machine vibration is transmitted to prepare equipment foundation grouting. 3, the time required for early CGM clay track solidified grout is about 3 to 4 hours. 4, 3 to 4 hours after debating whether visually and feel the initial setting, after initial solidification determined by batch knife light smooth surface, and then linen or cotton cover on the surface. 5, a day depending on the temperature below 15 ℃, every day, morning and evening with water conservation; 15 ℃ -35 ℃ once a day early in the evening with water conservation. 6, the solidification of the track were wet clay conservation of not less than seven days. Fourth, Storage storage conditions: sealed, dry, moisture, sun storage period: 6 months Packing: 50kg / Bag 
Contact Detail
Company Name: Beijing Warburg Vision Construction Co.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Zhang Qiang()
Telephone Number: 05375693939
Company Address: Zoucheng Kanzhuang Wuli, Jining City, Shandong Province, China
Zip/Postal Code:
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450