Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Guangdong build drainage board Welcome

Guangdong build drainage board Welcome
Guangdong build drainage board Welcome
Guangdong build drainage board Welcome

Larger photo of automa dispenser

Company:Tai'an City, build drainage board, Ltd.
Information Name: Guangdong build drainage board Welcome
Update Time:2015-04-21
Validity:999999
Specifications:500 * 500
Quantity:100000.00
Price Description: RMB/
Inquire Now
Guangdong build drainage board Welcome sales hotline: 18263807657, QQ: 1968643350 Products 182,638.076.57 drainage board is made of polystyrene (HIPS), or is made of polyethylene plastic plate after punching cone penetration units (or hollow cylinder shaped porous) from the top surface of plastic cone projections access layer of filter geotextile to prevent soil particles through, thus avoiding drainage obstruction, so that smooth drainage. The traditional use of brick tile drainage as a guide filter layer, the use of more pebbles or gravel as a filtration layer, the water discharged to the designated place. Now replace the pebbles treatment layer with a drain to drain is saving time, effort and energy saving investment, but also reduce the load of the building. Features: 182,638.076.57 good drainage system for normal use and life cycle of construction and civil engineering structures play an important role. HW type Drainage Board porous tubes with an effective drainage system sparse, long and short cylindrical drain and geotextile form a drainage system, to form a water seepage, water and drainage systems. Usage: 182,638.076.57 garden project: garage roof greening, roof garden, soccer fields, golf courses, beach projects Municipal engineering: road embankment, subway tunnels Construction: building the basis of the upper or lower, basement and outside walls , roofing and insulation and other impervious Traffic Engineering: roads, railway embankment, dams and slope protection layer laying procedure: 1. Clean the laying site 182,638.076.57 garbage, cement screed, so that there is no obvious bump at the scene, Outdoor garage roof and roof garden need to find the slope of 2-5 ‰. 2. Green roofs and outdoor garage roof greening can be equipped with a porous pipe use, so can drain water discharged discharged concentrated near water pipes under or near the city sewer 182,638.076.57 3. ground water seepage in the basement On the basis of the above overhead floor, which is done in front of the floor drain is to do one round projections downward, left around the blind ditch, up the mountain groundwater seepage flow into the surrounding natural blind through the drainage board space ditch, then into the sump through blind ditch. The interior basement seepage water, the body can be laid on the building wall drainage board, round projections for the main walls, drainage board outside and then a layer of single-wall masonry or cement powder steel mesh to protect the drainage board, so space outside wall seepage board straight down the inflow blind ditch directly caused sump. 5. In any lot laying drainage board, must be careful not to let dirt, cement, sand and other trash into the front space of the drainage board to ensure the smooth flow of the drainage board space. 182,638.076.57 6. When laying drainage board as well protection measures, dimensions, or outdoor garage laying drainage board should backfill work in a timely manner as soon as possible, to prevent large wind in laying drainage board affect quality; and in the basement Wall waterproof protective layer to do as soon as possible to prevent damage to persons or things to be drainage board. 7. 182,638.076.57 cohesive backfill is in need shop geotextile 3-5 cm above the sand is ideal, in favor of geotextile filtration; as backfill is a nutritive soil or light Soil quality is no longer laying a layer of sand, the soil itself is very loose very easy treatment. 8. Drain in laying the right side and take the next 1-2 edge fulcrum, you can touch the bottom two together, the above use of geotextile overlap, as long as they do not enter the soil drainage board drainage channel can maintain drainage flow . Construction Notes 182,638.076.57 1, in the dry, ventilated storage environment drainage board, to prevent exposure, away from fire. 2, please stand up or lie flat drainage protection board, not tilted or cross horizontal pressure, stacking height not more than three layers, avoid heavy heap pressure. 3, laying should be smooth natural downslope or according to the laying of water. 182,638.076.57 4, when a single shop geotextile lap guarantee 150cm, lap by glue or sand compaction avoid moving, and then backfill, the first layer of compacted backfill guarantee before the next step, layered backfill must be compacted. 182,638.076.57 Contact: Mr. Wang Mobile: 18263807657 Wong QQ: 1968643350 
Contact Detail
Company Name: Tai'an City, build drainage board, Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Xu Xia(General manager)
Telephone Number: 155-50833165
Company Address: Zong Street Tai'an City No. 255, Taian City, Shandong Province, China
Zip/Postal Code:
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450