Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Nitrogen tankage | default group nitrogen tank | Huizhou Hongrun

Nitrogen tankage | default group nitrogen tank | Huizhou Hongrun
Nitrogen tankage | default group nitrogen tank | Huizhou Hongrun
Nitrogen tankage | default group nitrogen tank | Huizhou Hongrun

Larger photo of automa dispenser

Company:Huizhou City Hongrun Petrochemical Equipment Co., Ltd.
Information Name: Nitrogen tankage | default group nitrogen tank | Huizhou Hongrun
Update Time:2015-04-21
Validity:0
Specifications:Limited
Quantity:
Price Description: RMB/
Inquire Now
 1. Security and unloading operatives arrived at the scene 15 minutes ahead of schedule, the security guard ready to do! Martial law area and unloading point 60 meters! Each channel mouth guard let someone nitrogen tanks, and prohibit all vehicles, personnel movement, banning all fire operations. First, the data record level operatives tank level indicator instrument! Do all the preparatory work before discharge, such as tank pressure relief, nitrogen preparation, cotton yarn preparation, and preparation of copper wrench! 2. After receiving the notice of readiness Huiyang operatives unloading nitrogen tanks, the security guard to pass information to the front door, the front door to enter the park through the security notice tanker unloading points. 3. filling work and professional and technical personnel responsible for unified command, by a trained service personnel and carry out large-scale co-operatives wear nitrogen tanks, all staff access to the site of the tanker drivers and site personnel outside of martial law should be absolutely obey the command of professional and technical personnel. 4. Security Command tanker into the unloading platform, stop, turn off! 5. equipped with 35KG dry powder fire extinguisher 6 and enough towels. Do spill contingency measures: protective sand, cotton and other materials ready. (11) each spring should be a comprehensive examination 防雷防静电 nitrogen tank equipment grounding, grounding resistance testing should meet the requirements. (12) between applications pontoon floating roof tank and the tank wall two cross-sectional area of ??not less than 25mm2 soft copper wire connection. (13) mounted fuel tanks should be run in a safe place inside the tank. (14) When the condensate oil level is higher than the heating coil, should be heated with steam risers, until condensate oil dissolves, then steam heating coils. (15) should not wear synthetic clothing and shoes with nails tank. In the top of the tank should not be open, non-explosion-proof flashlight off. (16) oil pipeline in the region flare tanks, clean the tank should do the job industry regulations. (17) tanks on fire, you should immediately cease all operations reporting and tank fire. Organized and timely start emergency fire nitrogen tank capacity | default group nitrogen tank | Huizhou Huizhou City Hongrun Hongrun by Petrochemical Equipment Limited. Huizhou City Hongrun Petrochemical Equipment Co., Ltd. (www.hongrunshsb.com) strong, credible, in Huizhou, Guangdong chemical equipment industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving Huizhou Hongrun innovative ideas will lead into the brilliant and you work for a better future! 
Contact Detail
Company Name: Huizhou City Hongrun Petrochemical Equipment Co., Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Lee()
Telephone Number: 0752-2818236
Company Address: Huiyang District, Huizhou City, Pingtan town alone Ishimura, Huizhou City, Guangdong, China
Zip/Postal Code: 4200018
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450