Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Integrated wastewater treatment equipment | Zhucheng Colin Green | Inner sewage treatment equipment

Integrated wastewater treatment equipment | Zhucheng Colin Green | Inner sewage treatment equipment
Integrated wastewater treatment equipment | Zhucheng Colin Green | Inner sewage treatment equipment
Integrated wastewater treatment equipment | Zhucheng Colin Green | Inner sewage treatment equipment

Larger photo of automa dispenser

Company:Environmental Science and Technology Co., Ltd. Zhucheng..
Information Name: Integrated wastewater treatment equipment | Zhucheng Colin Green | Inner sewage treatment equipment
Update Time:2015-04-14
Validity:0
Specifications:Limited
Quantity:
Price Description: RMB/
Inquire Now
 Construction of sewage treatment facilities 1. Composition contact oxidation pond: After the primary settling tank for artesian water to contact the biological treatment of industrial waste water treatment equipment, contact the pool is divided into three hospital sewage treatment equipment, the total residence time of 1 hour or more. Hardened equipment contact oxidation time up to 6 hours, packing filler for novel trapezoid. 2. The secondary settling tank: After biochemical sewage flow secondary sedimentation tank, secondary sedimentation tank for two only vertical flow sedimentation tank, they run in parallel. Upflow velocity O.3-0.4 mm / sec. Mud using air lift to the sludge pond. Sewage treatment equipment in aerobic sludge digestion tank: sedimentation tank emissions in the pool aerobic sludge digestion stabilization process buried sewage treatment equipment to reduce the volume of sludge and improve the stability of the sludge. Aerobic sludge digestion of less available time to clean up sludge suction truck out into the bottom of the pool from the inspection hole sludge pool suction Sinotrans to post. Aerobic sludge digestion supernatant portion provided Ikegami reflux device, the supernatant to overflow pool acid hydrolysis. Integrated sewage treatment equipment Main features: 1, industrial wastewater treatment facilities using membrane bioreactor technology is a new process technology with biological treatment combining the membrane separation technology, replacing the traditional process of the secondary settling tank. 2, the water from the sewage and cooling water. Scope suitable residential quarters, office buildings, shopping malls, hotels, restaurants, offices, schools, military units, factories, and other sewage and similar industrial organic wastewater, such as textiles, beer, paper, leather, food, chemical industries organic wastewater treatment. Integrated wastewater treatment equipment | Zhucheng Colin Green | Inner sewage treatment equipment provided by Colin Environmental Protection Technology Co., Ltd., Zhucheng. Zhucheng Colin Environmental Technology Co. (www.kelinhuanbao.net) is an industry leader in Shandong Weifang, sewage treatment equipment, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Colin Green Leadership in Zhucheng staff warmly welcome all inquiries negotiations to create a better environment Zhucheng Colin future. 
Contact Detail
Company Name: Environmental Science and Technology Co., Ltd. Zhucheng..
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Wang()
Telephone Number: 0536-6555525
Company Address: Street Industrial Park, Zhucheng, Weifang City, Shandong Province, China
Zip/Postal Code: 262200
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450