Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Taizhou Taizhou estate epoxy floor paint _ underground parking / Po Mega underground garage / epoxy floor paint construction

Taizhou Taizhou estate epoxy floor paint _ underground parking / Po Mega underground garage / epoxy floor paint construction
Taizhou Taizhou estate epoxy floor paint _ underground parking / Po Mega underground garage / epoxy floor paint construction
Taizhou Taizhou estate epoxy floor paint _ underground parking / Po Mega underground garage / epoxy floor paint construction

Larger photo of automa dispenser

Company:Suzhou Po Mega Floor Engineering Co., Ltd.
Information Name: Taizhou Taizhou estate epoxy floor paint _ underground parking / Po Mega underground garage / epoxy floor paint construction
Update Time:2015-01-12
Validity:30
Specifications:
Quantity:100000.00
Price Description: RMB/
Inquire Now
Epoxy floor paint the construction process: Floor Thickness: 1.0mm 2.0mm 3.0mm surface morphology: light type slip-type life span: 1.0mm: 8 years 2.0mm: 10 years 3.0mm: 15 years Floor features: flat seamless, wear pressure, acid and alkali resistance, chemical resistance, color variety, easy to clean, durable, strong impact. Scope: ①GMP pharmaceutical plants, hospitals, clean rooms; ② electronics factory, instrument control room, food processing plants, refrigerator, freezer; construction technology: ① water treatment: the first floor of the ground need to have good water treatment; ② prime handle : according to the situation well polished elements, repair, removal; ③ epoxy primer: The exceptionally strong permeability and adhesion roll an epoxy primer to enhance the surface adhesion; ④ epoxy coating: epoxy resin is added the right amount of quartz sand, with a trowel to evenly coated with the number of road; ⑤ Epoxy approved soil: according to the actual needs of the number of road construction, required to achieve smooth and no holes, no batch of knives and sanding India Indian subject; ⑥ self-leveling finish : with self-leveling epoxy topcoat evenly trowel together to reach the ground after the completion of the overall bright and clean, color uniform, no hollowing; ⑦ Construction complete: 24 hours before the Master, 72 hours before stress. (25 ℃ prevail, low temperature required to appropriately extended opening hours). Dongguan Dow Industrial Flooring Co., your best choice. Epoxy construction process elements to deal with: the old floor for professional mechanical polishing process to eradicate from the sand part polished, cleaned of dust, and then using mechanical treatment of cement grinding ground surface, so that the ground level, no loss, no powder, etc. . Polished end processing after construction, according to the situation on the ground to test for moisture content, can be wet floor measuring instrument or based on experience professionals will complete a 2m * 2m film flat on the ground, the film is set at the bottom of the drying of paper, four weeks seal. After 72 hours, remove the dried paper, if the construction can be ignited; not ignite or intermittently will not be allowed construction. For the high moisture content of the ground generally adopt the high-pressure spray guns grilled ground or ground water epoxy primer treatment. Thin the first available diluent oil cleaning, oil layer thickness is using self-leveling cement floor plan rendering processing. Epoxy primer penetration Construction: B epoxy resin primer penetration after mixing two parts, with a professional hand-held mixer, stir, roll or Scraping cleaned on the ground, wait until after the full penetration, such as find local whitish coating or no light leakage, as the case may be partial roll once again, in order to ensure the sealing effect primed; epoxy coating Construction: epoxy floor paint in accordance with the ratio requirements, first in Master Tu agent to hardener mix, stir after adding the right amount of quartz sand, stir and pour it on the ground, in order to make a comprehensive layer Pifu trowel, filling local damage at the surface smooth. Join coated quartz sand in the mortar must first end the overall construction, the construction process, with a trowel and sharp teeth to remove large bubble pick to impurities particulate matter, ground hardening intervals until 48 hours after the full sanding dry, then vacuum the floor clean of dust then a quartz powder coating mortar construction. Epoxy finish brushing construction: epoxy floor paint according to the ratio of the requirements, the first main agent stir, and then fitted with primary sclerosing agent to agent into the central barrel, avoid mixing the material is uneven. After stir evenly, after an interval of 15 minutes, allowed to fully react, curing, and then roll the whole floor dedicated coating construction. Construction sand impurities found immediately removed if presented during the mixing bucket paint hardened state, you must stop using and always replace the mixing bucket. Note that during the construction process roll prints. Paint protection (optional on varnish): finish construction carried out after varnish roller, after waiting for 48 hours, you can wear soft-soled shoes to enter, not water a week, oils, acids and other chemicals applied to the base sticky. Phone: 18012733925 QQ: 515920218 E-mail: 515920218@QQ.com Website: http: //www.bmjdp.com Address: Wujiang District, Suzhou City, Jiangsu Province, with the town Matilda district No. 963 
Contact Detail
Company Name: Suzhou Po Mega Floor Engineering Co., Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Cai Chuang(Manager)
Telephone Number: 0512-63053031
Company Address: No. 963 Wujiang Tongli Town district Matilda, Suzhou , Jiangsu Province, China
Zip/Postal Code: 215200
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450