Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Supply Steel Plate Henan anchorage rubber plastic Henan Henan Henan sealed plastic potting compound

Supply Steel Plate Henan anchorage rubber plastic Henan Henan Henan sealed plastic potting compound
Supply Steel Plate Henan anchorage rubber plastic Henan Henan Henan sealed plastic potting compound
Supply Steel Plate Henan anchorage rubber plastic Henan Henan Henan sealed plastic potting compound

Larger photo of automa dispenser

Company:Shanghai Industrial Development Co., Ltd. Jian Lee
Information Name: Supply Steel Plate Henan anchorage rubber plastic Henan Henan Henan sealed plastic potting compound
Update Time:2010-09-07
Validity:30
Specifications:
Quantity:0.00
Price Description: RMB/
Inquire Now
1. Introduction 
 JL-31 high-strength two-component construction adhesive anchorage strength of composite resin adhesive, with a strong anchor, curing speed, simple construction, materials, and low cost. 
 2. Product Features 
 ? Curing speed, reconciliation of rapid curing at room temperature 
 ? Load faster on the building structure, and strong anchoring 
 ? Heat resistance, room temperature, no creep 
 ? Anti-aging, anti-media (acids, alkalis, water) performance 
 ? Anti-welding and flame resistance 
 ? Tightness, moisture resistance, resistance to shock 
 ? Process performance can be -10 ℃ ~ +40 ℃ environment construction 
 3. Application 
 ? A variety of building structure steel, screw implants 
 ? Building structure reinforcement, reinforcement 
 ? Building structural frame, shear wall anchorage 
 ? A variety of devices based on a fixed 
 ? Railways, highways, bridges, water reinforcement Extension 
 ? Billboards, pipe tunnels, elevated roads and rails fixed noise 
 4. Curing time 
 JL-31-type curing time 
 Initial setting time of installation time based temperature curing time 
 -5 ℃ -0 ℃ 30min 20min 5h 
 0 ℃ -10 ℃ 20min 15min 3h 
 10 ℃ -20 ℃ 16min 10min 2h 
 ≥ 20 ℃ 12min 5min 1h 
 5. With the proportion of plastic 
 With plastic glue and curing agent ratio: 20:1 
 6. Package 
 ? In plastic drum, plastic, and curing agent united in a barrel packaging 
 ? Min 15kg / group, and 5kg / Packing Group Two 
 7. Technical parameters 
 Key Performance Indicators 
 Compressive strength flexural strength performance capacity of vibration fatigue shear strength of adhesive strength 
 Index 1.9-2.2 (g/cm3) ≥ 60Mpa ≥ 20Mpa ≥ 36Mpa> 800 million plastic / concrete C20 ≥ 7Mpa 
 Rubber / clay ≥ 3Mpa 
 Plastic / general bar ≥ 11Mpa 
 Plastic / steel ≥ 16Mpa 
 Install and load the data 
 Level of reinforcement bar diameter (mm) hole diameter (mm) Anchorage depth (mm) design tensile strength (KN) standards for tensile strength (KN) 
 Ⅰ 6 10 ≥ 80 5.9 6.6 
 Ⅰ 8 12 ≥ 120 10.5 11.8 
 Ⅰ 10 14 ≥ 150 16.5 18.5 
 Ⅰ 12 16 ≥ 180 23.7 26.5 
 Ⅱ 10 14 ≥ 140 23.5 26.5 
 Ⅱ 12 16 ≥ 160 33.9 37.9 
 Ⅱ 14 18 ≥ 190 46.2 51.5 
 Ⅱ 16 20 ≥ 220 60.3 67.3 
 Ⅱ 18 22 ≥ 270 76.3 85.2 
 Ⅱ 20 25 ≥ 300 94.2 105.2 
 Ⅱ 22 28 ≥ 330 113.9 127.3 
 Ⅱ 25 32 ≥ 380 147.2 164.4 
 Ⅱ 28 35 ≥ 480 184.6 206.1 
 Ⅱ 30 38 ≥ 590 211.9 236.7 
 Ⅱ 32 40 ≥ 650 241.1 269.0 
 Description:? I Grade Reinforced: fy = 210N/MM2 (design strength), fyk = 235N/MM2 (standard strength) 
 ? II steel bar: fy = 310N/MM2 (design strength), fyk = 335N/MM2 (standard strength) 
 ? Concrete strength C30, fuk, cubc, 150 = 30N/MM2, construction temperature: -5 ℃ - 40 ℃ 
 ? Characteristic value of the safety factor does not take into account the relevant technical details please feel free to contact the Department of Engineering Technology: 
 8. Operating Process 
 Planting bars, screw construction points: 
 ? Drilling: drilling based on technical parameters 
 ? Chiang Khong: a pump or compressed air and brush to clean drilling, clean and up to date 
 ? Ingredients: Remove A, B component adhesive, uniform mixing with professional tools 
 ? Note plastic: plastic with a good will gradually outward from the bottom of the hole into the hole 
 ? Anchor: steel or screw to screw into the hole slowly 
 ? Cure: Based on the substrate temperature, waiting for enough time to gel curing, to be fully cured gel load after install 
 9. Note 
 ? To mix, thoroughly clean the hole, not touch the rod before cure is strictly prohibited 
 ? Construction are required to wear gloves, masks, goggles, helmets and other protective equipment 
 ? If you accidentally get on skin or clothing, used acetone to clean and rinse with plenty of water, food or if accidentally splashed into the eyes, immediately seek medical treatment 
 10. Transport, storage 
 ? This product is a non-dangerous goods, transport of chemical building materials by the general 
 ? No exposure in transit, rain, upside down or damaged packaging 
 ? This product should be stored in a dark cool (5-25 ° C), dry warehouse, storage for 6 months 
 Sales Tel:
Contact Detail
Company Name: Shanghai Industrial Development Co., Ltd. Jian Lee
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Chen Dongliang(Manager)
Telephone Number: 13918759739
Company Address: Qingpu District, Shanghai, Shanghai, Shanghai, China
Zip/Postal Code: 201700
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450