Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Zhanjiang drainage board Welcome

Zhanjiang drainage board Welcome
Zhanjiang drainage board Welcome
Zhanjiang drainage board Welcome

Larger photo of automa dispenser

Company:Tai'an City Jia Plastic Building Material Co., Ltd. Geo
Information Name: Zhanjiang drainage board Welcome
Update Time:2015-06-09
Validity:999999
Specifications:Complete
Quantity:999999.00
Price Description: RMB/
Inquire Now
Zhanjiang drainage board to welcome you all day 15,588,570,788 Sales Hotline: 155-8857-0788 Mr. Sun look forward to working with you! Provide test reports ISO9000 certification, please rest assured that order drainage board manufacturers I produced indicators have been through the national quality inspection, component detects welcome customers to order products introduced 155 + 8857 + 0788 drainage board is made of polystyrene (HIPS) or is made of polyethylene plastic plate after punching cone penetration units (or hollow cylindrical porous) from the top surface of the plastic cone penetration units access layer of filter geotextile to prevent soil particles through, thus avoiding the drainage channels obstruction, so that smooth drainage channels. The traditional use of brick tile drainage as a guide filter layer, the use of more pebbles or gravel as a filtration bed, the water discharged to the designated place. Now replace the pebbles treatment layer with a drain to drain the save time, effort and energy saving investment, but also reduce the load of the building. Features: 155 * 8857 * 0788 good drainage system for normal use and life cycle of civil construction and structures play an important role. HW type Drainage Board porous tubes dewater an effective drainage system, long and short cylindrical drainage plate and geotextiles to form a drainage system, to form a water seepage, water and drainage systems. Usage: 155 * 8857 * 0788 Garden Project: garage roof greening, roof garden, soccer fields, golf courses, beach projects Municipal engineering: road embankment, subway tunnels Construction: building the basis of the upper or lower, basement and outside walls, roof and insulation layer impermeable and other transportation projects: roads, railway embankment, dams and slope protection layer laying procedures: 155 * 8857 * 0788 1. Clean the laying site of rubbish, cement leveling, so there is no obvious bump at the scene, outdoor garage roof and roof Gardens need to find the slope of 2-5 ‰. 2. green roofs and outdoor garage roof greening can be equipped with porous tube use, so can drain water discharged concentrate discharged under water near the city sewer or near 155 * 8857 * 0788 3. Basement floor seepage water, Overhead floor basis of the above, that is, before doing the floor is to do one drain, circular projections downwards, left around the blind ditch, groundwater up the mountain, the natural inflow of water seepage through the space around the blind ditch drainage board, then through the blind ditch into the sump. The interior basement seepage water, the body can be laid on the building wall drainage board, round projections for the main walls, drainage board outside and then assemble one single pink cement wall or steel mesh to protect the drainage board, so Space outside wall seepage board straight down the inflow blind ditch directly caused sump. 5. In any lot laying drainage board, must be careful not to let dirt, cement, sand and other rubbish into positive space drainage board, drainage board to ensure the smooth flow of space. 155-8857-0788 6. When laying drainage board as good protection measures, dimensions, or outdoor garage laying drainage board should backfill work in a timely manner as soon as possible, to prevent the impact of large wind tangled drain laying quality; waterproofing basements and interior to do as soon as the protective layer to prevent drainage board is damaged or things. 155,885.707.88 7. clayey backfill is in need shop geotextile 3-5 cm above the sand is ideal, in favor of geotextile filtration; as backfill is a nutritive soil or light soil quality no longer laying a layer of sand on this earth itself is very loose very easy drainage. 8. Drain in laying the right side and take the next 1-2 fulcrum side, you can touch the bottom two together, the above use of geotextile overlap, as long as they do not enter the soil drainage board drainage channel can maintain drainage flow . Construction Notes 155-8857-07881, in the dry, ventilated storage environment drainage board, to prevent exposure, away from fire. 2, please stand up or lie flat drainage protection board, not tilted or cross horizontal pressure, Do not stack more than three layers, avoid heavy heap pressure. 3, laying should be smooth nature, according to the water or to lay down slope. 155 + 8857 + 07884, single lap lay geotextile guarantee 150cm, lap joints with plastic or compacted sand to avoid moving, and then backfill, the first layer of compacted backfill guarantee only after the next, stratified backfill must be compacted. 155 + 8857 + 0788 Contact: Mr. Sun Mobile: 15588570788 0538-6301561 QQ: 652393567 http://www.jiasujiancai.com 
Contact Detail
Company Name: Tai'an City Jia Plastic Building Material Co., Ltd. Geo
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Mr. Sun(Sales Manager)
Telephone Number: 0538-6301561
Company Address: High-tech Development Zone, Taian City, Shandong Province, China
Zip/Postal Code: 271000
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450