Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

How to install carbon fiber far infrared electric floor heating?

How to install carbon fiber far infrared electric floor heating?
How to install carbon fiber far infrared electric floor heating?
How to install carbon fiber far infrared electric floor heating?

Larger photo of automa dispenser

Company:Ji Ning Yiqun energy-saving heating equipment Co., Ltd.
Information Name: How to install carbon fiber far infrared electric floor heating?
Update Time:2015-04-30
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
Sun Yiqun carbon fiber heating cable heating system installation instructions 1. Construction conditions: 1) design drawings and technical solutions available. 2) construction site and construction of water, electricity and other temporary facilities to meet the construction needs: clean site should be smooth, with debris should be cleaned up before construction. Keeping the floor dry, no uneven place with pipes or conduits in advance on the ground grooving buried, or the water or along the wall line pipe emissions. 3) Ground grassroots waterproof layer or moisture barrier is required construction is completed. 4) Determine the heating cable power lines and ground heating thermostat probe line position. In time for installation and installation site should be used for temporary electrical power after acceptance. 5) lay hidden within the region other professional engineering has been completed, closed independent construction site in line with the conditions of the individual projects and other individual projects should not cross construction. 2. The heating system construction procedure: 1) Check the laying of the area found to comply with the construction conditions. 2) Clean the laying area. 3) the laying of insulation layer. 4) the laying of the reflective layer. 5) the laying of steel mesh or directly stapling heating cable. 6) fixed according to design drawings lay heating cable. 7) detects nominal resistance heating cables and insulation resistance. 8) according to the requirements of pouring concrete filling layer (the construction team completed the construction and decoration, this step does not belong to the scope of electric floor heating). 9) detects nominal resistance heating cables and insulation resistance. 10) installed to warm the thermostat. 11) laying surface decoration materials, complete floor construction (by the construction team completed the construction and decoration, this step does not belong to the scope of electric floor heating). 3. The heating system construction program, specifically: 1) the laying of insulation layer - extruded insulation board (density ≧ 30kg) before laying the first grounds clean, then polystyrene insulation board laid flat and clean surface structure . Floor heating system should be laid neatly cut, there is a gap between the insulation board shall, with adhesive tape smooth. 2) the laying of vacuum metallized polyester --- laying aluminized, must be formed to cover the entire insulation board, and secured with tape. 3) the laying of floor heating system in the steel mesh steel mesh laid on the vacuum metallized polyester, joint application banding tape (or plastic staples) tightly and should overlap between the steel wire and lashing. 4. Laying floor heating system in the heating cable heating cable must be laid in the design drawings pitch wire-line, the minimum bend radius of 5 times the cable diameter, heating cable laying should be beautiful and straight. Not allowed to beat the heat cable. Fixed way: with a belt (or plastic staples) to the heating cable is fixed wire network; Note: a) whether before laying floor heating system in the heating cable to measure the heating cable with a multimeter and shake table of resistance and insulation resistance is normal. Resistance heating cables depending on the model, ranging from 20 to 1000 ohms; insulation resistance should be at least 5 megohms. b) Do not install when the ambient temperature is below -5 ℃. c) When installing floor heating cable stiff (due to low ambient temperature), first coiled heating cable dissolution, separately, and then powered a few minutes to warm to be used up. Do not be in a coiled heating cable is also looped state when he powered heating. d) If you have installed (toilet, install door smoking, etc.) are likely to suffer damage to the place, it must take effective measures to protect the heating cable. e) between the heating cable must not have contact with each other anywhere, cross or overlap between. This will cause damage to the heating cable overheating. f) heating to warm the cable must be separate from any combustible 13mm (including combustible spacers) to make sure to avoid the fire. g) If the heating cable is connected to the load power is greater than the total maximum load power the thermostat, the heating cable either be controlled by a plurality of thermostats, or connection control via an intermediate relay. h) minimum wire spacing of not less than 50mm, the maximum distance of not more than 300mm) temperature probe should be fixed between the cable and the cable from the cable is not less than two-thirds of the average laid pitch. 5) After heating to warm the cable test laid, by drawing check compliance with the design requirements and with the resistance and insulation resistance multimeter and shake table testing every set of heating cable is normal, ensure no heating cable short circuit phenomenon. And powered heating cables heat detection efficiency. 6) filled with concrete filling layer (completed by the decoration construction team) to fill the layer thickness should be in between 25mm-50mm and uniform application of wooden tools after pouring tamped lightly, and not strong crude ram; floor heating system after the completion of the filling layer 48 Master allowed to walk within hours of the ground after the completion of construction of non-filling layer tick chisel, overloading. 7) cable test again filling layer construction is completed, then the multimeter and shake table testing every cable in order to check the heat to warm the cable has not been damaged during construction 8) laying surface decoration materials (completed by the decoration construction team) laying floor decoration material is prohibited in the area covered with heating cables cut decorative materials; heating cables is prohibited in the area there are nailing. 9) Cable surface decoration materials tested again after laying is completed, and then shake table multimeter and detect each of the heating cable to check the heating cable in the ground during the construction decoration material damage. 10) floor heating system in the thermostat should be installed before the project delivery, so as not to destroy; to warm the thermostat installation manual shall prevail (after disconnecting the power supply before installing the thermostat, thermostat wiring installation. terminal installation should be solid and reliable, to ensure good insulation between the respective terminals); power detecting after installation. Temperature sensors must be installed to comply with the relevant provisions of "heating cable technology standards" and to ensure their full embedded thermally conductive layer (cement floor). 4. The heating system running the debugger 1) must fill layer of concrete curing after the expiration of (usually 21 days) to start debugging power. 2) The first time you start, commissioning heating cable heating system (floor heating system), the system should be set at 5 ℃ -10 ℃ low temperature range for some time, and then gradually raised the temperature until it reaches a temperature of heating comfort. 3) Thermostat debugging thermostat according to different types of installation instructions. 4) to debug the system should be "low-temperature radiant heating cable heating system running the debugger provision" implementation. Note: 1. Before using this product, should be the environment and the user's electricity distribution facilities for evaluation. Environmental and distribution facilities for electricity users can install better construction. For lower assessment value, (such as the power supply voltage is too high, the voltage change width is too large or long-term power outage; or when the user's family inside power distribution load and carrying less) Please suggest users until conditions improve and then be installation. 
Contact Detail
Company Name: Ji Ning Yiqun energy-saving heating equipment Co., Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Dong(Sales of a sales manager)
Telephone Number: 0537-6223999 0537-6224678
Company Address: Western Economic Development Zone Jining YUTAI, Jining City, Shandong Province, China
Zip/Postal Code: 272300
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450