Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Electric power plant power steel rod steel bar steel rod base

Electric power plant power steel rod steel bar steel rod base
Electric power plant power steel rod steel bar steel rod base
Electric power plant power steel rod steel bar steel rod base

Larger photo of automa dispenser

Company:Bazhou Shengda Electric Power Co., Ltd. steel bar
Information Name: Electric power plant power steel rod steel bar steel rod base
Update Time:2015-04-30
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
1, the election survey to select the path of the power line steel rod line is economically rational to have a great relationship. Need careful study, preferably in the design, construction, operation three-pronged approach to the site field reconnaissance to choose the best option; then carry out the investigation work, including fixed-line and collect measurements along the relevant information such as haul roads, docks, whether river available, whether the planned land along the rural villages, and wiring for conflict and so on. The latter is particularly important. Necessary construction agreement signed with the relevant units. When full-time as project design unit responsible for the design, then select line survey should be undertaken by the design department is responsible for handling. 2, the front-line construction positioning points must be determined based on the line pile bit of peace, a sectional view of other information, on-site positioning. Site Positioning is the process of determining the final straw bit later determined pole position to then divide pits, excavators and other earth order. Power steel rod with stakes in locating nail out of the main pile and vice pile. Divided according to the requirements or the size of the pit is shown in the construction drawings and construction, in accordance with the position of the main and auxiliary pile represented, marked on the ground digging range to the excavation pit personnel. 3. Transport Transport refers to the towers, wires, fittings, insulators and other materials shipped from the warehouse to the construction material transport pole. This task larger workload. The successful completion of transportation to work as soon as possible, the construction progress of the whole project a great relationship. Such as transportation scheduling properly, it will happen downtime to be expected slowdown, the case. The basic foundation construction include trenching and the laying of construction shall be made chassis, pull the disc, or on-site casting concrete foundation. The construction of living hidden works, or does not meet the requirements, if any deviation will affect the quality of legislation towers, even after running down the tower of a serious accident could occur. It is required to strictly ensure the quality, good construction records for inspection. 5. discharge welding rod such as the use made when the entire root cement pole, no welding, just stick to the positive pole row lifting position. Khan cement block fabrication, must be welded to the desired length at the construction site. Row before welding rod is more than two and a cement pole, as required in straight rows on the ground, and the shaft pad after pad is flat before welding. 6. Assembling line construction tower which is a major step. There are a whole group stood up and exploded stand two basic ways. Decomposition assemblage of towers, can be partially assembled in advance. It can also be assembled side edge lifting; overall rise of more towers were assembled on the ground before the stand. So the construction team also may need to be divided into two groups assembled and upright tower, construction, respectively. 7. The whole group after pole power steel pole tower stand, it may be due to group errors immediately, or cable anchors around, buried untamped, foundation subsidence and other reasons, led to the cross arm shaft tilted or twisted, etc., which in Wired corrected easily before, so you should stand in front of the line-by-group to conduct an inspection righting. While adjusting device on the tower, including screws and other components to ensure construction quality. 
Contact Detail
Company Name: Bazhou Shengda Electric Power Co., Ltd. steel bar
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Wu Fan(Sales Manager)
Telephone Number: 0316-7396655 0316-7396655-7394086
Company Address: Bazhou Kang Xian Zhuang Xiangdong Central Industrial Zone, , Hebei Province, China
Zip/Postal Code: 065700
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450