Dongguan environmental approvals how to handle
Dongguan environmental approvals how to handle
Business:? (1) All kinds of domestic sewage, industrial wastewater treatment engineering design and construction (2) all types of flue gas treatment, dust engineering design and construction (3) Different types of emissions, noise control engineering design and construction (4) all kinds of environmental equipment, electromechanical equipment, decontamination products (5) water purification project, the construction of air purification? (6) Utilities, ventilation equipment, environmental air-conditioning installation works? (7) environmental protection facilities operation and management (8) construction project environmental impact assessment ?? Dongguan City, Guangdong Green Environmental Protection Co., Ltd. Services: the Pearl River Delta and surrounding professional to undertake environmental projects, effluents Noise Control Engineering, sewage treatment standards acceptance engineering, sewage license application, the EIA report, environmental integration issues advice, charge d'affaires and other pollution permits. http://dghbgs.diytrade.com/ http://dghbgs.b2b.hc360.com/ http://v.youku.com/v_show/id_XODI0MjUwNTUy.html?firsttime=0 http: //dgyuelv.cn.china .cn / http://dghuanbaogongsi.diytrade.com welcome to inquire, we will give you the maximum benefits Contact: Mr. Liu Contact: 13713314026 QQ: 669430018 environmental procedures for the flow of time:? No. Name Remark 1 Environmental declaration??? and approval? 15 days? Environmental Protection Branch 2? sporadic water transfer? 5 days? qualified units (such as Yuefeng) 3? hazardous waste transfer? 10 days? qualified units (such as Conde) 4? EIA report preparation ? 30 days? qualified units (such as Central Division) 5? EIA report monitoring data? 30 days? EPA monitoring stations 6? EIA experts? 30 days? 7 qualified expert? EIA report approved? 30 weekday? EPA approval Section 8? construction? confirm with the factory? 9? environmental program approval? 30 days? Environmental Protection Industry Center 10? Environmental outfall standardized number to apply? 10 days? EPA monitoring stations 11 ? Environmental outfall sign making? 15 days? qualified units (Foshan Zhanjin) 12? Environmental Monitoring completed? 30 days? EPA monitoring stations 13? Environmental Administrative acceptance? 30 days? Section 14 EPA acceptance? sewage ? 5 working days to apply for the license number 15 Sewage Environmental Protection Branch, Environmental Protection Branch license for 25 days Note:????? over time as environmental standards, processing time, without modification due to the impact of information and so return time. ?????????????????????????????????????????????????? ???????????????????????????????? Dongguan City, "three simultaneous" environmental acceptance criteria and procedures within the scope of Dongguan City, Construction the environmental impact of construction projects must complete construction of environmental protection facilities. Before construction project was officially put into operation, it must be reported to the municipal environmental protection facilities, the EPA Regulatory Branch acceptance. "Three simultaneous" acceptance condition 1, environmental approval process complete construction projects, environmental protection facilities, according to the environmental impact statement approved by the (table) to build and design; 2, pollution prevention and control capabilities to meet the needs of environmental protection facilities of the main project; 3, emissions the design documents and the environmental impact statement of pollutant emissions in line with the state standards and in accordance with approved (Table) proposed; 4, environmental protection facilities outfall line with standardized requirements; 5, environmental protection facilities operating normally, operating conditions stable, running more than 75% negative Heda; by the training of qualified personnel in place environmental protection facilities operating positions; the establishment of a sound management system and procedures; the establishment of environmental protection facilities operation and accounting (commissioning period started to set up). Acceptance of the application and get the sewage plant license Related Issues The following points are relevant to the manufacturer, please verify:? First, the original factory have not done the EIA? Such as did the EIA, please send assessment approval the manufacturer's advice to my company. Second, if waste water, waste gas, noise engineering, environmental management project if there is to do? Third, the factory is now expanded or new? If the expansion of the previous increase on the basis of the content of the EIA old what? Fourth, the number of factory employees is the number? Whether in-house board? Fifth, whether the factory with a kitchen? Kitchen stove fuel combustion is what? Sixth, the factory have a generator? What brand? How much power? Seven factories have done no hazardous waste transfer contracts and sporadic wastewater contract?
Contact Detail
Company Name: | Dongguan City, Guangdong Green Environmental Protection.. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Mr Lau() |
Telephone Number: | 0769-13713314026 |
Company Address: | South City wins and Sports Dahenglu Jingtai Hin 504, , Guangdong, China |
Zip/Postal Code: | 523000 |
Find More Related Products
- EIA companies, EIA agencies..
- Wastewater treatment compan..
- Dongguan EIA report what co..
- Dongguan EIA fees, Dongguan..
- Dongguan environmental engi..
- Dongguan environmental comp..
- Datang Telecom over five ju..
- Dongguan environmental comp..
- What environmental company ..
- Dongguan environmental asse..
- Dongguan environmental appr..
- Dongguan EIA handle which c..
- Dongguan EIA what condition..
- Dongguan EIA price, Donggua..
- Dongguan EIA report which c..
- Dongguan how to handle the ..
- Dongguan EIA report and med..
- Dongguan environmental proc..
- Dongguan environmental proc..
- Dongguan how to handle the ..
- Dongguan EIA apply to what ..