BF Maintenance Engineering
BF Maintenance Engineering
|
Blast furnace maintenance procedures: 1, the cooling device in the repair cycle: 4 to 5 years, more than replacing the hearth cooling equipment. 2, cooling equipment overhaul cycle: 8 to 10 years, to replace the bulk of all cooling equipment. 3, smooth stave: ① before cooling wall installation, first install air big sets. ② first install perforated stave stave and air, minimum gap taphole frame flange is not greater than 10 mm. ③ stave vertical slit between the uniform deviation is less than 10 mm. ④ each stave has two parallel sides should finally be installed. After cooling wall installation ⑤ inner radius and furnace core deviation is less than 10 mm. ⑥ cut opening on the furnace shell, water wells do not exceed 1.3 to 1.5 times the diameter of the bolt holes is not more than 1.2 to 1.5 times the diameter. More blast furnace maintenance contents concern: http: //www.weilongjianshe.com/Product/Show.asp ID = 748 & cID = 1?
Contact Detail
Company Name: | Handan City Weilong Construction Engineering Co., Ltd. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Ma always() |
Telephone Number: | 0310-2035526 |
Company Address: | Handan, Handan City, Hebei Province, China |
Zip/Postal Code: |
Find More Related Products
- Weilong blast furnace overh..
- High acid and alkali metal ..
- ni60 nickel-based alloy pow..
- Powder coating base - Henan..
- Wearable technology - chose..
- DISK automatic reciprocatin..
- Northern China's largest Ex..
- Journal sleeve repair Masah..
- Thermal spraying aluminum t..
- UV ink components. Analysis..
- Cable ink composition analy..
- Supply of automatic slide (..
- Zinc thermal spray coating ..
- Continental furniture surfa..
- High close colorimeter pain..
- Colorimeter
- Hose ink composition analys..
- Printing ink composition an..
- Analysis to formulation ana..
- Comparative analysis compon..
- Offset printing ink composi..