Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

OM chimney temperature acid corrosion coatings

OM chimney temperature acid corrosion coatings
OM chimney temperature acid corrosion coatings
OM chimney temperature acid corrosion coatings

Larger photo of automa dispenser

Company:Zhengzhou is a Chemical Products Sales Co., Ltd.
Information Name: OM chimney temperature acid corrosion coatings
Update Time:2015-04-30
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
OM chimney temperature acid corrosion paint coating .OM chimney temperature acid corrosion coating main components, the product is an epoxy-modified silicone resin, pigments, additives and solvents and other components for the B component, the other component is Special two-component epoxy curing agent from the dry paint. .OM Chimney temperature acid corrosion coatings major feature film hard; superior drying performance; high adhesion, excellent three anti-performance, good wear resistance. .OM Chimney temperature acid corrosion coatings main purpose is widely used in various acid, alkali, high temperature performance salt environment, the ability of high temperature 250 ℃, and the need for anti-corrosion of equipment, containers, flue corrosion. .OM Chimney temperature acid corrosion coatings Technical Specifications Film appearance: film is smooth, standard plate .OM chimney temperature acid corrosion coating Drying time: the standard thickness of a single coat, 25 ℃, .OM chimney temperature acid corrosion coatings Tack ≤2 hours, hard work ≤24 hours .OM chimney temperature acid corrosion coating pencil hardness: ≥H .OM chimney temperature acid corrosion coating adhesion: ≤1 (circle method, class) .OM chimney temperature acid corrosion Coatings impact strength: 50kg cm .OM chimney temperature acid corrosion coatings bending test:? ≤1mm, .OM chimney temperature acid corrosion coatings heat resistance 250 ℃, 6 小时 .OM chimney temperature acid corrosion coating loss of light ≤30% , chalking ≤3 level .OM chimney temperature acid corrosion coatings water 30 days: no blistering .OM chimney temperature acid corrosion resistance coating acid (10% sulfuric acid solution, 10 days): not wrinkle, not sparkling, not off .OM chimney temperature acid corrosion coatings alkali resistance (10% sodium hydroxide solution, 10 days): not wrinkle, not sparkling, do not shed .OM chimney temperature acid corrosion coating paint Packing: 20 kg / barrel curing agent: 4 kg / hall. .OM Chimney temperature acid corrosion coatings basic parameters ratio: Paint: H-100 hardener = 5: 1 (by weight) .OM chimney temperature acid corrosion coating application time: 8h, (25 ℃) .OM resistant chimney high temperature acid corrosion coatings Theoretical amount: 150 ~ 250g / m2 .OM chimney temperature acid corrosion coating is fully cured: 7 days .OM chimney temperature acid corrosion coatings for corrosion Suggested application channel temperature paint, painting two, 50 ± 5μm / Road .OM chimney temperature acid corrosion paint matching paint finish as high-temperature corrosion, and OM-4-specific primer with matching chimney. .OM Chimney temperature acid corrosion coating surface treatment painted base to achieve clean, free of all dirt grease, dust, etc. .OM Chimney temperature acid corrosion protective coating method .OM chimney temperature acid corrosion paint Airless: Thinner: special thinner dilution rate: 0 to 15% (in the paint weight) Nozzle diameter: about 0.4 to 0.5 mm discharge pressure: 15 ~ 20Mpa .OM chimney air temperature acid corrosion paint spray: Thinner: special thinner dilution rate: 20 to 40% (by weight paint) Nozzle diameter: about 2.0 ~ 2.5mm ejection pressure : 0.3 ~ 0.5Mpa .OM chimney temperature acid corrosion paint roller / brush: Thinner: special thinner dilution rate: 0 to 20% (by weight paint) .OM chimney temperature shelf life acid corrosion paint store in a cool, dry, well-ventilated place, paint a year, a curing agent for six months. .OM Chimney temperature acid corrosion coating Construction Notes 1. Before you read instructions; the paint and hardener according to claim 2 ratio adjusted before use, how much with how much stir use, use within 8 hours Ends; 3. the construction process kept dry and clean, with paint hardener drums must Gaiyan avoid gelling; 4. Construction of the drying period and relative humidity not greater than 85%, shall, within 7 days after the product to be delivered Painting . . 
Contact Detail
Company Name: Zhengzhou is a Chemical Products Sales Co., Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Library Lynn(Sales General Manager)
Telephone Number: 0371-636659777 0371-63665977
Company Address: Zhongyuan District shall Township No. sanshilipu 189, Zhengzhou City, Henan Province, China
Zip/Postal Code: 450000
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450