Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

VOLEMT Wollongong Sports Ground acrylic surface coating series

VOLEMT Wollongong Sports Ground acrylic surface coating series
VOLEMT Wollongong Sports Ground acrylic surface coating series
VOLEMT Wollongong Sports Ground acrylic surface coating series

Larger photo of automa dispenser

Company:Huizhou City, Ze letter Industrial Co., Ltd.
Information Name: VOLEMT Wollongong Sports Ground acrylic surface coating series
Update Time:2015-04-29
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
VOLEMT American International Group, Wieland Chemical (USA VOLE Chemistry International Group INC.) Engineered coatings sector (Wollongong) sports venues acrylic surface coating series, using the world famous chemical raw materials, the quality of the global agreement. Playground on the ground floor can truly easy to crack, easy blistering, perception of good, long life and so on. The product has been used in a number of international events venue, recognized in the industry and stakeholders. Scope: tennis courts, basketball courts, badminton courts and other sports venues. Features: 1, colorful, colorful; 2, water-based raw materials, non-toxic, 100% green products; 3, easy construction, strong adaptability to climate and environment; 4, weather resistance, not aging, long life, Fast, good, deep color, color lasting subside; 5, excellent wear resistance, slip resistance, not easy to powder; 6, good elasticity, easy to crack, with a comfortable sense of movement; 7, strong adhesion, peeling high strength, not hierarchical, breathable, easy blistering; 8, routine maintenance convenience, low cost. Service life: generally 5--10 years Model: PF-R (red), PF-G (green), PF-W (white) PF-B (blue) Package: 5 gallons (US), 55 gallons ( US) standard color cards VOLEMT PF-G VOLEMT PF-G3 dark green, light green VOLEMT PF-R crimson VOLEMT PF-R3 reddish VOLEMT PF-B6 dark blue VOLEMT PF-B3 blue imported acrylic sports venue construction guidelines I. construction process: base surface: smooth, strong, no loose floats, clean clean, cutting slits reasonable temperature (cement-based). Base acid: wet ground with water first, and then the concentration of about 5-8% of dilute hydrochloric acid pickling on the ground, then rinse with water, drying before proceeding to the next step after construction dry enough. Interface layer: 1, with F-226 as the basis of the interface layer brushing venue again; a standard amount of space is about 20KG, diluted with water 2-8 times use. Binder coating: the coating has a thickness of about 0.8-1mm, construction method is as follows: 1, with the F-226: quartz sand (60 to 80 mesh): cement ratio of 1: 1.3: 0.7 ratio by adding the appropriate water (about 0.2 - ratio 0.5) slurried evenly scratch on site; 2, after the upper layer coating is dry, with the F-226: quartz sand (60 to 80 mesh): cement ratio of 1: 1.3: 0.7 ratio by adding the appropriate water (about 0.2 to 0.5 scale) slurried Zaigua again. Colored coating: 1, with VOLEMT acrylic surface coating: 80 to 100 mesh quartz sand ratio of 1: 1.3 to 1.5 add water (amount of water for the fabric of 0.5 to 1 times) mashing, scratch on site. May be appropriate to add a small promise cement, preferably white cement, the ratio of the amount of about 0.2 to 0.4, then the amount of quartz sand should be reduced accordingly, increase the amount of cement can be a corresponding increase in the number of hardness of the coating, but Coating flexibility reduced accordingly. Colored coating recommends a minimum of three times more than do. Flat colored layer: color coating alone after dryness, steel shovel out the projection of sand, sweep the dust; finishing coating: The surface coating of acrylic VOLEMT: water ratio of 1: 0.5 to 1 dilution, in Scraping the colored layer of paint layer, to achieve good texture effects; boundaries coating: VOLEMT PF-W with white acrylic paint painting white standard playground two boundaries. Second, analyze and solve common problems: 1, partial bubbling during construction or in the initial construction is completed, because the foundation is not clean, firm or foundation of evaporation pressure is too great, finishing the coating is too thick coating and other causes base surface delamination. Bubbling site area will be expanded to shovel out to the base layer, clear base, and then diluted with a sufficient amount of F-226 was in need of repairs at brushing, allowed to fully wet the base surface, reinforced base while increasing adhesion, and then In the above step by step with the corresponding reinforcing material handling; 2, coating the surface of coarse projections due to the construction of outside influence, paint mixed with sand or debris, available gray knife shovel out or using a hand grinder mill flat, while the lower layer of the construction, we must clear the dust, try to keep the site clean; 3, surface coating anti-white, mostly because the fabric coating is dry water actions, and can be re-scraping place finish in reverse give cover, the construction should pay attention to weather conditions, when the temperature is below 5 ℃ not construction, otherwise it will affect the quality. Third, pay attention: 1, the new concrete curing before laying site maintenance required after construction is completed; 2, must stir the deployment of paint; when mixed with water slurry, water can not be added at once, stirring must be added slowly to avoid precipitated silica sand slurry system. 3, before the end of material brushing, ensure that the ground was dry; 4, rain not construction, avoid the sun or humidity greater than 90% with construction; 5, the indoor venues should maintain good air circulation; 6, surface coating complete need to soak for at least 10 hours in dry, low temperature may take longer; 7, after the completion of venues laying need to maintain more than seven days in order to put into use. 
Contact Detail
Company Name: Huizhou City, Ze letter Industrial Co., Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Mr. Lin()
Telephone Number: 020-82521185
Company Address: Huizhou, Huizhou City, Guangdong, China
Zip/Postal Code:
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450