Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

LD-213 stone hanging plastic

LD-213 stone hanging plastic
LD-213 stone hanging plastic
LD-213 stone hanging plastic

Larger photo of automa dispenser

Company:Shijiazhuang Li Ding Electronic Materials Co., Ltd.
Information Name: LD-213 stone hanging plastic
Update Time:2015-04-29
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
First, the features: LD-213 stone hanging plastic thixotropic high, good operability, side gluing is not flowing characteristics, acid, high temperature, anti-aging, anti-freeze, solvent-free, no oil leakage. LD-213 stone hanging plastic of the technical indicators are to meet the "hanging stone curtain wall with epoxy adhesive JC 887-2001" requirements. Second, use: 1, dry stick construction stone, floor tiles, wall tiles paste; 2, root anchoring walls frame and body structure; 3, bonding of stone and metal pendant; 4, stone repair local damage; 5 , bond precast concrete pieces; 6, the structure of the peripheral reinforcement bond; 7, tile and marble mosaic; 8, tile / brick, tile / concrete adhesive and grout;? 9, concrete crack repair. Third, the basic characteristics of the components A, B two-component mixing ratio by weight of A: B = 1: 1 Appearance A: white burnt fingers; B: yellowish burnt fingers. After mixing gray burnt fingers (the color can be adjusted according to user needs) Density (g / cm3,25 ℃) 1.75 Compressive strength (MPa) 74; (GB / T2569) flexural modulus (MPa) 3550; (GB / T2570) impact strength (kJ / m2) 4.3 gel time (150 g, 25 ℃) 45 分钟 film drying time (25 ℃) 360 分钟 compression shear strength (Stone) Standard conditions 48h ≥10Mpa soaking 168h ≥6Mpa heat treatment 80 ℃, 168h ≥7Mpa 4, freeze-thaw cycle 50 times ≥7Mpa use of methods: 1, surface treatment: no laitance, loose material, dust and suffer, oil; 2, mortar preparation: LD-213 stone hanging plastic A and B components in strict accordance with the operating instructions were consistent color mixing state; 3, coating: The steel spatula or similar tool applied mortar mixed surface sticky, then bonding. V. Note: 1, when used according to the weight ratio (A:? B = 1: 1) thoroughly mixed, it may cause yellowing stone. 2, LD-213 Stone hanging on the wet glue should stone construction, the construction must be polished smooth roughened construction temperature should not be lower than 5 ℃. 3, when the winter cold, the best colloid A, B are heated to (30-40) ℃ after mixing,? Never allow bonding material is moved is not completely cured. 4, unused blend not fall back to the original packaging bucket. 5, safety measures in the workplace: gloves, masks, goggles and other items must have. LD-213 stone hanging plastic is a chemical goods, when the eye or skin tarnished, then immediately wipe dish detergent and running water rinse, such as feeling unwell, should seek immediate medical attention. VI Packing: ?? 4 + 4 kg / set or 10 + 10 kg / sets or 25 + 25 kg / set, drum packaging. Seven, storage and transportation: 1 ,? cool conditions in the dark for a period of six months; 2, non-dangerous goods, by automobiles, trains, ships and other transportation. Address: High-tech District, Shijiazhuang City, Xiangjiang Road 319 Tianshan Science and Technology Industrial Park 6-1-502 Tel: 0311-80660330 Mobile: 18032162188 Fax: 0311-87319869 
Contact Detail
Company Name: Shijiazhuang Li Ding Electronic Materials Co., Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Zhang Juncheng(Sales Manager)
Telephone Number: 186-31105227 0311-18631105227
Company Address: 319 Xiangjiang Road, Shijiazhuang High-tech Zone, Shijiazhuang City, Hebei Province, China
Zip/Postal Code: 050050
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450