Beijing neon LED lights maintenance repair most professional
Beijing neon LED lights maintenance repair most professional
My company specializes in, production, design, maintenance, installation, repair neon, LED lights make repairs, plastic door first billboard, plastic light boxes, acrylic light boxes; new products neon installation, design and maintenance services; signs signs, LED signs; luminous characters, metal words, organic characters; from the beginning of the 1930s to the present development, rhythm jump machine, light control, rain stopped, a time control the timing and the like. Neon lighting technology, amazing progress in recent years, complex lines and shape, resulting in aesthetic freedom. When the stars shine, dark night sky, we can see the colorful neon advertising, luminosity strong point off freely, under or strong, or soft atmosphere play a significant advertising effect. Neon was not full effect during the day, but one night on the release colorful glory, played a highly ability advertising. 1, the main process: (1) design: first to design a good renderings, study the terrain, height, width, placed brackets, charge, security, anti-hail aspects of the problem, all belong to the design range. (2) modeling: refers to the way calligraphy enlarged color. Small color sample is determined after the general, do not adjust the zoom after processing. (3) based on: neon lights installed on any object, its attachments, I am here to speak the production process, briefly. (4) Line: design calculated according to tube length, the number of electrodes, the installation position, wires, cable routing, etc. (5) Preparation of pipe: pipe bends first to prepare, with the selection of the drawings can be carried out, how long tube (1-1.2 meters) how much of the pipe diameter (inner diameter: 1.5 cm thick, thin 1 cm), are Well first and then get ready for a pressure test to the prepared glass pipe, one by one check again (to be washed, dried, no pollution no crack). (6) nest Crafts: to put real big word anti stood, opposite good nest good contrast. Grilled on the gas burner tube hydroxide, according to chart the requirements of baked curved, making it consistent with the design requirements for graphics. Meanwhile inlay has been made of one electrode tip (head). The electrode spacing and the current amount limit, meet the design requirements and to stay well vent (hole). Waterloo tube: 2-3 months, workers fee: 2.5 yuan / tube, 1000-1500 yuan monthly funding, 2000-3000 yuan / Good (7) color: glass pattern determination is completed, according to the desired color renderings , the suction tube into the vacuum (absolute vacuum), exhaust machine ten thousand dollars, there is a mercury form, generally good absolute value of the position with a red tick. Enter a different inert gas, depending on the color of the gasification and discharged into oxygen, argon, red, yellow, pink, add a small amount of mercury vapor, green, blue, white, argon: 30 yuan / cans shuangjing sell the same size bottle with heating, 2 -3 million in the pot, and the air inlet sealed. Then, respectively root feeding tests. After passing by the graphics need to be unnecessary shiny part, with black lacquer painted black implicit part of good. (8) try burning: according to renderings of design, whether there is a trip, chasing change, the full part of the glass has been charged gas segment tube variety of different shapes, the coupling into the circular desired, generally one meter station Standard (Transformers) saving 150-145 yuan / sets, saving 130V-450V has become a plus chase changing, a generally two-hop, three-hop, jump up to seven, one more plus a changing table and a transformer, only km within the tube can bring, so long life. Be sure to pay attention to safety, after 80 hours of continuous ignition better. (9) test equipment: At the same time, relying on generally good, rack, metal rack or Tongzi, iron word and all ready to etodolac posturing together, can result given. Certain fixed die, the transportation convenience, easy to install and test equipment. Than the size of the lamp and the font, the transformer (450V), changing the stent is now ready, and then carefully wrapped the tubes placed in a fixed packing boxes. (10) Installation: Depending on the size neon small general floor with glass foot column as graphics installed, the appropriate degree of burning lamps were well secured by tying glass stud feet. (11) takes over: while the line connected according to design requirements, weld joint, put the glass casing, usually coupled with a bare copper wire, to prevent warming. Insulation must be done, not loose joints, prevent sparking, poor contact phenomena affect the safety and effectiveness. When running to pay attention to neat and smooth, to avoid interleaved across. Successive lines of the ministries according to the design of the transformer terminal access intersect. (12) Check: designer to the relevant authorities for the early detection, in addition to modeling, but also focus on the subject.
Contact Detail
Company Name: | Beijing-flight Jianye business center |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Sun Wei(Managers Managers) |
Telephone Number: | 010-13661018-282 13661018282 |
Company Address: | Yuanda Road, Haidian District, Beijing hospital on the 12th, Beijing, Beijing, China |
Zip/Postal Code: | 100070 |
Find More Related Products
- TND-10KVA single-phase high..
- MR16 lamp cup drive power, ..
- Heilongjiang car wash to sc..
- POWERLED drive power LED in..
- 400V1500UF capacitor
- 400V1200UF capacitor
- Beijing plastic runway cons..
- Luo Yunxi broker 18620555299
- 400V1000UF capacitor
- 400V820UF capacitor
- 24V1A Switching Power Supply
- 24V1.46A Switching Power Su..
- 24V2.1A Switching Power Sup..
- 24V3.2A Switching Power Sup..
- 24V14.6A Switching Power Su..
- 24V5A Switching Power Supply
- 24V4.16A Switching Power Su..
- 24V16.6A Switching Power Su..
- 5V50W Switching Power Supply
- 5V35W Switching Power Supply
- 12V Switching Power Supply