Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Hand movements to move mobile lighting beacon lighting lighting experts

Hand movements to move mobile lighting beacon lighting lighting experts
Hand movements to move mobile lighting beacon lighting lighting experts
Hand movements to move mobile lighting beacon lighting lighting experts

Larger photo of automa dispenser

Company:TY Hubei Ming Technology Co., Ltd.
Information Name: Hand movements to move mobile lighting beacon lighting lighting experts
Update Time:2015-04-29
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
M-SFW6130 a full range of mobile lighting lighthouse, before drag lighting lighthouse: The Company in order to meet the troops, railways, electricity, public security and other enterprises, as well as a variety of large construction operations, mining operations, maintenance, repair, incident handling and disaster relief Work site of a large area, high brightness lighting needs, research and development and production of special M-SFW6130 full-trailer lighting lighthouse can be getting off to work in a variety of bad service member. Second, the performance characteristics of drag lighting lighthouse: 1, lighting performance: Medallions uses four 1000W energy efficient lamp lighting, high brightness, large coverage, both near and far lighting, lamp life up to 10,000 hours or more, especially for large-scale outdoor work lighting. 2, lifting performance: Lighthouse lifting rod made of high strength alloy material is refined, to achieve automatic lift adjustment, the maximum rise height of 6 meters; four lamp can be adjusted up and down around a single irradiation angle, so that the light covers the entire job site. 3, working time: the use of imported high power generators, gasoline generators once filled nine hours of continuous working time; there is electricity in the place, can also be connected to 220V AC power for long time lighting. 4. Convenient operation: remote control or move the switch are two ways to control the lift and vertical lift lever down, simple, safe and reliable; wireless remote mode to control the lifting and stand down lift rod within 30 meters. 5, Applications: Lighthouse whole using a variety of high quality alloy material, compact structure, stable performance, can work in a variety of harsh environments and weather conditions, wind resistance rating of eight. 6, flexible and convenient: optimized structure design for easy mobility handling, can be easily connected to the trailer moved to any construction, emergency scene. Third, use drag lighting lighthouse: an installation U-bracket ⑴ body side door open, remove the Allen screw ⑵ rear body location on the U-shaped bracket erected at the rear of the vehicle body mounting position, U-bracket positioning pin on the left. ⑶ with hex screws U-shaped bracket secured to the vehicle tail. 2. Install towbar ⑴ with support from the top front part of the vehicle body, and then open the side door of the vehicle body. ⑵ bolt with a wrench inside the body fixed L-bracket twist, then pull out the L-shaped bracket. ⑶ the tow rod into the body, bolted to the vehicle interior, followed down the front foot, adjustable support legs to the appropriate height, and then plug in the vehicle interior fixing pin ⑷ chains removed, hung in the compartment at the bottom of the hoop ends on, followed by a chain linked hook tow bar; and finally out of the support. 3. After installing the support leg after both sides of the rear compartment pulled ⑴ fixed support leg latch, pull out the support leg to the appropriate location, and then plug fixing pin. ⑵ joystick support after foot height adjustment, make the wheels off the ground, the body weight falls on the foot support. 4. Installation ⑴ the lighthouse beacon lifters carried to the top of the lift rod body, placed into the U-shaped bracket U-bracket ensure that plug into the positioning hole inside the riser. Installation; ⑵ the lift rod 6-pin cable, the four core cable separately on the body through the large and small joints introducing Gülen body and follow illustrates the cable connected, pay attention to one correspondence between cable Note Shanghao packing, tighten the Glen joints ensure sealing effect. When ⑶ installation of two cables, it should pay attention to outside the body 15-20CM left margin, so when the lift rod lift cable by force. 5. Remove the body ⑴ install rope pulley above the front two positioning pins and lift the front of the pulley and lever positioning pins. ⑵ wire rope winch on the car body through the body at the bottom of the pulley position the hole, pulled out from under the pulley groove site, and then removed from the front of bypassing lifter pulley and the pulley mounted on the front position of the elevator shaft and then pull back the rope at the bottom of the upper part of the body pulley holes and the rope fixed by pins. Chuck direction taken to ensure that the rope toward the front, and to ensure that in the clamped state, not loose. ⑶ installed above the lifter pin holes of the front of the pulley, the pulley rope to prevent falling. 6. Unscrew the bolts installed under the cap ⑴ lift rod fixed cap on top of the crossbar; then adjust the four lamp mounting brackets cause a horizontal position. ⑵ will turn four lamp fixed to the beam. ⑶ input cable four lamp access on top of the lift rod junction box, press the icon requires good line; note the order of four lamp wiring installed junction box cover. IV Notes drag lighting lighthouse: 1, adjusting a level three support legs adjust height, so that the level meter drop to the middle position. 2. Fill the fuel to generators, oil according to specification requirements refueling generators, oil. 3, start the generator set to start the generator set generator set in accordance with the instructions. Body side door must be opened after the two generating units to start, in order to facilitate air convection. 4, raising the telescopic rod inspection depending on the lighting requirements, adjust the lamp illumination angle; four lamp may be at the level of 360 °; adjusting the irradiation angle up and down within the range of 180 °. Remove the front part of the fixing pins. Check the lighthouse in the top 13 meters of height without any obstacle. Check the wire rope in good condition; check all fixed pin, bolt security lock. 5, standing telescopic rod control panel to open the compartment, the operating conversion on the control panel switch to the upright / inverted position. Press the red dot switch, lifting lever to move the upright; when pressed for 3 seconds, the lifter starts a long stationary state, the lift rod continuous standing. When the lifter is fully upright, press the red button again, turn off the motor; then, fixing pins inserted into the front part of the car lifter, fixed. 6, raising the telescopic rod to convert on the operator control panel switch to "lift" position. Press the red dot switch, lifting lever to move the rise; when pressed for 3 seconds, the lifter starts a long stationary state, the lift rod continuous standing. The lighting needs to determine the height of the telescopic rod rises again pressing the red button to turn off the motor; lifting arm stop rising; lifter maximum rise height of 10 meters. After the lifter raised position, the operations into the panel switch to the middle position to prevent misuse. 7, open lamps for lighting the four flip the light switch on the control panel, lit lamps for lighting; lamp start-up time of about 10 minutes; 10 minutes after the lamp is completely started may need to set the lighting on or off any lamps. Closed lamp starting again, wait 20 minutes or so, and so the lamp is completely cooled before they can be restarted. The top of the control panel is provided with panel lighting switch, when pressing the switch, lighting start, staff can easily operate at night. 8, remote control lighthouse lift, vertical lift lifting rod down the lighthouse, standing down on the remote control can also be used to control the remote control range is 30 meters. There are A, B two keys on the remote control; where "A" key to control the up / stand, "B" keys to control the drop / down. With remote control lifter lift. The rotary switch on the control panel pull to "lift" position, then move A key safety; lifter rises; pressing the B button, the lift rod is lowered. With remote control lifter stand down. The rotary switch on the control panel pull to "stand down" position, then move A key safety; lifters standing; pressing the B button, the lift rod down. 9. Close the lamp after use, first turn off the lamp. Open body panel, turn off four lamps. 10, lower telescopic rod to convert on the operator control panel switch to "lift" position. After pressing the green button for 3 seconds, lifters normal lowered. When the lift lever down position, press the green button again, turn off the motor. 11. Check the lift rod telescopic rod tipped down direction, no human activity. The fixed lifting rod fixing pin removed. Will be converted on the operator control panel switch to "stand down" position. After pressing the green button for 3 seconds to slow down the lift rod. When the lift club into position, press the green button again, turn off the motor. The tail end of the body fixed pin Shanghao, prevent the lift rod slidably move. 12. Close Close turbines generators. Close body two side doors. 13, the vehicle body is connected to the front end of the trailer and the trailer connected to the vehicle body. Collapse three support legs, and fixed with a lock pin. Remove the vehicle interior lights and trailer cable connected to the lighthouse onto designated locations. Fifth, quality assurance drag lighting lighthouse: This product is strictly in accordance with IS9001: 2000 international quality management system standards for quality control to ensure product higher than the national standard, fully meet the design requirements, from 3 years from the date of purchase, the product under normal use appear any failure by the Company free maintenance. 
Contact Detail
Company Name: TY Hubei Ming Technology Co., Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Xiong Lihua(Xiong Lihua clerk)
Telephone Number: 027-84891680
Company Address: Hanyang district of Wuhan City, Wuhan City, Hubei, China
Zip/Postal Code: 430051
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450