Watson air conditioning fan heater factory workshop FIG fan heaters
Watson air conditioning fan heater factory workshop FIG fan heaters
Industrial hot water heater machine - Texas Watson air-conditioning plant is common on an industrial heating equipment, not necessarily with the common understanding of much much more, how does it work? How hot is hot air? How much water can produce much hot air? Drying, then how should set up? This series of questions you do not say I do not know, I'm only responsible for the procurement of such words, very real person in charge is a lot of technology not so much time to engage in the procurement, only the relevant model parameters inform procurement staff, so this time is wish I could take a look, although the details of the different, but the main idea is the same, namely, hot water heaters working principle. Fan heater is a joint unit by the fan motor, air heater, blinds combination. When the air does not contain flammable or explosive gases, as with circulating air heating. Hot water heaters working principle is: heat pipe heat medium flowing through the air heater, the heat transfer by convection to the base of the tube wall, the inner wall and then to transfer the heat to the outer wall and the fins, the fin heat transfer through the outer wall and then to the final Forced convection and radiation heats the surrounding air ways. 1. Hot fan heater can be mounted on the wall structure; integrity should be checked before installation heater machine; 3. hot water on the road back to the warm cycle should be equipped with heat pumps; 4. Motor wiring should be made Signs indicate the fan impeller rotation direction of the rotary press; 5. water heater before use, carefully check the connections at the tightness, if loose, should immediately tightened; 6. Before hot water heaters for each job, To drain the radiator in a mixed gas, preheat for 5-10 minutes sending wind work; 7. End the heating season, the hot water heater should be filled with water inside the radiator; 8. Hot water heaters machine must be kept clean, available In addition to the compressed air to blow dust heat exchanger fins and other parts; 9. Hot fan heater 2 - 3 years, should immediately wash water cavity of the heat exchanger can be used chemical methods to remove scale; for air containing combustion dangerous dust and explosive gases generated untreated fiber production plant, from a security point of view, can not use recirculated air. Using plant Axial fan heater heating, to make the workshop more uniform temperature field, to maintain a certain speed section, should make the jet of warm air when the layout of interface between machines, so that the formation of a total heating room air circulation. 1. Hot fan heater can be mounted on the wall structure; integrity should be checked before installation heater machine; 3. hot water on the road back to the warm cycle should be equipped with heat pumps; 4. Motor wiring should be made Signs indicate the fan impeller rotation direction of the rotary press; 5. water heater before use, carefully check the connections at the tightness, if loose, should immediately tightened; 6. Before hot water heaters for each job, To drain the radiator in a mixed gas, preheat for 5-10 minutes sending wind work; 7. End the heating season, the hot water heater should be filled with water inside the radiator; 8. Hot water heaters machine must be kept clean, available In addition to the compressed air to blow dust heat exchanger fins and other parts; 9. Hot fan heater 2 - 3 years, should immediately wash water cavity of the heat exchanger can be used chemical methods to remove scale; for air containing combustion dangerous dust and explosive gases generated untreated fiber production plant, from a security point of view, can not use recirculated air. Using plant Axial fan heater heating, to make the workshop more uniform temperature field, to maintain a certain speed section, should make the jet of warm air when the layout of interface between machines, so that the formation of a total heating room air circulation.
Contact Detail
Company Name: | Texas Watson air-conditioning plant |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Su Guozheng(Sales Manager) |
Telephone Number: | 0534-5087808 534-6351260 |
Company Address: | Dezhou Wu Lu right Tuen County Industrial Park, No. 188, Germany City, Shandong Province, China |
Zip/Postal Code: | 253000 |
Find More Related Products
- Production cooler cooler ai..
- Mine heating heaters, heate..
- Vapor air curtain air curta..
- Steel Aluminium composite f..
- Watson has been certified a..
- Manufacturers for central a..
- Watson has been certified a..
- Watson-conditioned Figure f..
- Vapor finned radiator facto..
- Watson Quality Assurance Ce..
- srz Heaters Heaters Watson ..
- Hot water air curtain air c..
- Watson-conditioned FIG _ _ ..
- Wholesale air-conditioning ..
- Watson has been certified a..
- Watson Radiator Radiator an..
- Xiqing quality cooler coole..
- Tanggu cooler Watson condit..