Changsha diatom mud diatom mud Wukesong how diatom mud, construction methods
Changsha diatom mud diatom mud Wukesong how diatom mud, construction methods
How to use the diatom mud, diatom mud construction method of construction methods, procedures Construction Notes * construction process to avoid strong wind blowing straight and direct sunlight to dry naturally appropriate. * This product is a water-soluble decorative materials can not be used directly affected by the flooding shower areas. * Natural raw physical properties including the presence of a certain color difference is normal and does not affect product quality. * Diatom mud should not be below 5 ℃ environment construction. Diatom mud do not eat, avoid entering the eye. * Keep children away from safe storage, strengthen labor protection use. * For the hollowing or cracking of the substrate must be pre-treated, after cleaning the substrate brushing two times putty. Construction method, over the spreading rate should be 0.8 - 1.0 m / kg or so. 2, to ensure that the base surface smooth, dense, clean, moisture content less than 10%, PH value of less than 10, Yang angle and line-horizontal hard straight; 3, in the professional and technical staff to develop formulations according to the site diatomite weather conditions, according to diatom mud The method provided by the manufacturer in the raw material, to add water, and on-site mixing a certain time, so that the mixture was thoroughly dissolved, the reaction was complete; 4, carefully covered not spraying the site, check the base surface condition is reached before construction requirements, pay attention to ensure the timely adjustment construction speed, to ensure that the external walls of the wet film thickness 3 mm, 2 mm dry film; interior wet film thickness through the 1.2 mm, 0.9 mm dry; construction step 1, under normal circumstances diatom mud daub completed two passes, the first pass (thickness of about 1.5 mm) after the completion of about 50 minutes (depending on the weather site to surface tack is appropriate, there is the case of the materials exposed at the end of the fill level), apply a second time (with a thickness of about 1.5 mm). Apply with a spatula after collection of light, and then use the tools to create a pattern, the pattern produced a long time, after completing the necessary portion of the design collection of light again. 2, first prepared in accordance with the amount of construction of water, construction of water was added to 90% of water in the mixing container, then pour the diatom mud soaked dry after soaking stirring with electric mixer for about 20 minutes, stirring while adding another 10% of water, stir evenly before use. After mixing with water the product is best used up today. Construction site mixing 1, in a large container to pour 90% water, then pour diatom mud powder. 2, stir with a small high-speed mixer. 3, stirring utilize surplus water (1 percent) adjustment. Environmental construction requirements 1, fabric construction temperature -5 ~ 40 ℃, summer in direct sunlight to avoid construction; 2, relative humidity must be less than 80% during the construction, the base surface moisture content less than 10%; 3, in case of other technical problems are Please diatom mud factory technical personnel to deal with immediately. 4, 5 ℃ not construction in the following circumstances; 5, rain, snow, hail and other inclement weather prohibits outdoor construction
Contact Detail
Company Name: | Changsha Wukesong diatom mud diatom mud diatom mud envi.. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Wong() |
Telephone Number: | 0731-82027256 |
Company Address: | Wanjiali home building materials Plaza, Changsha City, Hunan Province, China |
Zip/Postal Code: |
Find More Related Products
- Suzhou used battery recycli..
- Acquisition polymer lithium..
- Health insoles Patent | Gre..
- Substantial recovery of sto..
- EC goods acquired plants of..
- Hong Kong zero-tariff power..
- Stock index futures with ca..
- Weifang inspection cabinets..
- Low frequency digital inspe..
- Gansu intelligent data logg..
- Hui medium OL-HMI-45/6 patr..
- Shandong Supply TH-F-IV-75/..
- Texas Hui in inspection of ..
- Hui medium TH-X-XF-45/8 Mul..
- Aluminum retractable door m..
- HZD-XF inspection JH-XF-37/..
- TW-FAW-75/8 fire low freque..
- JH-XF series Hui in inspect..
- JH-XF-55 / 9TW-FAW-75/4 Fir..
- 3c certificate most complet..
- Shandong area of ??digital ..