Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Shandong Kleinwort wet wet spraying machine shotcrete machine wet jet

Shandong Kleinwort wet wet spraying machine shotcrete machine wet jet
Shandong Kleinwort wet wet spraying machine shotcrete machine wet jet
Shandong Kleinwort wet wet spraying machine shotcrete machine wet jet

Larger photo of automa dispenser

Company:Shandong Jia letter Machinery Co., Ltd.
Information Name: Shandong Kleinwort wet wet spraying machine shotcrete machine wet jet
Update Time:2015-04-29
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
Wet wet spraying machine shotcrete machine shotcrete machine wet concrete jet jet wet spraying machine manufacturers wet spraying machine price Shandong Machinery preferred price good letter, worthy of your trust! The best quality service and products all in good faith! Welcome you soon wet spraying machine is a new and efficient sprayed concrete machinery, mainly used for wet concrete jet. Wet mix spraying enables uniform mixing, water-cement ratio can be accurately controlled, in favor of water and cement hydration, thus small dust, rebound small, homogeneous concrete, high strength. It has advanced technology, reasonable structure, stable performance, easy operation and maintenance, long life and other characteristics. For coal mine tunnel shotcrete high marsh construction operations. Wet with water jet is to have a good mixing of concrete, the jet pressure to the injection nozzle and is injected by compressed air and equipment. Wet spraying machine features: mixing good quality, high environmental protection, efficiency, resilience and low ZSP series of wet spraying machine parameters: Technical parameters 7 5 Concrete Concrete jet jet production capacity of 5 m3 / h 7m3 / h maximum transmission distance ( horizontal / height) 30/20 m 30/20 m Application materials water-cement ratio of 0.20 to 0.40 0.20 to 0.40 Concrete Mix Ratio 1: 4-5C / A maximum aggregate size Ф 15 mm Ф 15 mm Conveying pipe diameter Ф on 50 mm Ф 50 mm conveying work pressure 0.2-0.4 MPa 0.2-0.4 MPa conveying air consumption 10 m3 / min 10 m3 / min feeding height 1.1 m 1.1 m air consumption 7-8m3 / min rotor speed 11 r / min 11 r / min power 5.5 Kw 7.5 Kw Voltage 380V 380V Machine weight 1000kg 8580Kg Dimensions (L × W × H) 1980 × 950 × 1300mm 1980 × 950 × 1300mm structure and working principle of wet spraying machine: the stirred material from Ingredients mixer discharge port (or artificial spices and feeding) discharged into vibrating hopper through the mesh for the Jets hopper, feeder struck by a dial-through material injected into the cavity of the rotor, with the rotor is rotated to discharge mouth, where it is compressed air chamber Walter blow the material into the cyclone. Here, by the introduction of another unit cyclone wind, the wind was long spiral state disperse the material, speed, and rotating it float into the conveying pipe, to reach the nozzle and then add a small amount of added water is ejected. Wet spraying machine structure: mainly by the drive means, the rotor assembly, gas system, injection system and electrical control box and other components. Wet spraying machine for relatively poor field conditions, minimal amount of maintenance. However, as with all rotor sprayed concrete machine, must often maintenance. 1. seal plate and rotor liner is the key element of this device, they must pay great attention to maintenance, to improve their life. Rotor clamping force applied to the sealing plate clamping system over the entire plate surface distribution is uneven, the residual gas in the discharge port and the largest port, and the maximum clamping force point with the rotation of the rotor drift back and forth constantly. This difference in pressure by a four-point clamping system to solve, so that when the machine is running extremely slight combination of surface leakage. Therefore, the correct use of the machine for worn clamp consumption costs have an important impact. Before the class began to spray concrete work, to check the clamping force applied to the rubber pad and rotor liner. Because the pressing force is too small, it will cause air to escape from the junction of the two plates, carrying fine particles will enter between the two plates, rubber plates and rotor exacerbate liner wear; if the pressing force is too large, due to friction overheat and cause excessive wear of the seal plate, seal plate heat limit is 110 ° C, generally use no more than 80 ° C below normal. Class work is completed, to clean the machine, especially to the sealing surface of the plate and rotor liner cleaned; the same time to check the wear liner sealing plate and rotor, if the sealing plate has been worn to such an extent: Steel dowels flush with the rubber surface (see Fig. 8), the sealing plate must be grinding, tick tendons or replaced with new boards. Because then the rotor will be in direct contact with the steel backing plate dowels pretension of the sealing plate is not sufficiently effective sealing is obtained, so that it loses tightness. Rotor liner must be checked once a week, if deep scratches (deeper than 1mm) occurs, it should be re-grinding (repair method, see VII). Lining the circular hole edges should always check, it must be kept sharp edges. If the edges are chamfered, fine particles will penetrate the joint surface increases wear and tear, if it was a new seal plate, and the old liner material hole with beveled edges, new life will be significantly sealing plate shortened. Timely grinding rotor liner, removing the worn part, save a lot of hassle and cost savings. 2. The release material chamber and cyclone have release function, it is generally not bonded at work. However, the rotor should be opened after the end of each class of the cyclone were cleaning up. 3. reducer should always pay attention to maintenance and repair: A. reducer lubricants No. 50 industrial gear oil (SY1172-77S), or the 30th machinery oil; B. reducer when working temperature not greater than 40 ° C ; C. Work should be cleaned after each shift gear unit surface adhesion of the mix and other debris; D. always check the oil level, lack of lubricant should be promptly filled; E. total working 250 hours (about three months) after should replace the oil. Wet spraying machine Note This machine adopts pneumatic accelerator pump is a new transport machinery, the use of pressurized air as power source for all kinds of corrosive liquid, with particles of liquid, high viscosity, volatile, flammable, poisonous The liquid can be pumped exhaust. The main features of this pump is no irrigation water, pumping both liquid flow, but delivery is free-flowing medium, high suction lift, lift adjustable (0-50 meters) air supply pressure as long as more than 1kg / cm2 That can work, absolutely fire and explosion. Removing non-pressure gas line and conveying line. When sprayed concrete during operation, if the nozzle at the sudden lack of material ejected, then generally there will be two things happens: when one is going to take place in the plugging. Then conveying line while not being blocked, but conveying line conveying internal situation deteriorated, then we should close the vibrator, and other conveying line in the mix ejected, pressure in the pipeline to resume the normal operating range on again. Second, plugging occurs, conveying line has been blocked, then should turn off the machine, and then began to clean up the conveying line (Note: Before you open a cyclone or make conveying pipe line pressure drop restore normal operation to 0), no fault in confirming the pipeline, re-start the machine according to the boot procedures. B. sprayed concrete when conducting operations feeding hopper should try to maintain continuity, so that stable ejection performance. C. In use, the longer prevent large objects such as steel ﹑ materials such as iron debris into the rotor chamber, in order to prevent accidents caused by destruction machine. Machine is running in. Do not use sticks to clean material chamber, so as to avoid severe damage aircraft accidents. D. reduction systems around the vent must be kept clean to prevent blockage caused by channeling the main motor oil and burning motor. E. Never use water wash the electronic control box and the main motor when cleaning the machine, so as to avoid short circuit and affect the normal operation of the machine. F. for coal mine production and use, the high pressure hose by the user to purchase, the connection chain and cables must choose products with safety standard qualification. Consumable parts list Code Name Number of single specifications Quantity PC2038-15 O-ring Φ80 × 5.3 reducer output shaft 1 PC2089-03 O-ring Φ75 × 3.55 nozzle 2 PC2028-11 O-ring Φ25 × 2.65 The clamping mechanism 4 PC2102 shaker wire springs hopper 3 PC2028-05 rubber spring-loaded mechanism 4 PC2007 sealing plate rotor assembly 1 PC2003 lower sealing plate rotor assembly 1 PC2016 plastic material cavity lining rotor rotor rotor assembly 10 PC2014 total 2 PC2008 into the apron Φ90 × 3.55 rotor assembly 1 PC2002 lower apron Φ90 × 3.55 rotor assembly 1 Troubleshooting Fault Status Possible Cause Remedy Motor does not operate power phase or overload; switch fuses, contacts, isolation knife gates and other electrical fault electrician or buttons, one by one excluded (see: Figure 7) Main motor coil burnt inspection, maintenance reducer seal has been broken, dirt into the gear blocked, the load is too large. Cleanup deterioration in the ring reducer oil change, loss of lubrication, causing overload. Cleanup gearbox oil change overload pressing mechanism regulating pressure, the motor rotates, the rotor does not turn the gear damage inspection, replace the rotor axis square hole damaged Replace a rotor does not rotate in the direction shown by the arrow wrong power supply phase phasing seal leakage between the plate and rotor unbalance pressing means pressing structural adjustment seal plate wear, steel dowels projecting grinding or replaced with new board (see: Maintenance) port plug more than cleaning up the air over the conveying air intake pipe blockage, causing the system increased pressure to clean up plugging troubleshooting rotor liner abrasion, deformation or fracture examination rotor lining, Ruoyi grooves, reground or replaced with a new board, if necessary (see: Maintenance) material chamber assembly defect reassembly material cavity partially or completely blocked, resulting in reduced flow area of ??the rotor chamber to clean material, cyclone or conveying tube blockage of aggregate size too large conveying tube blockage, stop turning the machine, close the pneumatic valve. Remove conveying pipe from the cyclone, pneumatic valve open, keep the rotor material blown out, and then check the conveying pipe, clogging the site with a wooden stick percussion, vibration or loose plugs emptied (Note: To lose before you open the cyclone feed tube or pipe pressure drops to 0). Finally, the conveying pipe and then received the cyclone, with a pneumatic blow. If the transport distance is over 40m, 20m should deal with each segment of the pipeline. Aggregate sieved. Transporting gas pressure is too low to stop the motor and gas, if the rotor blockage should move away hopper base, open rotor, rotor material cavity clean up with a brush. Improve airflow pressure. System pressure is too low or too thin tube to improve system pressure, increasing the trachea through the radial gas line or gas line is not turned down under after cleaning, open the valve the mix of excessive moisture, spices uneven adjustment spices meet the requirements machine capacity is reduced because the material is bonded or sleeve wear caused by cyclone blockage and clean or replace the cone nesting cavities for a long time without cleaning clogged Clean or replace material cavity due to the bonding material to make material chamber clogged Clean or replace material cavity vibrators Maintenance is not running the vibrator over the air inlet blockage, materials from spill clean up residual gas vent port conveying pipe vibration powerful pneumatic valve installed wrong or pipeline leak caused by too much pressure drop, low air pressure check and make corrections because the material bonding and clogging rotor material cavity or passage of the cyclone See reduce airflow blockage part of the main gas line area is not enough to change the diameter of the main gas line to reach the required standard machine vibration spring wear, resulting in reduced height hopper, vent gap adjustment or replacement of inadequate mixing vibration spring expected slump inappropriate, spices uneven adjustment meet the requirements spices start to block airflow pressure delivery valves to adjust the amount of gas pressure too low Check the slurry viscosity is too uneven to adjust the ratio of spices mixed with water stream Debu full water pressure is too low Check the water pressure (nozzle at least 0.3MPa) water loop inlet orifice nozzle check nozzle clogging and clean, if necessary fashion Sheung Shui filter dust at the nozzle too much water was added to increase the amount of water nozzle outlet nozzle drops Pulp add too much water to reduce the amount of water sprinklers rebound is too large (greater than 15% spray wall spray top is greater than 20% -30%), inadequate screening examination material grading curve, sprinkler adjustment when necessary to spray from the spray by plane Spray too increased to 0.8m from the jet direction and that is not correct spray jet angle perpendicular to the surface by the spray nozzle from the surface of the standoff distance is too far reduced to about 1m Company Profile Shandong Jia letter Machinery Co., Ltd. is a leading industrial and mining enterprises provide professional equipment and technical advice business. The company serves the mining, railway, construction and other industrial and mining enterprises, providing customers with reliable quality and stable performance of professional equipment. Since its inception has been in good faith and sincere service principle, we strive to provide customers with reliable, used to live, safe and reliable products. With the development, Shandong Jia letter Machinery Co., Ltd. prepared on the basis of existing products and innovate, to explore new equipment to meet modern technology, for customers to further provide more portable and more efficient, more energy-efficient new era of products. Shandong Jia letter Machinery Co., Ltd. is located in the hometown of Confucius and Mencius, Canal Capital, located in southwest Shandong Province, Shandong, Jiangsu, Henan and Anhui junction of four provinces, connecting the East China and North China, Central China and an important transportation hub along the coast, Mineral Resources rich, it has been found and proven reserves of 70 kinds of minerals. It is a national large-scale coal chemical industry base, national coal energy base, the national engineering machinery industry base. Shandong Jia letter Machinery Co., Ltd. since its establishment in the quality first, the integrity of the first principles of the branches with a number of coal mining enterprises, railways Group has established good cooperative relations, the company's main mine sensors, mine explosion-proof lighting switch, Mine comprehensive protection, railway maintenance with a drilling machine, cutting machine, grinding machine, tamping machine and other equipment, sincerely welcome all customers to our advice, to buy products. Main products: steel bending round machine, terrazzo, electric waxing machines, electric ground trowel, internal combustion ground trowel, concrete coring rigs, steel hoop bending machine, steel cutting machine, steel straightening machine, steel transfer straight cutting machine, steel bending machine, steel bending round, electric rammer, gasoline rammer, road cutter, gasoline cutting sewing machine, cleaning machine, rolling machine, breaststroke ramming machine, electric plate compactor, internal combustion plate compactor, wood garden saw, explosion spraying machine, pipe drilling machine, wet spraying machine multifunction rolling bending machine bending machine multifunction rolling bending machine 50 63 multifunction rolling bending machine rolling bend the machine square tube tube bending machine multifunction wet wet spraying machine shotcrete machine shotcrete machine wet concrete jet jet wet wet spraying machine spraying machine manufacturers price 
Contact Detail
Company Name: Shandong Jia letter Machinery Co., Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Ms Chu(Sales Staff)
Telephone Number: 0537-2200239 0537-2236836
Company Address: Jining City Industry and Commerce Administration Bureau, Jining City, Shandong Province, China
Zip/Postal Code: 272000
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450