Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Quality zip630 electric basket of manufacturers preferred Shandong Hauck

Quality zip630 electric basket of manufacturers preferred Shandong Hauck
Quality zip630 electric basket of manufacturers preferred Shandong Hauck
Quality zip630 electric basket of manufacturers preferred Shandong Hauck

Larger photo of automa dispenser

Company:Hauck Shandong Machinery Co., Ltd.
Information Name: Quality zip630 electric basket of manufacturers preferred Shandong Hauck
Update Time:2015-04-29
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
1, the suspension mechanism of attaching an agency attached to the top surface of the building. Zero, components and wire rope lifting the suspension mechanism to the top after the plan marked position for installation. Installation sequence as follows: Installation and adjustment: ① choose to install ground level, when the event slope, in casters below flat with wooden cushions, front, rear wheels with wedge wedge fixed. The mounting surface is waterproof insulation, front and back seat padded 5 cm thick planks, to prevent crushing waterproof insulation levels. ② adjustable suspension seat height adjustment bracket at the front side of the beam just above the parapet (or other obstacles) height, where possible, the rear suspension mechanism is positioned at the front end of the lower side of the beam projecting parapet padded wood block between fixed. ③ beam projecting end of the front overhang length of 1.3-1.5 meters. Before ④, the distance between the rear seat space allows the case, try to adjust to the maximum distance. ⑤ adjust the distance between the two brackets to the front overhang beam suspension platform than the distance between the endpoints small 3-5 cm length. ⑥ strengthen the rope when the tension so that the front beam slightly upturned 3-5 cm, producing prestressed improve front beam stiffness. When ⑦ clamping wire rope, rope clip number is 3, U-shaped opening at the end of the rope opposite side, and in the same direction. Hoisting rope clips should be clamped at the point in this order, and finally a rope clips and before a rope between folders, making the rope a little arch. ⑧ put down the rope when the rope free tray on the floor, after the rope carefully drawn slowly along the wall to put the decline. After the release of the rope entangled rope should be separated carefully pressed, extra ground wire rope tightly enclosed disc carefully. After hanging bracket ⑨ positioning the front, rear castors with bolt fixing. ⑩ weights 25 kg each, will be balanced with weights placed in the back seat of the four sets of weights installed rod. With weights based on the number of front beam overhang, distance between the front and rear seats and suspended load calculated as determined (see below) counterweight number: X≥a (w1 + w2) /12.5b formula: a - - front beam overhang length (mm) b --- before, the distance between the rear seat (mm) w1 --- suspension platform total mass, including the suspension platform, hoist, safety locks, electrical box, hammer, quality of wire rope and cable and 1/2 (kg) w2 --- maximum working load (kg) 2, installation sequence suspended platform suspended platform installation: install suspended platform adjustment ① choose a flat floor make mounting face ② The basic sections butt joint alignment after tightening the entire platform frame straight. ③ enhance both ends of the rack installation so that the safety lock bracket toward the outside internet. ④ pretend evenly tightening all the bolts. ⑤ Aluminum transferring platform with special square washers. 3, safety locks and safety lock installed hoist and hoist are installed at both ends of the platform suspended hoist mounting bracket safety latch bracket and hoists supporting the platform toward the inside of the wheel so that the swing arm when the safety lock installed. Hoist installed in the suspension platform to hoist transported to the suspension platform installation, the lift on the back of the machine frame aligned rectangular recessed hoist support, insert the pin and locked with a lock pin, lift the chassis at the upper end with two bolts fixed to the elevator hoist mounting bracket on the horizontal frame. It can also power after the outer suspension platform will work within the hoist rope penetration, and rising jog button to hoist hanging in suspension within the platform installation. After using a method installation shall hoist the rope mouth safe cushion empty and exposed the rope when the rope mouth Carefully hand rope leads, prevent the rope head strike the ground and damaged. 4, electrical box mounting electrical boxes installed in the middle of the rear suspension platform (high) column piece, electric door toward the inside of the platform suspension, with two hanging climb the electrical box on a fixed piece of railing fence. After the electrical box mounting, power cable, electrical cables, control switch cable connector plug into the appropriate socket in the bottom of the electrical box. 5, electricity, check before energizing check ① three-pronged grounded power supply, power cable connected to the source of reliable fixed. ② suspension mechanism placed top surface smooth, fixed and reliable, no loose bolts, counterweight block installation reliable. Stopper fixture ③ rope connections are correct, tighten the nut and reliable. ④ hang the rope should be separated, no twisted, winding and bending. ⑤ hoist, safety locks and suspension platform is properly installed, reliable connection, no loose bolts or imaginary tight connection member without distortion or cracking. ⑥ cable connector plug correctly without loosening, the insurance lock and reliable locking. ⑦ cable construction facade no projections or other obstacles. After power inspection and requirements: ① closed electrical switch box, electrical system power. ② will switch into the left position, respectively, to move the electrical box door and handle switch rise and fall buttons, left hoist machine reverse running. ③ the switch placed in the right position, respectively, to move the electrical box door and handle switch rise and fall buttons and right hoist machine reverse running. ④ the switch in the middle position, respectively, to move the electrical box door and handle switch rise and fall buttons, left and right hoist machine at the same pros and cons of running. ⑤ the switch in the middle position, after starting around hoist machine, press the power button on the door emergency stop (red), the motor stops. Turn the emergency stop button to reset it, you can continue to boot. ⑥ the switch in the middle position, after starting around hoist machine, each limit switch contacts are pressed, the alarm bell, while the motor stops. After the release contacts can continue to boot. 6, wearing rope rope wear work: in the front suspension mechanism two ends of the rope the beam position inside the rope work, penetrates inside the elevator. After the rope lifted slightly ① after the end of the rope through the rollers penetrate security lock slot on the arm, inserted into the upper end of the hoist rope mouth, to not get into force when inserted under that rope seated in the elevator. ② rotation switch and press the corresponding button on the rise, so that the rope smoothly through the automatic winding to hoist the drive plate. ③ The piercing wire rope hoist bracket through the bottom of the guide pulley will lead into the outside of the wire rope suspension platform. ④ ends were wearing rope to hoist wire rope taut immediately stopped, and then convert the switch to the middle position, jogging rise button and pull the ends of the poor hanging platform to smoothly under its own weight in a suspended state When suspended platform off the ground to prevent collision with the wall or other objects. Stop platform to be suspended off the ground about 20 to 30 cm rise, and check whether the suspension platform is level, if inclined, you can go to the lower end position switch and jog rise button to lower the suspension platform promotion until the end in a horizontal position. 7, two wire rope safety rope through the front suspension mechanism is located outside the beam ends is safe rope, penetrate a safe lock. Wear rope, wire rope penetration into the rope end into the safety lock side of the mouth, hand forward, after the free passage of safety locks, security locks from the bottom of the rope outlet will rope out until the rope taut. 8, hammer installation hammer is fixed to the lower end of the rope taut and stable rope, suspended platform to prevent the hoist when the rope pulled along and affect the normal operation of suspended platforms. When installed, the two semi-holder at the lower end of the rope off the ground about 5-6 cm, and then bolted to the rope. 9, acceptance, transfer the installation is complete, the organization concerned for acceptance inspection, and fill out the "electric basket installation and acceptance form", it is put into use after being signed by the relevant personnel. 10, install safety rope safety rope and climb on the roof Shengka of hanging points must be strong, must be safe climbing rope to hang suspended above the agency, after the top of the safety rope hanging basket placed in the middle, since the lock is mounted directly In the safety rope above. 11, electric basket disassembly: 1, before the demolition of the basket conduct a comprehensive inspection, document the damage; 2, Step demolished; A. The platform parked on a level ground, remove the rope falling iron; B. power off ; C. the cable from the temporary power distribution box and hanging baskets removed, and rolled into a disc; D. Remove the wire rope is pulled upward and rolled into a disc fastened; E. roof last unloading suspension and do Good protection. 
Contact Detail
Company Name: Hauck Shandong Machinery Co., Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Kuan(Sales)
Telephone Number: 0534-5212839 0534-18263050417
Company Address: Gaotang Economic Development Zone in Shandong Province and remitted to the government channel Xin Road intersection Road South, , Shandong Province, China
Zip/Postal Code: 253408
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450