Sand gold mining beneficiation process, dry process with gold equipment
Sand gold mining beneficiation process, dry process with gold equipment
Sand mining gold mine wonder on what kinds of devices to choose from, but from the production to make a reasonable allocation of operating these devices it is, indeed, should give Qingzhou Lu Hao mechanical point of a praise. We have first-class technical engineers, field exploration and decades of experience in the operation of heavy metal recovery have perfect confidence in the technical support, our election processes metal equipment perfectly simple, systematic, and have an overall effect of the uniform. Dryland with gold equipment process: from loader to the hopper feed - pass through the material of the conveyor belt rolling screen - after the screening of coarse material to drain - fines into the rotation Cheng selected heavy mineral gold carpet - selected heavy minerals and gold machine selection the hair of gold. The mechanical load on the chassis, can drag a short distance loaders, near the face, reduce fuel waste caused due Face away. Device parameters 1, the feed hopper for 50 loader feeding, the feed hopper using 5 mm steel plate, feed hopper support frame using 12 # channel, strut with 6 # angle, the feed hopper plus a widened plate, additional equipment width, size of 2.1 m * 2.4 m. 2, feeding belt conveyor captain six meters, 0.8 meters wide, using 10 # channel steel manufacturing, power motors equipped with 5.5 kilowatts, 350 reducer. 3, rolling screen is no axis sieve size 2.5 * 1.2 m, mesh size of 25 mm, using the * 16 # 18 # manganese steel bar welding, rolling screen support frame using 12 # channel steel manufacturing, power equipped with 5.5 kilowatts motor , 350 reducer. 4, gold peristaltic leavened leavened slot groove, specifications for the 6 meters long, one meter wide, leavened tank shop Mitsubishi Cheng gold blanket, pressed metal grate on Cheng gold carpet, equipped with four kilowatts power speed motor, speed reducer 250. 5, gold machine specification is 0.6 meters in diameter and 1.2 meters high, equipped with four kilowatts motor power. 6, cobblestone use leavened leavened groove out, leavened tank made of 5 mm steel plate. 7. The pump is equipped with two sets of 5.5 kilowatts pumps, water 20 meters. 8, with a standard distribution box and distribution box following power cord. 9, the device used for the GB steel steel, load-bearing parts of the entire reinforcement. 10, the device as a whole for the three, equipped with a removable base, base with 16 # channel steel welding * 3 mm steel plate, can be moved at any time. http://www.lscaijin.com
Contact Detail
Company Name: | Qingzhou Lu Hao sand mining machinery parts factory |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Li(General Manager of Administration Department) |
Telephone Number: | 0536-3831322 0536-3831321 |
Company Address: | Qingzhou Yellow House Street Industrial Park, , Shandong Province, China |
Zip/Postal Code: | 262518 |
Find More Related Products
- Dry magnetic separation equ..
- Beneficiation centrifuges, ..
- Zhengzhou POS machine agent..
- Thirty-nine Princess Kampo ..
- The most commonly used gold..
- Indonesia's large-scale all..
- POS machine how to handle Z..
- Shaoxing to Datong logistic..
- Centrifuges, centrifuge tai..
- Easy-to-gold machine, desig..
- Tailings re-election equipm..
- Cameroon star gold mining e..
- Shakin dressing type enrich..
- Xinjiang gold equipment, sh..
- Ancient cold through agents..
- Jinan intelligent home cont..
- Chongqing hardened cement f..
- Mobile devices truth back w..
- Rock gold tailings recovery..
- Slag separator iron slag el..
- Ding labor supply magnetic ..