CFG28 long auger Sanli Machinery
CFG28 long auger Sanli Machinery
|
Yesterday, the provincial capital of Zhengzhou went CFG28 send a drilling rig, the client is the third purchase of Henan Sanli long auger, the first is CFG26, the second and third sets are CFG28, because construction requirements stake in Zhengzhou 60% of all machine customers choose CFG28 rig. Near the shipment, the customer suddenly asked the general drill 28 meters ∮400 changed eight holes of spline drill pipe, drill pipe so easy to install, and more secure than ordinary drill. In the case of time-critical shipments, sales delivery be revised notice, overtime, the entire drill pipe, drill pipe flange connection, light rod, drill all over again do according to customer requirements. In order not to affect the customer pile into the site, the first day we put the host loading, rigorous checks, the main tower, power head, winch, casing, hoses, side boots, shoe boots, with heavy, electrical cabinets and other eleven loading, all the drilling completed in accordance with customer requirements, the next day sent to Zhengzhou loading site, customers get the praise at the speed of delivery and meet customer needs. Urgent customer needs, what customers think, are three of the requirements for every employee of the company, three of the company is our consistent service standards. Drilling diameter (MM) 600 drilling depth (M) 28 power head power (kW) 2 × 55 maximum torque (kN.m) 35.3 drill speed (r / min) 24.2 Allowable corkscrew force (Kn) 300 work Ground maximum gradient (°) 2 column tilt range (°) 2 Ground pressure (Mpa) 0.03-0.25 walk way walking type step (M) 1.5 Walking speed (M / min) 3.37,2.26 swing speed (M / min) 0-0.59 rotation angle (°) 360 + trailer transportation in the form of the disintegration of parts turning radius (M) 12 speed (km / h) 15 Overall dimensions m × m × m working condition 12 × 5 × 30 transport state 10.5 × 3 × 3.1 Total Weight (T) 43
Contact Detail
Company Name: | Three of Henan Machinery Manufacturing Co. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Li() |
Telephone Number: | 0371-64948877 |
Company Address: | Zhengzhou, Zhengzhou City, Henan Province, China |
Zip/Postal Code: |
Find More Related Products
- Long auger piling CFG23 Hen..
- Trenchless pipe parallel to..
- DT4 environmental electrica..
- Digging Pile rig, drilling ..
- Dug pile drilling rig, engi..
- Chongqing project water dri..
- Geomembrane Geomembrane Bag..
- Geomembrane bags use, Ediso..
- 630 stainless steel prices ..
- Gasoline Highway drilling m..
- Engineering drilling machin..
- Three-phase project water r..
- Drill mill project
- Reinforced concrete drill, ..
- Ancient Han Tong effects ho..
- Kunming Larsen steel sheet ..
- Vertical three-phase projec..
- Water Driller tube rig dril..
- Vertical drilling rig, cons..
- Diamond blades, diamond dri..
- Three-phase construction pr..