Home
Products
Boiler factory - Boiler price - fired boiler - Taikang Boiler - Steam Hot Water Boiler
Boiler factory - Boiler price - fired boiler - Taikang Boiler - Steam Hot Water Boiler
Boiler factory - Boiler price - fired boiler - Taikang Boiler - Steam Hot Water Boiler
Vertical environmentally friendly coal-fired steam boiler using the most advanced combustion technology, fuel from the stoker grate oral administration in the combustion, and then into gas. Flue gas into the furnace after converting the upper chamber, high-temperature flame generated by the automatic ignition system for heating surface radiation, convection heat transfer, fine carbon black and dust contained in the flue gas, is a multi-layer tubes cutting rotation, again After combustion flue gas purification, through the chimney into the atmosphere. Boiler Features (1), compact, easy to install migration, small footprint, infrastructure investment. (2), the flue gas by forced convection rotary erosion control, and make full use of the heating surface, improve boiler efficiency. (3), since the flue gas return multiple multi-cycle, the furnace dust fully meet the purpose. (4) Cleaner water seal to prevent the spread of dust, is a new green products. Factory profiles 1, boiler host; 2, chimney; 3, valve instrument (see Parts List); 4, technical documents; provision users with the furnace factory technical documents. Stoker with different types of boiler slag its different coal consumption, heat can be used to determine the size and load requirements coaling interval must be a grain of coal into the furnace of coal, grain size 15-65 mm size uniform, dust content of no more than 5% according to the number of coal consumption, determine the dregs of time, frequency and the amount of slag. General requirements for the ground to see the fire, ground adjustments view of the fire through holes in the combustion chamber fire color observed combustion conditions, adjust the primary and secondary air volume the size of the size of the secondary air into the combustion gas is particularly important. When you hear the whirring sound of the combustion gas becomes small, may be burning is not busy, then turn off the fan, then pulled the handle moving grate, flipping back and forth several times of about, if pulled relaxed feel, the grate surface may have slagging, empty shed phenomenon, then open the next door carried the flames, the slag layer thickness of not less than 200 mm, when the slag if unburned fire should stop falling slag, slag door shut tight open the door were coaling, first before the ignition of coal stoker grate stoke, and then turn the blower fully open once the throttle for 2-3 minutes, quickly close the throttle, open coaling port 2-3 minutes after the plus coal. Close the fan and open coaling port is continuous motion, the middle can not delay, delay closing the damper open for some time before coaling port, may cause gas deflagration danger. When you open coaling port, the operator must be in the open side of the coaling ports, coaling ports open, it should open sunroof, avoid gas leak danger for the operator. Coaling After closing the door, tightly sealed. Each additional coal should be closed once adjusted throttle, five minutes and then turn off the blower, the purpose is to allow the secondary air to the furnace fire halls unburned residual gas burned off and blow open the door after about ten minutes and so on, especially Note: The operator must not stand in the door when you open the door directly in front of or near the oven door to watch people try to avoid the view of the front face of the fire hole to prevent wounding flame spray. Coaling After closing the door, turn on the blower let coal Ranran slow. When there is pressure in the boiler, open steam valve to the lower part of the grate deputy supplying steam valve opening should not be too large to furnace and coke suitable halls, the valve in the boiler always runs normally open. The blower inlet opening to 50%, half an hour after the operation, the blower inlet fully open, the boiler into normal operation. Electronic ignition device of the self-start ignition blower work automatically after normal combustion ignition gas furnace hall automatically stop working; such as combustion fire is out, the automatic control system alarm, the reason should be checked at this time fireman, the normal operation of the furnace ; fireman should always check the test automatic ignition system; to prevent malfunction occurs blasting furnace hall (explosions) phenomenon (remember to do "fire and other gas" instead of "gas and other fire"). ...... Environmental superheated steam boiler designed specifically for the wine industry, sterilization and other heating bath is the new smoke-free environment free inspection and other advantages of fast heating ... Henan only one interested please contact sales call.....: 13683948870 "Liu"
Contact Detail
Company Name: | Zhoukou lofty Tai Hong Boiler Co. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Liu Forest(Sales) |
Telephone Number: | 0394-6777028 |
Company Address: | Zhoukou lofty Tai Hong Boiler Co., Zhoukou City, Henan Province, China |
Zip/Postal Code: | 414600 |
Find More Related Products
- Environmental fired hot wat..
- Dongguan Bureau Ju VT-003T ..
- Boiler factory - gas boiler..
- Dongguan Bureau Ju VT-1M si..
- High frequency furnace
- Heat treatment equipment, i..
- Simao City, aerated concret..
- Piggery heating boiler
- The new barn dedicated boil..
- Pig heating equipment
- Supply of die-cast aluminum..
- Aluminum smelting furnace c..
- Supply of energy-saving alu..
- Factory outlets aluminum me..
- Bush sintering furnace
- 8 m of gas supply trolley f..
- Bright Bell-type gas furnace
- Supply of high-temperature ..
- Bonte gas supply heat treat..
- Supply aluminum melting fur..