Home
Products
Star Flood Control Dike flood control product quality, the lowest price the best flood control swelling bags Specification
Star Flood Control Dike flood control product quality, the lowest price the best flood control swelling bags Specification
Star Flood Control Dike flood control product quality, the lowest price the best flood control swelling bags Specification
Star Flood Control Dike flood control product, the lowest price, best quality bags swelling flood control flood control product specifications Star Flood Control Dike the lowest price, best quality bags swelling flood control flood control product specifications Star Flood Control Dike the lowest price, best quality flood control swelling bags Specification [Abstract ] 19 am, in a continuous invasion of torrential rain, Heilongjiang province of diffuse dike danger Tongjiang City Lotus River levees, the resident of a reserve artillery regiment, the Corps of Engineers, more than 600 soldiers dispatched emergency, compose a song to defend the Lotus River embankment of the heroic battle song. At this point, muddy levees, vehicles can not pass, the soldiers can piggyback to borrow area 2.6 km away by shoulder, relying on artificial reinforcement Dangerous. August 19 Xinhua Harbin Electric (Lee help macros, horse ream) 19 am, in a continuous invasion of torrential rain, Heilongjiang province of diffuse dike danger Tongjiang City Lotus River levees, the resident of a reserve artillery regiment, the Corps of Engineers, etc. More than 600 officers and soldiers dispatched emergency, composed a heroic defense of Lotus River Levee battle song. Lotus River is located in Heilongjiang Province, 45 kilometers east of the river with the city Department, Heilongjiang formed here a long 4.9 km of the "U" shaped channel. 19 am, this series of four levee embankment appear diffuse, once burst consequences would be disastrous. 4 pm, according to local flood control headquarters command, a reserve artillery regiment, the Corps of Engineers and other emergency rescue into battle. At this point, muddy levees, vehicles can not pass, the soldiers can piggyback to borrow area 2.6 km away by shoulder, relying on artificial reinforcement Dangerous. "People in the levee in, not to flood into the same river!" Slogan loudly, wearing a life jacket 600 Yu Yongshi merged into a serpentine queue of orange-red. The clouded morning, the more rain the greater the more muddy road, rescue teams from time to time was slipping, and fast climbs. One is difficult to distinguish from each other "Clay" among the heads of the first charge of a reserve artillery regiment Yan Jijun kept shouting "Comrades, on me!" Although voice hoarse, power has not diminished. 8 am, a reserve Corps of Engineers and local Hoche assault boats fishing village 120 into battle, by ship loading sandbags, so much faster embankment. From 4:00 to 11:00, and build on Lotus River levee flood control four total length of 1.5 km Dike, blocking the diffuse embankment. Acceptance of the new mandate to continue strengthening levee officers and men, just chew a mouthful of mineral water rations right again into battle. In the flood of deputy chief of staff to direct military 刘凤奇 Heilongjiang Province, he said: "rain has not stopped, we will continue to fight Lotus River embankment reinforcement, to ensure safety of life and property with Jiang Renmin five-star production of environmentally Dike as a new on-site assembly. type retaining Dike, better overcome the traditional lack of Dike, usually as a national, river basin or provincial sentinel warehouse rescue equipment reserves, may also be equipped in 19 flood rescue teams of special forces and maneuvering? Five Star Production Dike environmental protection as a new field assembled retaining Dike, better overcome the traditional lack of Dike, usually as a national, river basin or provincial sentinel warehouse rescue equipment reserves, it may also be equipped with special flood in 19 troops and motorized Dike flood rescue teams quick and easy installation, before the flood after combat-related drills can be very good collaboration, so as to achieve the purpose of flood control flood Dike application requirements: ????? dike top width , requires the mother board dam crest wider than 6 meters, according to the "dike design specifications" 6.4 dike embankment dike embankment structure 6.4.1 width of not less than required to meet the anti-8m, two levee not less than 6m. Installation and Operating temperature to at 5-450C. Fabricated plate Dam Flood Control Dike Hebei Five Star Electric Equipment Co., Ltd. in the installation and operation of the device can not receive the blade thorn draw, hitting not place heavy objects on the Dike. ???? ? If used in accordance with the relevant provisions of the operation, the service life can be extended Flood Control Dike assembled board Dam Flood Control Dike mainly consists of six parts:! (1) pod: aluminum extrusions connected by a shaft made As the dam support frame (2) beams: coupling made of aluminum alloy material with special connector from the square, as the dam connecting strut (3) retaining panel: Using corrugated fiberglass material through a special fixture and beams connected boards Dam Flood Control Dike assembly consists of six components: (1) pod: aluminum extrusions connected by a shaft made of, as the dam of the support frame (2) Beam: Square made of aluminum alloy material and special connector connection is made, as the dam connecting strut (3) retaining panel: Using corrugated fiberglass materials for fixtures and integrally connected to the crossbar by its role: first as the connector adjacent angle frame connected together to form the dam bearing carrier; the second is as a rigid plate (4) rubber elastomer: from high quality rubber has elastic function is made for the support plate hermetic seal between adjacent (5) is positioned. anchor. made by a round-pressure. ????? assembled board, also known as the flood control dam flood control Dike Dike is quoted in CFRD hydraulic principle, multiple-pod, beams and linked to form a retaining panel Dike rigid dam, retaining panel facing dam retaining the role played during the construction of the buried soil levee foundation plays the role of anti-seepage around Hebei Five Star flood control related products: Hebei Five Star swelling Bag: flood control and flood expandable bag expandable bag for flood control Plugging expandable bag bag manufacturers swelling flood control sandbags for flood control flood control plant pile hammers Flood Control Flood Control Dike Dike Dike flood control flood control sandbag assembled assembled Flood Control Dike embankment eco bags eco bags folding shovel folding shovel flood emergency package, flood control combination Tools: Emergency lights at night portable emergency lamp night light proof light portable flood emergency lights lifejacket lifebuoy rescue boat assault boat rescue pump flood control pump flood control and drought relief tents New Product: Flood Control and Drought Flood Control and Drought Relief supplies specialized equipment manufacturer details contact: 13373211997 Zhang Rong new buttoned: 2280971820 Hebei Five Star Electric Equipment Co. http://www.xishuipengzhangdai.com/
Contact Detail
Company Name: | Hebei Five-Star insulation pads Ltd. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Hu Ruonan() |
Telephone Number: | 0311-80815247 |
Company Address: | Shijiazhuang, Shijiazhuang City, Hebei Province, China |
Zip/Postal Code: |
Find More Related Products
- ZT260 highway guardrail ful..
- Small plant pile hammers fl..
- Heilongjiang construction f..
- CO2 Laser Marking Machine
- ※ functioning as lifesavin..
- A small flood control speci..
- Fence construction procurem..
- Henan prospecting aluminum ..
- Ninghe wear matching pieces..
- Fenghua wear matching piece..
- Triangle impact roller
- The new hammer crusher equi..
- Flood Control and special h..
- Lease sale 210 Huashan Road..
- Girls can use it breast enh..
- Mountain King crushing equi..
- Yuyao wear matching pieces ..
- Taizhou wear matching piece..
- Foshan wear matching pieces..
- Guangdong dental plate to j..
- Construction Machinery Leas..