Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Shandong large transport major pieces of transport reconnection

Shandong large transport major pieces of transport reconnection
Shandong large transport major pieces of transport reconnection
Shandong large transport major pieces of transport reconnection

Larger photo of automa dispenser

Company:Shandong reconnection lifting and installation works Lt..
Information Name: Shandong large transport major pieces of transport reconnection
Update Time:2015-04-29
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
Project Overview The project is located in Anning grass Town, the Wuhan Iron and Steel (Group) Co., Ltd. to invest in Kunming Iron and Steel, WISDRI Engineering Technology Co., Wuhan Xingyu Management Company Limited Design Engineering Construction Supervision. Local deep excavation depth of about 5-6m, construction pit threats to security, deep excavation construction safety is the top priority of construction, how to ensure security is the focus of deep construction pit construction. . Frame shear wall structure, caps infrastructure, building structural safety rating of 2, fire resistance rating of two. According to the detailed survey report and on the basis of "geotechnical engineering specifications" (GB50021-2001) (2009 Edition) Table 12.2.1 - 12.2.4 Evaluation of the evaluation criteria, the field of groundwater to the concrete structure with weak corrosive to steel The reinforced concrete structure micro corrosion. Second, hydrogeological conditions and their impact on the excavation: the site each rock plain fill ○ 1 absorb water; silt clay (Q4d1) ○ 2, ○ 3 strongly weathered sandy mudstone permeability; the weathered sandy shale (S) ○ 4, weathered siltstone ○ 5 permeability weak; underground water in rock fractures, mainly occurs in weathered rock, groundwater recharge mainly precipitation, according to the Geological Survey report groundwater stable water depth in easily excreted after 8.6-11.7 meters (equivalent elevation -8.1-11.3 meters) of water in general, according to local experience, rock crevice water to take appropriate drainage measures. According to the survey visit folk do not send residents know about the history of the highest level (relative elevation -6.0 m) 
Contact Detail
Company Name: Shandong reconnection lifting and installation works Lt..
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Wang Lei()
Telephone Number: 0531-890528888
Company Address: Jinan, Jinan City, Shandong Province, China
Zip/Postal Code:
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450