Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Materials Handling handling porter _ _ Shandong reconnection

Materials Handling handling porter _ _ Shandong reconnection
Materials Handling handling porter _ _ Shandong reconnection
Materials Handling handling porter _ _ Shandong reconnection

Larger photo of automa dispenser

Company:Shandong reconnection lifting and installation works Lt..
Information Name: Materials Handling handling porter _ _ Shandong reconnection
Update Time:2015-04-29
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
5.3 Deep Foundation waterproofing and drainage and precipitation scheme of deep foundation earth in order to ensure the safety of the excavation process, the need to take full account of the deep pit drainage, deep Foundation Pit Dewatering through always. After deep excavation to the bottom, 20 ~ 30m provided with a water pit, a small amount of groundwater flow together in the water pit (water pit is set to 2m * 2m * 1m, when the excavation pit in the middle of the corners and every Surrounded by walls punched channel support, with mortar surface), then the pump discharge deep pit outside. Sixth, heavy construction, difficulties and risk source analysis (1) Construction of precipitation: Well pit and tunnel precipitation for deep excavation and tunneling to provide "water" operating conditions is a major difficulty of the project, but also heavy engineering in priority. Section prepared on the basis of a preparation according to prepared on the basis of the construction program are: 1, "detailed geotechnical engineering investigation report," the Guangxi-based engineering survey Engineering Co., Ltd. 2, Urban and Rural Planning and Design Institute of this project related to construction, structure construction plans. 3, "engineering survey" GB50026-2007 4, "Building Ground Treatment Technical Specifications" JGJ79-2002 5, "Construction Quality Acceptance unified standard" GB50300-2001 6, "Building Foundation Engineering Quality Acceptance" GB50202-2002 7. "building excavation Technical specification" JGJ120-99 8, "bolt shotcrete support technical specifications" GB50086-2001 9, "site temporary electrical safety specifications" JGJ46-2005 
Contact Detail
Company Name: Shandong reconnection lifting and installation works Lt..
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Wang Lei()
Telephone Number: 0531-890528888
Company Address: Jinan, Jinan City, Shandong Province, China
Zip/Postal Code:
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450