Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Equipment relocation Shandong reconnection Fig heavy equipment relocation

Equipment relocation Shandong reconnection Fig heavy equipment relocation
Equipment relocation Shandong reconnection Fig heavy equipment relocation
Equipment relocation Shandong reconnection Fig heavy equipment relocation

Larger photo of automa dispenser

Company:Shandong reconnection lifting and installation works Lt..
Information Name: Equipment relocation Shandong reconnection Fig heavy equipment relocation
Update Time:2015-04-29
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
3) the establishment and improvement of insurance period, investment, labor, materials for dynamic optimization of the main indicators, each step will be scientifically controlled, so that all aspects of the project, among the aspects under control. 4) Make sure that the duration of the specific organization and technical measures (1) deployed in over metro construction construction technicians, workers, with a good construction team; (2) establish and improve construction site organization and command system and external coordination system, so efficient, strain strong, effective command; and (3) technical measures: the establishment of technical management team to the project manager and chief engineer of the project, led by determined implementation of major technical measures, inspect and supervise the implementation of technology projects. The establishment of technical positions on personal responsibility, technical cadres and skilled workers posts and responsibilities, implementation of strict technical standards, processes, certificates, strict punishments. Strict construction management, strict construction technology, construction strict discipline, and promptly make the archives management of the technical data. Seize the key technology, technology research organization, to develop a scientific construction program. Ensure construction safety, establish and improve production safety assurance system and organization, implementation of security measures and carry on the slope collapsed, falling from heights, mechanical injury, lifting injuries, mechanical overturning, traffic safety and other risk sources focus on prevention. Fourth, deep excavation and support construction labor resource allocation arrangements 4.1 1) investment principles based on the construction of venues and quantities required number of trades, rational organization, there are plans to deploy personnel, as required for specific types of play Heavy, electricians, welders, etc., during construction in strict accordance with ISO9002 Standard requirements, implementation of listed certificates. 2) management organization to strengthen construction site management, the establishment of a strong management organization, from the construction technology, construction safety, construction site, construction supervision and management of information within the industry, and organize construction site. Site construction management organization chart, see "Deep Foundation management organization chart." ① achievement data for each submission displacement observation results table after the displacement observation; ② after the end of the last observation, the author displacement observation, "the amount of displacement - time curve." ③ displacement observation technical summary; ⑻ displacement observation and early warning is to ensure the absolute safety of the slope, must take the information construction, the implementation of dynamic management, dynamic construction, dynamic design. Warning pit deformation values: Supporting structure than the cumulative value of lateral displacement is less than the depth of the excavation 3 ?. Supporting structure than the settlement cumulative displacement and excavation depth of less than 3 ?. When the pit top side, near the settlement displacement deformation warning value, should closely observe the (test), analyze the causes, and to take timely contingency reinforcement measures. Because the accuracy of our instruments is limited, not 
Contact Detail
Company Name: Shandong reconnection lifting and installation works Lt..
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Wang Lei()
Telephone Number: 0531-890528888
Company Address: Jinan, Jinan City, Shandong Province, China
Zip/Postal Code:
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450