Home
Products
Jining machine installation, the preferred Lu lifting, large machine installation method
Jining machine installation, the preferred Lu lifting, large machine installation method
Jining machine installation, the preferred Lu lifting, large machine installation method
Use lifting gear down manually usual precautions chain: the operator should be trained, and slowly pull down chain after hanging objects should be firmly linked not be oblique pull. When a person does not move when pulled, should identify the reasons for prohibiting people yank together. Hand moving gourd: the operator should be trained before using to check the reliability of the self-locking clamp means, when gripping the rope should be able to reciprocate otherwise prohibited. Jack: The operator should be trained, Jack placed on a flat solid ground, and mat board or plate to prevent surface subsidence. Top with smooth hardwood pad contacting surface should prevent sliding. Operation should start gradually lifting, attention to prevent top crooked, always maintain basic balance test method for heavy equipment is installed 1. If there is doubt about the equipment based on the strength of the available Hammer method or the ball hit the mark on the basis of strength The main view of the base surface quality defects or without cellular, Pock, etc. 3. On the basis of the position of the measurement geometry checking:: retest 2. On the basis of visual inspection. The main items to check are the basis of the coordinate position, a different plane elevation, flat dimensions, bosses plane dimensions, pocket size, the degree of horizontal plane, based on the degree of plumb, level and anchor bolts embedded center distance, embedded anchor bolt holes in the center position, deep vertical extent of producing primary cell walls, embedded activity bolt anchor plate elevation, central location, slotted anchor plate and the horizontal extent of the threaded anchor plate Shandong Shandong Machinery Installation Co., Ltd. is a set of equipment installation , lifting, handling, removal of one of the new service companies. So what is the equipment installed it? Is in construction, the device is mounted in place integrally connected work organic. The company has advanced equipment and professional installation tools installation technical operations personnel, to provide a detailed construction program during the operation and safety of the various urgent, difficult, dangerous and heavy lifting equipment engineering.
Contact Detail
Company Name: | Shandong Shandong Machinery Installation Co., Ltd. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Sun Meixia(Manager) |
Telephone Number: | 0531-85535666 |
Company Address: | High-tech Zone Industrial Road 36, , Shandong Province, China |
Zip/Postal Code: | 250100 |
Find More Related Products
- Shandong Laiwu Lu certified..
- Shantui SD22 Series 6711-11..
- Lu in the view of the devic..
- Laiwu Lu in the lifting equ..
- Wedding dresses wedding dre..
- Air conditioning installati..
- Ningbo treatment of cervica..
- Chaoyang Chaoyang fan motor..
- Beijing professional import..
- Beijing Chaoyang change the..
- Daxing fan motor repair pum..
- Lifting equipment handling ..
- To pass professional repair..
- Maintenance of single and d..
- Labor Day is approaching, J..
- Beijing Chaoyang pipeline p..
- Beijing Chaoyang District, ..
- Chaoyang District, pump mot..
- Beijing Chaoyang, Tongzhou ..
- Beijing motor repair pump r..
- Daxing surrounding the fan ..