Home
Products
Huaqiang North conditioning installation, air conditioning repair company in Shenzhen Futian names Kim Jin conditioning installation
Huaqiang North conditioning installation, air conditioning repair company in Shenzhen Futian names Kim Jin conditioning installation
Huaqiang North conditioning installation, air conditioning repair company in Shenzhen Futian names Kim Jin conditioning installation
Air-conditioning installation Requirements 1. Air-conditioning installation room should not be installed where the most heat radiation. 2. Air-conditioning installation height of not more than 3 meters, or at room temperature difficult to come down, if too high, it is best to install the ceiling. 3, the door should be less switch. Avoid cold air spread it out, if the sun is in ample best to install sun visor. 4. Outside the machine should not be installed near the obstacle is not conducive to the air conditioning unit run cooler. 5. Select the air conditioning cooling capacity should match the size of the room area. Not too small, otherwise the room difficult to come down. 6. If the person in the room more and large heat source, select power air conditioning. Otherwise, the air conditioning is difficult to achieve comfort. Air moves, disassembly only matters: First, the test machine: Testing the air conditioner functions work properly before moving machine. Second, the recovery of refrigerants, removal of indoor and outdoor cables; it is best to do a good job marking cable ends, it will not appear the wrong cable may cause failure when installed. Third, keep clean the connecting pipe interface; before installing the docking port, should once again check whether the inside of the bell and dirt, after clearing only cover nuts. As it coincided with rain, but should be open when the connecting tube, wrapped with plastic nozzle, causing the ice to prevent rainwater from entering the block. Fourth, the demolition of the indoor unit, should prevent condensed water into the circuit board; the indoor unit drain pan, drain remained within some of condensate, thus dismantling and moving the indoor unit, the indoor unit is not equipped with a circuit board that head- next, even upside down, and it should be provided with the board this end slightly, allowing water to flow out from the other side, so to avoid condensation water into the circuit board to prevent an electrical power failure. V. To test the connection pipe bell; flare connection on the tube is squeezed due to the long, deep roots, some bell ring indentation, these bell fracture easily, pull off, occurs when the boot air leaks, thus, the bell must be removed after careful examination, the failure must be cut off re-spread, so as to avoid the risk of occurrence. Six out machine handling, installation process, you can not flip, tilt angle is too large, do not use the clutch cut-off valve lift machine. In addition, attention should be paid at the time of transfer machine gently grasp, dismantling program scientific pumping pipe and equitable, moderate intensity and other aspects of the elbow. Air conditioner indoor unit installation location choice: should ensure reasonable airflow running normally, try a certain distance from other household appliances, so as not to interfere with each other. Air conditioner outdoor unit installation location options: to consider environmental protection, the city clean and beautiful with the relevant requirements, and reasonable airflow smooth operation. Buildings along the road on both sides of the installation of the outdoor unit, the bottom of its mounting bracket (when mounting bracket does not affect public transport, you can refer to horizontal mounting surface) strongly from the ground should be greater than 2.5 m; it should as far as possible away from adjacent windows, in order to avoid vibration and noise affect the normal life and work neighbors.
Contact Detail
Company Name: | Futian District, home appliance maintenance services |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Yang Gang() |
Telephone Number: | 0755-88363071 |
Company Address: | Shenzhen, Shenzhen City, Guangdong, China |
Zip/Postal Code: |
Find More Related Products
- AD900 AD900 Product Feature..
- Large equipment relocation ..
- Car battery to join, Wei Li..
- Schindler escalators excell..
- Nanshan District, Shenzhen ..
- Shenzhen Longhua elevator m..
- Wuhan to Haining logistics ..
- Pumps imported to the mainl..
- Ferrer detergents service a..
- Two-way chamfering
- Trimble Total Station maint..
- Specializing in Sundarbans ..
- Dongguan parking fees for p..
- Central air conditioning cl..
- Ferrer detergents really go..
- Electronic brake lever repa..
- Laiwu lifting equipment, Lu..
- Lu technology leadership ch..
- Elevator Maintenance specia..
- BHD2 series flameproof cabl..