Home
Products
To find Lu in FIG handling the installation of water supply and assembly of equipment installation place
To find Lu in FIG handling the installation of water supply and assembly of equipment installation place
To find Lu in FIG handling the installation of water supply and assembly of equipment installation place
Operation Process: Lifting (1) steel piles with prefabricated reinforced concrete column similar. Steel columns can be used for dual-lift crane hoisting methods. When lifting, dual flat steel column while hanging up from the ground after a certain height suspend, remove transport flatbed, then two planes simultaneously rotating the brake open, hanging by the host alone lifting, back straight when lifting steel columns, deputy withdrawal machine, lifting alone by the host, the steel piles inserted into the Bonded Screw fixation. (2) the first proof steel columns until the vertical deviation control within 20mm, so that the crane decoupling. Its verticality with a diameter theodolite test, if the deviation, correct jack. The last correction steel column position to comply with the relevant provisions of misalignment. Then around 10mm thick steel column was positioned fixed with welding, steel columns complex after school, then tighten the anchor bolt and the bearing block and down a fixed spot and prevent walking. Equipment installation is required for this process 8:01 installation should be considered safe and reliable and easy to install, maintenance, use of premises should have adequate lighting and good ventilation. Installation of two devices should not undermine existing protective bulkhead or deck performance and strength in the watertight bulkheads and decks shall not be drilled to screw fastening electrical equipment. 3 in explosive compartments such as battery room, paint houses are not allowed to install non-explosion-proof electrical equipment, vapor tends to accumulate in the place, except where necessary to waterproof equipment, other electrical devices should not be installed. It should not be installed in the cabin of the closing plate 4 electrical equipment, but the branch line of the junction box (box) can be installed in a closed panel easy to open, and open signs should be obvious. 5 installation place if severe vibration, enough to affect normal, when reliable operation, the damper should be located. Electrical equipment installed on the weather deck 6, should ensure watertight, and with a shield. Installation 7 device should be removable fastening and connection should be firm, and to prevent equipment from vibration and loose. The equipment should be tidy, no skew phenomenon. 8 cable core terminal head, shall be provided with clear and durable marker that should be labeled consistent with the terminal and the circuit diagram of the device. When the driver operates lifting, handling equipment shall comply with the following requirements when:.. A limit position limit shall not use live device parking; b shall adjust under load lifting, brake luffing mechanism; c hoisting handling. when people can not from above through, can not someone next boom;. d the crane work shall be carried out inspection and maintenance; when e lifted material to approach or reach the rated lifting capacity, lifting the front brakes should be checked and used after a small height, short stroke lifting, and then decline steadily lifting f no limit position stopper crane hook at the lowest working position, the rope reel design must maintain the required safety laps;. g. When the crane work, boom, spreaders and auxiliary equipment, wire rope, wire rope and heavy wind and other power transmission lines should not be less than the minimum distance specified in Table II;. h mobile cranes, the specification before work should be smooth and downtime venue, firmly and securely lay leg; I. land for non-reverse braking performance crane, except in special emergencies, may not use the car hit the anti-braking.
Contact Detail
Company Name: | Shandong Shandong Machinery Installation Co., Ltd. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Sun Meixia(Manager) |
Telephone Number: | 0531-85535666 |
Company Address: | High-tech Zone Industrial Road 36, , Shandong Province, China |
Zip/Postal Code: | 250100 |
Find More Related Products
- Fukuda certified home elect..
- Shandong Lu Dongying has ce..
- Lu in the company's service..
- Brother now a general view ..
- Welding steering shaft
- Tongan Tongan air condition..
- Local baby nutrition Milk |..
- Chongqing electric car batt..
- Chongqing electric car batt..
- Chongqing electric forklift..
- Supply-sided solar burst of..
- Police manufacturers supply..
- Supply Xinjiang Solar Strob..
- Shanghai R & D expense char..
- Hospital Dongguan Humen goo..
- Kellett Kang lice scabies s..
- Car panoramic sunroof film,..
- Solar traffic lights factor..
- Solar simulation police car..
- Qingdao Which Samsung splic..