Home
Products
Shandong Lu preferred graph handling equipment prices, equipment handling Huaiyin District
Shandong Lu preferred graph handling equipment prices, equipment handling Huaiyin District
Shandong Lu preferred graph handling equipment prices, equipment handling Huaiyin District
Presentation equipment borrowed the truck first, ordinary internal combustion forklifts generally use diesel, petrol, liquefied petroleum gas or natural gas engine as power, load capacity of 1.2 to 8.0 tons, the operating channel width is generally 3.5 to 5.0 m, taking into account the emissions and noise the problem, usually outdoors, workshop or other exhaust emissions and noise do not require special place because of convenient refueling, it can achieve long continuous operation, and competent (such as rain) to work in harsh environments. The first Second, the heavy-duty truck diesel engine as power, load capacity from 10.0 to 52.0 tons, generally used for heavier cargo terminals, steel and other industries outdoor operations. Third, container truck diesel engine as power, load capacity of 8.0 to 45.0 tons generally divided into empty container forklift, heavy container forklift and Reachstacker. applies to container handling, such as a container yard or port terminal operations. Fourth, Sideloader diesel engine as power, load capacity of 3.0 to 6.0 t In the case of not turning, with the ability to take the goods directly from the side of the fork, and therefore mainly used fork to take a long bar goods, such as wood, steel, etc. It should be noted in the demolition and relocation of 5:01, equipment relocation follow: first hours after the large, easy things first, the first principle of the periphery of the host. Disintegration devices must meet should be minimal points, but at the same time have to meet the transport requirements, and ultimately achieve precision performance equipment reinstalled after dismantling consistent with the former. 2, the device prior to demolition, should require the manufacturer to cut off the power and remove the device, and water, gas and other pipeline links, and vented equipment coolant, 3, device during disassembly, for gas cutting, should advance with the factory is responsible for communication and coordination personnel. 4. Removal of the equipment to ensure the absolute safety, to choose appropriate work equipment. 5, the device may not occur when lifting bump, to select the appropriate lifting points slower hanging light, ropes and equipment at the contact to take protective measures. Lifting to find Ben into Wanda Beijing --- lifting rope handling: When handling wire rope must use crane to avoid damage and chaos rope disk volumes phenomenon: no packaging when handling wire rope, wire rope surface allowed stick stone, clay and other foreign bodies affect use. Lifting to find Ben into Wanda Beijing --- lifting rope Storage: Store in a dry and ventilated warehouse, to prevent direct sunlight or heat dry roasted; the rope can not be stacked multilayer Treasury, if a large number of long-term storage of rope , should always be checked and re-coated with lubricant to prevent the process, such as severe corrosion, the section on the rope for scrap rust was found after an emergency rust; if the wire rope on the outside, should be placed on dry ground, with wood paving and covered with tarpaulins. Lifting to find Ben into Wanda Beijing --- lifting rope maintenance: rope during use should be regularly applied to the wire rope lubricants to ensure rust and lubrication, reducing friction and prolong the life of wire rope. Lifting to find Ben into Wanda Beijing --- lifting rope inspection: When using rope, according to relevant provisions of the periodic inspection and test results make a record. Check should include the following items: wire rope wear, broken wires, the lubrication, deformation, sturdy rope connecting portion or end portion, and other anomalies like.
Contact Detail
Company Name: | Shandong Shandong Machinery Installation Co., Ltd. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Sun Meixia(Manager) |
Telephone Number: | 0531-85535666 |
Company Address: | High-tech Zone Industrial Road 36, , Shandong Province, China |
Zip/Postal Code: | 250100 |
Find More Related Products
- Suzuki Ozark250
- Suzuki GSX1300R
- How much a company register..
- Supply Jinan ventilation an..
- Changping motorcycle roadsi..
- Bombardier Can-Am Commander..
- Liquid ring vacuum pump spo..
- Motorcycle electric vehicle..
- Tiantongyuan Amway Nutrilit..
- Motorcycle repair outside C..
- Rescue Shuangjing Shuangjin..
- Lin Cui Road Motorcycle ele..
- Anli Road, Chaoyang Distric..
- Haidian District, home repa..
- Horizontal band saw machine..
- Chongqing electric engineer..
- Chongqing electric sanitati..
- Chongqing electric tricycle..
- Chongqing New Day about jad..
- Chongqing electric cars on ..
- Supply of electric tour bus..