Home
Products
Shandong Lu in the handling of lifting equipment in place lifting equipment lifting handling equipment
Shandong Lu in the handling of lifting equipment in place lifting equipment lifting handling equipment
Shandong Lu in the handling of lifting equipment in place lifting equipment lifting handling equipment
At the time of the mechanical equipment installation, or because of human error is inevitable, equipment installation accuracy is always a slight deviation in the device is installed, only comply with the following requirements required deviation can be ignored. 1, can compensate for use process deviation caused by wear and tear; 2, the rotating stable; 3, to favor related mechanical connections with; 4, can compensate for deviation or after the force caused by the temperature change; 5, no increase in power consumption; 6 that parts under load a smaller force; 7, will help improve the accuracy of the press to be processed is a compact structure versatility press. With a versatile, high production efficiency, the press can be widely used in cutting, punching, blanking, bending, riveting and forming and other processes. By applying strong pressure on the metal blank so that the metal to plastic deformation and fracture process into parts. Large pulley driven by a motor through a mechanical press work triangle belt, drive through the gear pair and clutch slider-crank mechanism, the slider and punch straight down. Mechanical press slide upward in the forging process is completed, the clutch is automatically released, while automatically crank shaft is turned on, the slider stop on a nearby dead. Action 1 in the vicinity of the pipeline, such as over 1.5 meters near the pipeline or pipeline lifting, should advance in the pipe installation protection facilities, and to develop a written plan of lifting the former job disclosure. Clear lifting device models, the arm rotation angle, moving track and control cargo sloshing way to increase custodial staff, warning warning signs. .2 If the operator can not directly see the surrounding circumstances, should designate a person to monitor the distance cranes, cargo and the duct, and at any time alerts and reminders. 3 cargo movement, any part of the edge and the pipe must be located no less than two meters. 4 have been put into use in oil and gas pipelines near the job should be written safety procedures and rules. 5 should be in the operating area located around roadblocks disposal, shall not allow any personnel not directly involved in the operation of entering the area. 6 processing pipeline should be prepared in advance to be touched or broken condition of the emergency measures and after production units responsible for the review. Production units are responsible for the person in charge of this emergency measure to inform its personnel or positions.
Contact Detail
Company Name: | Shandong Shandong Machinery Installation Co., Ltd. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Sun Meixia(Manager) |
Telephone Number: | 0531-85535666 |
Company Address: | High-tech Zone Industrial Road 36, , Shandong Province, China |
Zip/Postal Code: | 250100 |
Find More Related Products
- Recycling Huawei transmissi..
- High recovery Huawei transm..
- Yuxi Solar LED solar street..
- Qingdao, Shandong preferred..
- Supply a family of four man..
- Pigtailed splitter recovery..
- Xi'an Apple 6 installments ..
- Supply of automotive protec..
- Supply of automotive protec..
- Wholesale custom aftermarke..
- Supply
- Dalian Depression repair
- Pigtailed splitter recovery..
- Shanghai transmission repai..
- Sales Jiangxi wood flower b..
- Yongzhou high recovery of p..
- Disposable automotive after..
- Wuhan, the most professiona..
- Wuhan auto glass repair, au..
- Wuhan auto glass repair, au..
- Audi Q7 automobile transmis..