Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Handling lifting reconnection Figure _ _ Shandong handling lifting equipment

Handling lifting reconnection Figure _ _ Shandong handling lifting equipment
Handling lifting reconnection Figure _ _ Shandong handling lifting equipment
Handling lifting reconnection Figure _ _ Shandong handling lifting equipment

Larger photo of automa dispenser

Company:Shandong reconnection lifting and installation works Lt..
Information Name: Handling lifting reconnection Figure _ _ Shandong handling lifting equipment
Update Time:2015-04-29
Validity:99999
Specifications:
Quantity:
Price Description: RMB/
Inquire Now
Site security staff to deal with scaffolding, mast, tower cranes and other construction equipment collapse accident cause analysis, development of appropriate corrective measures for handling reports of casualties fill out report forms, accident investigation and reporting corporation emergency rescue leading group. Sent to hospital immediately after the (11) should be subject to fracture with a splint and other simple fixed promptly. 4, in the excavation process, such as the case of the following circumstances, the appropriate measures and methods to be taken: 1) When the supporting structure surface cracks must be promptly clay or cement block. 2) When the side wall of the supporting structure when soil water leakage, plugging water should take timely and effective measures. 3) excavation deformation exceeds the allowable value or when premonitory should immediately adopt the following measures: 1 earth excavation, excavation of the construction program: Surveying → tangent stratified excavation (excavation With earth excavation segments simultaneously) → row, precipitation → repair slope, slope → → left foot base leveling soil and other reservation. 2, excavation, construction of 10 to 15% need ramps to digging out timely transport vehicles. 3, earth excavation preparatory work before: former earth excavation, construction of drainage work to do around the building. Do drains, flood control ditch, drainage ditches and other projects, dredging site drainage, to avoid building near the site water. 
Contact Detail
Company Name: Shandong reconnection lifting and installation works Lt..
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Wang Lei()
Telephone Number: 0531-890528888
Company Address: Jinan, Jinan City, Shandong Province, China
Zip/Postal Code:
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450