Home
Products
Binzhou lifting equipment, Lu in the company of choice for maps, large equipment hoisting
Binzhou lifting equipment, Lu in the company of choice for maps, large equipment hoisting
Binzhou lifting equipment, Lu in the company of choice for maps, large equipment hoisting
150mm, flat top reserve must be marked with the tag line, wiring for the phase line into the switch, the zero line into the lamp, the zero line into the cap, the face of the socket to the left and right relative to the ground zero; switch socket must be secured to the correct position, tighten affixed to the wall. The same room, the box on the same level; switches, sockets conventional height (in the old floor computing), a horizontal line must be a unified standard installation. Hydropower installation and construction organization planning preparation of the content and requirements. Pipeline installation and construction organization plan is a programmatic document guiding the construction and installation in the construction process to arrange organized according to the foreman of construction organization planning requirements. But now the real construction design by guiding the construction is relatively rare, common problem is targeted construction design, operability is not strong. Reminded to do to guide the construction, "construction design" prepare content to reach at least the following requirements: 1. Installation before water and electricity can not simply be copied design description, but should be in the form of the building, storey, structure practices, including walls, floors, especially between bathroom and kitchen floors and walls practice vividly described, as well as wall insulation, partition walls practice, in addition to introducing the division of engineering contracting and construction features of the range. 2. The layout design must be based on the current effective construction contract (agreement), construction drawings, atlas, construction inspection standards, inspection and evaluation standards, local regulations and labor quotas. 3. The installation of water-construction preparations include technical preparation, physical preparation, construction site preparation. Technical preparation reflects the advanced technology, including joint trial preparation of construction drawings and design, technical tests.
Contact Detail
Company Name: | Shandong Shandong Machinery Installation Co., Ltd. |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Sun Meixia(Manager) |
Telephone Number: | 0531-85535666 |
Company Address: | High-tech Zone Industrial Road 36, , Shandong Province, China |
Zip/Postal Code: | 250100 |
Find More Related Products
- Tianjin Tianjin station sel..
- Taiyuan to Zhenjiang logist..
- Printing lets you could not..
- Tianjin Tianjin station sel..
- Kim Hong Xiangyang machiner..
- Hangzhou 24 hours for compu..
- Lifting installation crane ..
- Jinan lifting installation,..
- Equipment relocation equipm..
- Shanghai Minhang District, ..
- Shanghai to spring installa..
- Shanghai high priority acce..
- Heze lifting machine instal..
- Chaoyang District, installa..
- Pig hair hairnet Ads Softwa..
- Shanghai maintenance and in..
- Shanghai Access Installation
- Shanghai Shanghai installed..
- Shanghai glass door repair ..
- Shanghai Xuhui District mai..