Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Jiading professional contractors plastic Floor

Jiading professional contractors plastic Floor
Jiading professional contractors plastic Floor
Jiading professional contractors plastic Floor

Larger photo of automa dispenser

Company:Thousands of Shanghai Yang Sports Facilities Engineerin..
Information Name: Jiading professional contractors plastic Floor
Update Time:2015-04-28
Validity:300
Specifications:13MM
Quantity:1000000.00
Price Description: RMB/
Inquire Now
Bottom Base EPDM plastic floor construction scheme to claim 6, asphalt concrete pavement or hydraulic soil basis, and requires a certain strength and stability (cement concrete foundations need to cut expansion joints, waterproofing can not do.) 7, foundation and due to the non-production of cracks caused by freezing frost cloth uniform. 8, there must be a better foundation flatness and a specified slope. 9, the surface must be flat to ensure drainage 10, the surface should be kept clean and dry basis, after the completion of the foundation, the stringent requirements of more than 21 days of the maintenance period. Construction process requirements. 9, construction classification, there are two construction technology, mechanical and manual pavement paving. 10. Surface treatment: on the basis of compliance with the requirements, first clean the surface with butyl, can not exist any stolen goods, dirt, water (including watermarks), oil and the like. After cleaning, apply evenly on the basis primer (glue by 3-4: 1 ratio, stir), to enhance its bonding capacity with the ground, to avoid irreparable consequences. 11, must pay attention to what issues do sample test before construction. c, application of material, such as feed ratio, material curing time is normal. d, 24 hours later to see if there is not a solid phenomena and adhesion, strength and other properties to meet the requirements. 12, pre-construction preparation work (hand) materials, tools and equipment (closed, Gunzi, soapy water, car, consumption, mixer, etc.) / Aids and catalyst preparation. 13, construction personnel requirements (manual) standard runway construction workers no less than a minimum of six people: preparation for two, two haul, paving two. 14, construction (hand) will be expected to press the proportional mix well and pour into the venue paving, heating (burner heating) or stick clappers soapy water after making real, shoot flat seams, to maintain the overall level. 15, the venue thickness requirements: general construction in two to 13mm for example:? General 5mmEPDM underlying 8mm rubber particles and particles 16, construction precautions (hand) h, best construction temperature 15-53 i, used paving tools (commonly known as push knife). j, mixing stirring must be sufficiently uniform. k, each batch must be convergence, otherwise there will be convergence of bad joints. l, while trimming must be neat. m, must be in strict accordance with the proportion of ingredients. Depending on the particle on the circumstances, a good amount of water with glue, glue with a large difference; large with less, less than the amount. n, after the site well, cleaning up the site remaining residue, the entire site appearance 
Contact Detail
Company Name: Thousands of Shanghai Yang Sports Facilities Engineerin..
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Wu Hejun(Manager)
Telephone Number: 021-39250075
Company Address: Xiqing Road, Qingpu District, Shanghai, Shanghai, Shanghai, China
Zip/Postal Code: 201700
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450