Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Supporting steel bridge, embedded steel beam bottom wedge leveling steel, bridge steel Hengshui crown and bridge tilting pad manufacturers to provide custom processing

Supporting steel bridge, embedded steel beam bottom wedge leveling steel, bridge steel Hengshui crown and bridge tilting pad manufacturers to provide custom processing
Supporting steel bridge, embedded steel beam bottom wedge leveling steel, bridge steel Hengshui crown and bridge tilting pad manufacturers to provide custom processing
Supporting steel bridge, embedded steel beam bottom wedge leveling steel, bridge steel Hengshui crown and bridge tilting pad manufacturers to provide custom processing

Larger photo of automa dispenser

Company:Crown and Bridge Engineering Hengshui Rubber Co.
Information Name: Supporting steel bridge, embedded steel beam bottom wedge leveling steel, bridge steel Hengshui crown and bridge tilting pad manufacturers to provide custom processing
Update Time:2015-04-28
Validity:360
Specifications:Complete specifications
Quantity:80000.00
Price Description: RMB/
Inquire Now
 Hengshui crown and bridge homegrown manufacturers, the supply of high-quality steel bridge supporting series, model complete, quality and cheap, welcome to inquire leveling plate in highway bridge construction process, in addition to installing highway bridge expansion joints and highway bridge rubber bearings rubber water-stop outside. In order to bridge rubber bearing force uniform, shear deformation. Bridge rubber bearing rubber bearing top and bottom, respectively, as well as supporting steel, bearing steel frame made for railway bridges, roads and bridges, Bridge and other. It requires a high strength, toughness and withstand impact loads and rolling stock, and have a good fatigue resistance, low temperature toughness and void certain weather resistance, leveling bridges between the plate and pad stone but also with epoxy mortar filling, compacting is necessary to ensure the gap again to achieve the same strength and pad stone. After the seat is installed, the embedded steel beam bottom bearing and bearing cover plate bolts connecting. (1) leveling steel bridge construction preparation work: piles in front of the mouth into the groove at the tip of the pile should be closed to prevent dirt squeeze, locking should be coated with butter or other fats. For disrepair, locking distortion, severe corrosion of steel sheet pile, should be renovated to correct, bending the pile, available hydraulic jacking pressure or huohong other methods to correct. (2) Piling division of water segment. (3) In the piling process. To ensure the verticality of the sheet piles. It is controlled in both directions with two theodolites. (4) the position and orientation of the start of a play set, two pieces of sheet piles shall ensure precise to play a guiding role model, it should be measured once each into the 1m, immediately after the fight to a predetermined depth with steel or steel and purlin bracket welded for temporary fixation. Above all is the crown and bridge projects in Hengshui Rubber Co. gathered from practical work according to customer problems encountered, for reference, if there are questions, please timely communication, correction. Bridges also known as general leveling plate bearing embedded steel beam bottom plate, wedge plate, leveling plate, bridge bearings under the plate, bridge bearings supporting steel on steel bridge bearings, bridge bearings top and bottom plates, rubber Supporting bearing steel, rubber bearing steel, steel, rubber bearing rubber bearing under the upper and lower plates.
Contact Detail
Company Name: Crown and Bridge Engineering Hengshui Rubber Co.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Xiao Yu Fei(Sales Manager)
Telephone Number: 0318-5376968
Company Address: Beijing road Rubber City, Hengshui City, Hebei Province, China
Zip/Postal Code: 053000
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450