Children backhoe / excavator Teng-hui factory direct children's play
Children backhoe / excavator Teng-hui factory direct children's play
Control panel Operating Instructions (1) query / set button: short key queries (volume / time / number of coins / count, 4 voice broadcast cycle); long button to enter the set state (setting number of coin / analogue sound settings / flash settings / setup is complete, each time you press the button four states long rotation switch, with buttons 2 and 3 buttons to set the function you need or value) set-up mode no key input delay 10 seconds automatically exit the setting mode, ( 2) Volume / Time Set button plus: a short key to adjust the volume (Adjusting the volume when the standby machine downtime, machine work adjust the volume of work at the time,) with the setting button sets the status adjusted time value; long buttons to adjust the time (swing machine shutdown) from 1 to 10 minutes (3) Volume / Time Set button Less: Function as with key 2, press 2 a cumulative upward, downward minus a key 3; (4) Time indicator, one minute flash once , two minutes flashing twice, with some on, 10 minutes flash ten times; (5) working volume indicator, volume 2 to 25 adjustable volume is high: bright lighting time long dark time is short, low volume short and long dark time. (6) SD card slot: Put the SD card is inserted into SD swing song work; otherwise play song memory; (7) counter (8) load (motor) Fuse (20A 250V) Notes 1. This machine uses the environment The temperature should be 5-40 ℃, does not apply where there may be the use of water splashing. 2. winter when the outdoor work load running 10 minutes or replace the hydraulic oil. 3. The machine should be smooth and prevent the use of expansion bolt to prevent rollover. The surrounding fence should be installed during machine operation prohibition pedestrian walk around the fence. 5. Use the carrying capacity of more than 15A leakage protection switch, power cord and plug / seat; and make sure the ground wire connected to the ground effectively. 6. To prohibit the operation in the case of young children unattended. 7. fasteners regularly check on the device are loose or fall off, regularly filling oil, run 1 to 2 years according to the nature of the decision whether to replace hydraulic oil hydraulic oil.
Contact Detail
Company Name: | Ji Ningdeng Hui trade Limited |
---|---|
Employee Number: | |
Annual export: | |
Year Established: | |
Contact Person: | Mr. Jingli() |
Telephone Number: | 0537-3202258 |
Company Address: | The 10th District in any way electromechanical Winterthur Business Park Street, Jining City, Shandong Province, China |
Zip/Postal Code: | 272000 |
Find More Related Products
- Which line from Shenzhen to..
- Haimen outdoor plastic bask..
- MOLEX503948051 love letter ..
- MOLEX39000040, MOLEX, love ..
- Shanghai Pudong airport pri..
- Curing Box | concrete curin..
- Shenzhen Spring Machine nat..
- Guangzhou computer spring e..
- East Bao Shu eye stickers H..
- Barrier systems distributor..
- Basaltic barrier system pri..
- Ailing broker 18620555299
- What sports do breast fast
- Hebei Giantextile DMC serie..
- Changzhou freight trains to..
- Sinopec response strategy H..
- Chengdu Huadu direct shippi..
- Net use bulletproof, bullet..
- Diamond Bulletproof Network..
- Fairmont Chengdu logistics ..