Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Taiyuan liquefier price _ _ liquefier Shanxi Rising energy and environmental protection equipment

Taiyuan liquefier price _ _ liquefier Shanxi Rising energy and environmental protection equipment
Taiyuan liquefier price _ _ liquefier Shanxi Rising energy and environmental protection equipment
Taiyuan liquefier price _ _ liquefier Shanxi Rising energy and environmental protection equipment

Larger photo of automa dispenser

Company:Shanxi Environmental Protection Equipment Co., Ltd. Ris..
Information Name: Taiyuan liquefier price _ _ liquefier Shanxi Rising energy and environmental protection equipment
Update Time:2015-04-27
Validity:0
Specifications:Limited
Quantity:
Price Description: RMB/
Inquire Now
Shanxi Rising energy and environmental protection equipment emergency device when high pressure gas equipment accident, in order to prevent direct damage to other equipment, cutting equipment must be installed in the pipeline connecting the device, install the quick disconnect valve if necessary. Rapid shut-off valve leakage have strict rules. In case of fire prone, consider the structure of the gas regulator from fire resistance, fireproof coatings or other methods. There are fire emergency equipment bag liquefier, which within a few minutes you can put the bag of material containing layers of ceramic fiber or fiberglass; you can also use the link protection method Taiyuan hotel kitchen liquefier, gripping You can use some of the fusible element rod, electric rod, the rod when the heat started a fire hazard in time off Taiyuan restaurant canteen liquefier, the valve is moved to the position of an insurance. To sum up, in fact, no gas regulator box and we thought it would be complicated, but it is also very safe to use his convenience. Rising Shanxi Environmental Protection Equipment Inspection (1) Check the water level daily ◇ check the water level at the required level in the standard, see the device label; ◇ observe the water temperature is within the normal operating range; ◇ check inlet and the outlet pressure; ◇ Open regular discharge pipe drain valve residue and dirt; ◇ confirm each valve switch gasifier is normal (usually gauge, ball valve should be "open", sewage, drain valve should be "off") ; ◇ confirm whether the voltage and current within the specified range. (2) periodic inspection ◇ month: internal inspection of electrical wiring tray loose (must power off before inspection); ◇ six months: the replacement tank water (purified water), plus rust; ◇ year: 1 ) pressure gauge inspection; 2) safety valve inspection; 3) three-phase electric heaters and insulation resistance tests balanced; 4) Check the float; 5) the body and electrical equipment grounding resistance test disc; 6) electrical connection insulation test; airtight 7) Check the device and the junction; 8) partial pressure of the pressure test (strength and air tightness test). (3) Except for the contents of one year of the biennium to check outside, replace part of the consumable operating status, a comprehensive inspection equipment and airtight joints, the pressure part of the pressure test (strength and airtight Experiments). Notice ◇ To prolong the life of the gasifier and reduce failures, the quality of liquefied petroleum gas shall comply with GB510028-93 "town gas design" in the corresponding index requirements. Rising Shanxi Environmental Protection Equipment Inspection (1) Check the water level daily ◇ check the water level at the required level in the standard, see the device label; ◇ observe the water temperature is within the normal operating range; ◇ check inlet and the outlet pressure; ◇ Open regular discharge pipe drain valve residue and dirt; ◇ confirm each valve switch gasifier is normal (usually gauge, ball valve should be "open", sewage, drain valve should be "off") ; ◇ confirm whether the voltage and current within the specified range. (2) periodic inspection ◇ month: internal inspection of electrical wiring tray loose (must power off before inspection); ◇ six months: the replacement tank water (purified water), plus rust; ◇ year: 1 ) pressure gauge inspection; 2) safety valve inspection; 3) three-phase electric heaters and insulation resistance tests balanced; 4) Check the float; 5) the body and electrical equipment grounding resistance test disc; 6) electrical connection insulation test; airtight 7) Check the device and the junction; 8) partial pressure of the pressure test (strength and air tightness test). (3) Except for the contents of one year of the biennium to check outside, replace part of the consumable operating status, a comprehensive inspection equipment and airtight joints, the pressure part of the pressure test (strength and airtight Experiments). Notice ◇ To prolong the life of the gasifier and reduce failures, the quality of liquefied petroleum gas shall comply with GB510028-93 "town gas design" in the corresponding index requirements. Taiyuan liquefier price _ _ liquefier Shanxi Rising energy and environmental protection equipment provided by the Environmental Protection Equipment Co., Ltd. Shanxi sun. Shanxi Environmental Protection Equipment Co., Ltd. Rising Sun (www.sxxrn.com) strong, credible, in Taiyuan, Shanxi boiler softened water treatment equipment industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the sun can burn your hand in the machine and into the brilliant, for a better future! 
Contact Detail
Company Name: Shanxi Environmental Protection Equipment Co., Ltd. Ris..
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Zhang()
Telephone Number: 0351-3089088
Company Address: A seat Xinghualing North Park Avenue, Unit 2, 1406 安金丽, Taiyuan, Shanxi, China
Zip/Postal Code: 030000
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450