Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Henan Construction company gas stations, day Yuen Industrial (certified), gas station

Henan Construction company gas stations, day Yuen Industrial (certified), gas station
Henan Construction company gas stations, day Yuen Industrial (certified), gas station
Henan Construction company gas stations, day Yuen Industrial (certified), gas station

Larger photo of automa dispenser

Company:Henan Industrial Co., Ltd. Japan
Information Name: Henan Construction company gas stations, day Yuen Industrial (certified), gas station
Update Time:2015-04-25
Validity:0
Specifications:Limited
Quantity:
Price Description: RMB/
Inquire Now
 Requirements to build gas stations: Fourth, LPG tanks sprinkler on the ring using the method according to the fire drill pipe "norms" Article 6.9.1 "LPG tanks should set a fixed sprinklers. Water sprinklers strength of not less than 0.15L / s.m2. "Some liquefied LPG tanks stood fixed spray device used in pipeline fire ring direct drilling holes open way, although completion of the new LPG gas station to use the kind of intensity sprinkler spray visual effects generally satisfactory, atomizing effect can barely qualified gas station, gas station storage tanks, liquefied gas station but after a period of time to run gas stations, Drilling is due to the natural erosion in the air, leading to the occurrence of the inclination direction of the hole, the diameter changes occur formalities gas stations, spray strength, atomizing effect can not achieve specification requirements, and will greatly reduce the fire protection system water pressure. The use of spray nozzles installed sprinklers fixed manner, in addition to part of nozzle clogging may occur outside, spray strength, atomization, fire protection system pressure can basically meet the requirements and specifications, and nozzle clogging problem can be installed through the process and design improvements to resolve. Therefore, the fixed sprinkler LPG tanks should stick with spray nozzle method, not because of easy construction and temporary in order to reduce input costs, and by way of the ring of fire control direct drilling. Gas station construction approval and construction process description [newspaper] (1) preliminary design report the fire, environmental inspection, marking out, according to stereotypes gas station, gas station consulting, safety supervision and handle three simultaneous security certificate; (2) preliminary design The total level diagram (including fire protection, environmental protection, safety supervision and marking stereotypes) reported plans examination, investigation, draw the red line; (3) plans to deal with project license; (4) the construction of treatment works construction permit; Henan build gas stations The company, Japan Yuen Industrial (certified), gas stations, Ltd. Henan day by Yuen Industrial. Henan Industrial Co., Ltd. Japan (www.riyuan.com) is Zhengzhou, natural gas leader, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the days leading source Industrial staff warmly welcome all inquiries negotiations to create a better day Yuen Industrial future. 
Contact Detail
Company Name: Henan Industrial Co., Ltd. Japan
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Di Jingli()
Telephone Number: 0371-66612697
Company Address: Zijin Road, Zhengzhou City, East Street, Yuhong Garden, 13th Floor, Block D, C households, Zhengzhou City, Henan Province, China
Zip/Postal Code: 450000
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450