Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Relocation of equipment in place, the technology leader Lu (certified), Heze equipment relocation

Relocation of equipment in place, the technology leader Lu (certified), Heze equipment relocation
Relocation of equipment in place, the technology leader Lu (certified), Heze equipment relocation
Relocation of equipment in place, the technology leader Lu (certified), Heze equipment relocation

Larger photo of automa dispenser

Company:Lu in Shandong Machinery Installation Co., Ltd.
Information Name: Relocation of equipment in place, the technology leader Lu (certified), Heze equipment relocation
Update Time:2015-04-24
Validity:0
Specifications:Limited
Quantity:
Price Description: RMB/
Inquire Now
Equipment and comprehensive consideration of the decomposition, the decomposition and re-installation of heavy equipment to move, convenient package under consideration to maintain the required accuracy of the original condition, there are contradictions between the two should be to ensure the accuracy and performance does not change prevail. Each line (equipment) limit stops, limit switch equipment relocation costs, non-contact switch, under the conditions permit, try not to remove, and then adjusted to reduce the installation work must be removed and must be position the workpiece probe sender of strict (or stop) the relative position and distance, mark the mounting position plant removal, and make records, draw sketches. According to the principle of total demolition, combined with the actual situation of each device to determine the number of major disassembly pieces, each piece of the estimated dimensions and weight, should be drawn before the demolition measured relative size of each part, to draw the necessary piping system diagram equipment removal, protective measures for running rails, power head and a variety of sensing elements. Demolition should be removed after the demolition of the branch pipe mains, last stand, the disintegration of the pipeline in other pieces of equipment dimensions are no longer demolished when the device is connected by a hose, connect and disconnect the tubes after lashing the hose onto the device pay particular attention to the following points when removing: equipment relocation place, Lu leading technology (certified), relocation of equipment provided by the Shandong Heze in Shandong Machinery Equipment Installation Company. Shandong Lu Machinery Installation Co., Ltd. (www.sdlzqz.com) Shandong Jinan, industrial maintenance, installation of leaders, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. Lifting leadership in Shandong Lu staff warmly welcome all inquiries negotiations to create Shandong Lu lifting a better future. 
Contact Detail
Company Name: Lu in Shandong Machinery Installation Co., Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Manager Zhao()
Telephone Number: 0531-85535666
Company Address: Jinan High-tech Zone Industrial Road 36, Jinan City, Shandong Province, China
Zip/Postal Code: 250100
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450