Login | Join Free | Post supplying Leads | Post Buying Leads | Help | China Site China Business News
Home Products

Xuchang build drainage board Welcome

Xuchang build drainage board Welcome
Xuchang build drainage board Welcome
Xuchang build drainage board Welcome

Larger photo of automa dispenser

Company:Tai'an City Jia Shuo Building Materials Co., Ltd.
Information Name: Xuchang build drainage board Welcome
Update Time:2015-04-23
Validity:999999
Specifications:Complete
Quantity:99999.00
Price Description: RMB/
Inquire Now
Xuchang build drainage board to welcome you all day 15,588,570,788 Sales Hotline: 155-8857-0788 Mr. Sun look forward to working with you! Provide test reports ISO9000 certification, please rest assured that order drainage board manufacturers I produced indicators have been through the national quality inspection, component detecting welcome customers to order products introduced 155 + 8857 + 0788 drainage board is made of polystyrene (HIPS), or is made of polyethylene plastic plate after punching cone penetration units (or hollow cylindrical porous) from the top surface of the plastic cone projections access layer of filter geotextile to prevent soil particles through, thus avoiding the drainage channel obstruction, so that smooth drainage. The traditional use of brick tile drainage as a guide filter layer, the use of more pebbles or gravel as a filtration layer, the water discharged to the designated place. Now replace the pebbles treatment layer with a drain to drain is saving time, effort and energy saving investment, but also reduce the load of the building. Product Features: 155 * 8857 * 0788 good drainage system for normal use and life cycle of construction and civil engineering structures play an important role. HW type Drainage Board porous tubes with an effective drainage system sparse, long and short cylindrical drain and geotextile form a drainage system, to form a water seepage, water and drainage systems. Usage: 155 * 8857 * 0788 Garden Project: garage roof greening, roof garden, soccer fields, golf courses, beach projects Municipal engineering: road embankment, subway tunnels Construction: building the basis of the upper or lower, basement and outside walls, roof impermeable insulation and other transportation projects: roads, railway embankment, dams and slope protection layer laying procedures: 155 * 8857 * 0788 1. Clean laying waste site, cement screed, so that there is no obvious bump at the scene, an outdoor garage roof and roof Gardens need to find the slope of 2-5 ‰. 2. Green roofs and outdoor garage roof greening can be equipped with a porous pipe use, so can drain water discharged discharged concentrated near water pipes under or near the city sewer 155 * 8857 * 0788 3. ground water seepage in the basement, in Overhead floor above the foundation, which is done in front of the floor drain is to do one round projections downward, left around the blind ditch, up the mountain groundwater seepage flow into the surrounding natural blind ditch drainage board through space, then into the sump through blind ditch. The interior basement seepage water, the body can be laid on the building wall drainage board, round projections for the main walls, drainage board outside and then a layer of single-wall masonry or cement powder steel mesh to protect the drainage board, so space outside wall seepage board straight down the inflow blind ditch directly caused sump. 5. In any lot laying drainage board, must be careful not to let dirt, cement, sand and other trash into the front space of the drainage board to ensure the smooth flow of the drainage board space. 155-8857-0788 6. When laying drainage board as well protection measures, dimensions, or outdoor garage laying drainage board should backfill work in a timely manner as soon as possible, to prevent large wind in laying drainage board affect quality; and interior basement waterproofing to do as soon as a protective layer to prevent drainage board is damaged or things. 7. 155,885.707.88 cohesive backfill is in need shop geotextile 3-5 cm above the sand is ideal, in favor of geotextile filtration; as backfill is a nutritive soil or light Soil quality is no longer laying a layer of sand, the soil itself is very loose very easy treatment. 8. Drain in laying the right side and take the next 1-2 edge fulcrum, you can touch the bottom two together, the above use of geotextile overlap, as long as they do not enter the soil drainage board drainage channel can maintain drainage flow . Construction Notes 155-8857-07881, in the dry, ventilated storage environment drainage board, to prevent exposure, away from fire. 2, please stand up or lie flat drainage protection board, not tilted or cross horizontal pressure, stacking height not more than three layers, avoid heavy heap pressure. 3, laying should be smooth natural downslope or according to the laying of water. 155 + 8857 + 07884, single shop geotextile lap guarantee 150cm, lap by glue or sand compaction avoid moving, and then backfill, the first layer of compacted backfill guarantee before the next step, stratified backfill must be compacted. 155 + 8857 + 0788 Contact: Mr. Sun phone: 15588570788 0538-6301561 QQ: 652393567 http://www.jiasujiancai.com 
Contact Detail
Company Name: Tai'an City Jia Shuo Building Materials Co., Ltd.
Employee Number:
Annual export:
Year Established:
Contact Person: Mr. Mr. Sun(Sales Manager)
Telephone Number: 0538-6301561
Company Address: Eastern zone, Taian City, Shandong Province, China
Zip/Postal Code: 271000
About us | Partnership | Services | Payment | Contact Us | Site Map | Help
International Sites: International Site | China Site | CG160 | YPSort
Terms & Conditions - Disclaimer Copyright © 1999 - B2B168.Com Ltd. All rights reserved. ICP B2-10089450